QCS

Q 2010 Ackn
nowledgem
ments Page 1

CONTENTS

SECTION
S 1 ---------------- GENERAL
P 1 ------------------------- Introduction
Part
P 2 ------------------------- Use and Ma
Part aintenance off the Site
P 3 ------------------------- Site Access and Entry o
Part onto the Site
P 4 ------------------------- Protection
Part
P 5 ------------------------- Interference
Part e
P 6 ------------------------- Project Mee
Part etings
P 7 ------------------------- Submittals
Part
P 8 ------------------------ Quality Assu
Part urance
P 9 ------------------------- Materials
Part
P 10 ----------------------- Health and Safety
Part S
P 11 ----------------------- Engineers Site
Part S Facilitiess
P 12 ----------------------- Contractors
Part s Site Facilitie
es
P 13 ----------------------- Setting Out of the Workss
Part
P 14 ----------------------- Temporary Works
Part W and EEquipment
P 15 ----------------------- Temporary Controls
Part C
P 16 ----------------------- Traffic Diverrsions
Part
P 17 ----------------------- Project Co-o
Part ordination
P 18 ----------------------- Other Contrractors
Part
P 19 ----------------------- Regulatory Requirementts
Part
P 20 ----------------------- Clearance of
Part o the Site
P 21 ----------------------- Inspection and
Part a Handove er Procedurees
P 22 ----------------------- New Techno
Part ologies and IInnovations

SECTION
S 2 ---------------- BUILDING DEMOLITIO
D ON
P 1 ------------------------- General
Part
P 2 ------------------------- Building Dem
Part molition
P 3 ------------------------- Hazardous Materials
Part M

SECTION
S 3 ---------------- GROUND IN NVESTIGAT TION
P 1 ------------------------- General
Part
P 2 ------------------------- Boreholes
Part
P 3 ------------------------- Pits and Tre
Part enches
P 4 ------------------------- Soil Samplin
Part ng
P 5 ------------------------- in-Situ Testing, Instrume
Part entation and Monitoring
P 6 ------------------------- Laboratory Testing
Part T

SECTION
S 4 ---------------- PILING
P 1 ------------------------- General Req
Part quirements ffor Piling Wo
ork
P 2 ------------------------- General Req
Part quirements ffor Concrete Piles
P 3 ------------------------- Precast Reinforced and Prestressed
Part d Concrete Piles
P 4 ------------------------- Precast Reinforced Con crete Segme
Part ental Piles
P 5 ------------------------- Bored Cast--In-Place Pile
Part es
P 6 ------------------------- Bored Piles Constructed
Part d Using Conttinuous Flight Augers andd Concrete or
o Grout
Injection Through Holloww Auger Stem ms

QCS
S 2010
QCS
Q 2010 Ackn
nowledgem
ments Page 2
Part
P 7 ------------------------- Driven Castt-In-Place Pil es
P 8 ------------------------- Steel Piles
Part
P 9 ------------------------- Steel Sheet Piling
Part
P 10 ----------------------- Static Load Testing Of P
Part Piles
P 11 ----------------------- Alternative Methods
Part M Testing Piles
for T s
P 12 ----------------------- Reduction of
Part o Friction on Piles
P 12 ----------------------- Reduction of
Part o Friction on Piles

SECTION
S 5 ---------------- CONCRETE E
P 1 ------------------------- General
Part
P 2 ------------------------- Aggregates
Part
P 3 ------------------------- Cement
Part
P 4 ------------------------- Water
Part
P 5 ------------------------- Admixtures
Part
P 6 ------------------------- Property Re
Part equirements
P 7 ------------------------- Batching and Mixing
Part
P 8 ------------------------- Transportatiion and Placcing Of Concrete
Part
P 9 ------------------------- Formwork
Part
P 10 ----------------------- Curing
Part
P 11 ----------------------- Reinforceme
Part ent
P 12 ----------------------- Joints
Part
P 13 ----------------------- Inspection and
Part a Testing O Of Hardened d Concrete
P 14 ----------------------- Protective Treatments
Part T fo
or Concrete
P 15 ----------------------- Hot Weathe
Part er Concreting g
P 16 ----------------------- Miscellaneo
Part ous
P 17 ----------------------- Structural Precast Conc rete
Part
P 18 ----------------------- Prestressed
Part d Concrete
P 19 ----------------------- Testing of Water
Part W Retainiing Structure
es

SECTION
S 6 ---------------- ROADWOR RKS
P 1 ------------------------- General
Part
P 2 ------------------------- Site Clearan
Part nce
P 3 ------------------------- Earthworks
Part
P 4 ------------------------- Unbound Pa
Part avement Matterials
P 5 ------------------------- Asphalt Worrks
Part
P 6 ------------------------- Concrete Ro
Part oad Paveme ents
P 7 ------------------------- Vehicle Crash Barriers
Part
P 8 ------------------------- Kerbs, Footw
Part ways and Pa aved Areas
P 9 ------------------------- Fencing
Part
P 10 ----------------------- Traffic Signs
Part s, Markings a
and Studs
P 11 ----------------------- Works in Re
Part elation To Se
ervices
P 12 ----------------------- Road Lightin
Part ng
P 13 ----------------------- Traffic Signa
Part als
P 14 ----------------------- Road Draina
Part age
P 15 ----------------------- Geosynthetiics
Part
P 16 ----------------------- Miscellaneo
Part ous

SECTION
S 7 ---------------- GREEN CO ONSTRUCTIO ON
P 1 ------------------------- Introduction
Part
P 2 ------------------------- Qatar Susta
Part ainability Asssessment Sys
stem - QSAS
S

QCS
S 2010
QCS
Q 2010 Ackn
nowledgem
ments Page 3
Part
P 3 ------------------------- Energy
P 4 ------------------------- Water [W]
Part
P 5 ------------------------- Indoor Envirronment
Part
P 6 ------------------------- Cultural and
Part d Economic V
Value

SECTION
S 8 ---------------- SEWERAGE
P 1 ------------------------- General
Part
P 2 ------------------------- Earthworks
Part
P 3 ------------------------- Pipes and Fittings
Part F Materrials
P 4 ------------------------- Pipeline Insttallation
Part
P 5 ------------------------- Valves, Pen
Part nstocks and A Appurtenanc
ces
P 6 ------------------------- Miscellaneo
Part ous Metal Wo orks
P 7 ------------------------- Miscellaneo
Part ous GRP Wo rks
P 8 ------------------------- Protective Coatings
Part C and Painting
P 9 ------------------------- Trenchless Pipeline Con
Part nstruction
P 10 ----------------------- Pipelines Cleaning and Inspection Survey
Part S
P 11 ----------------------- Sewer Reha
Part abilitation
P 12 ----------------------- Vacuum Sew
Part werage Systtem

SECTION
S 9 ---------------- MECHANIC CAL AND EL LECTRICAL EQUIPMENT
P 1 ------------------------- General
Part
P 2 ------------------------- Submersible
Part e Pumps
P 3 ------------------------- Centrifugal Sewage
Part S Pummps (Dry-We et Well)
P 4 ------------------------- Centrifugal Pumps
Part P (Splitt Casing Typpe)
P 5 ------------------------- Archimedian
Part n Screw Pummps
P 6 ------------------------- Surge Contrrol System
Part
P 7 ------------------------- Lifting Equip
Part pment
P 8 ------------------------- Electric and Pneumatic A
Part Actuators
P 9 ------------------------- Odour Control Equipmen
Part nt-Carbon Ty ype
P 10 ----------------------- Odour Control Equipmen
Part nt-Scrubber Type
P 11 ----------------------- Screening Equipment
Part E
P 12 ----------------------- Grit Remova
Part al Equipmen t
P 13 ----------------------- Aeration Equipment
Part
P 14 ----------------------- Air Blowers and Compre
Part essors
P 15 ----------------------- Settlement Tank
Part T Equipmment
P 16 ----------------------- Tertiary Treatment Gran
Part nular Filters
P 17 ----------------------- Sludge Thic
Part ckening and D Dewatering Equipment
E
P 18 ----------------------- Mixers and Stirrers
Part
P 19 ----------------------- Chlorination
Part n Plant Equippment
P 20 ----------------------- Washwater Systems
Part
P 21 ----------------------- Miscellaneo
Part ous Equipme nt
P 22 ----------------------- Ventilation Systems
Part S

SECTION
S 100 --------------- INSTRUMENTATION, C CONTROL AND A AUTOMMATION
P 1 ------------------------- General
Part
P 2 ------------------------- Telemetry/S
Part Scada
P 3 ------------------------- Primary Elements
Part
P 4 ------------------------- Panel Moun
Part nted and Misccellaneous In
nstruments
P 5 ------------------------- Control Panels and Con
Part ntrol Room Hardware

QCS
S 2010
QCS
Q 2010 Ackn
nowledgem
ments Page 4
SECTION
S 11 --------------- HEALTH & SAFETY
P 1 ------------------------- Regulatory Document
Part D
P 2 ------------------------- Safety and Accident
Part A Pre
evention Man
nagement / Administration
A System (S
SAMAS)

SECTION
S 122 --------------- EARTHWORKS RELAT TED TO BUILDINGS
P 1 ------------------------- General
Part
P 2 ------------------------- Excavations
Part s
P 3 ------------------------- Filling
Part
P 4 ------------------------- Utility Trenc
Part ches
P 5 ------------------------- Installation of
Part o Protective
e Membranes
s

SECTION
S 133 --------------- MASONRY
P 1 ------------------------- General
Part
P 2 ------------------------- Mortar and Grout
Part G
P 3 ------------------------- Accessories
Part s
P 4 ------------------------- Unit Masonrry
Part
P 5 ------------------------- Masonry Laying
Part

SECTION
S 144 --------------- ROOFING
P 1 ------------------------- General
Part
P 2 ------------------------- Membrane Roofing
Part R
P 3 ------------------------- Metal and Plastic
Part P Roofinng
P 4 ------------------------- Roof and De
Part eck Insulatio
on
P 5 ------------------------- Roofing Tile
Part es

SECTION
S 155 --------------- THERMAL INSULATIO N OF BUILD
DINGS
P 1 ------------------------- General
Part
P 2 ------------------------- Building Insulation
Part
P 3 ------------------------- Cold Stores
Part

SECTION
S 166 --------------- STRUCTUR RAL STEELW WORKS
P 1 ------------------------- General
Part
P 2 ------------------------- Materials
Part
P 3 ------------------------- Drawings
Part
P 4 ------------------------- Fabrication
Part
P 5 ------------------------- Welding
Part
P 6 ------------------------- Bolting
Part
P 7 ------------------------- Accuracy off Fabrication
Part
P 8 ------------------------- Erection
Part
P 9 ------------------------- Accuracy off Erected Ste
Part eelwork
P 10 ----------------------- Protective Treatment
Part T

SECTION
S 177 --------------- METALWORK
P 1 ------------------------- General
Part
P 2 ------------------------- Materials Classification
Part
P 3 ------------------------- Metal Doors
Part s and Window ws
P 4 ------------------------- Architectura
Part al Metal Workk
P 5 ------------------------- Light Metal Support and Cladding Su
Part upport
P 6 ------------------------- Workmansh
Part hip

QCS
S 2010
QCS
Q 2010 Ackn
nowledgem
ments Page 5
SECTION
S 188 --------------- CARPENTR RY, JOINERY Y AND IRON NMONGERY Y
P 1 ------------------------- General
Part
P 2 ------------------------- Wood Treattment
Part
P 3 ------------------------- Structural Timber (Roug
Part gh Carpentry)
P 4 ------------------------- Architectura
Part al Timber (Fin entry, Millwork)
nished Carpe
P 5 ------------------------- Joinery
Part
P 6 ------------------------- Fasteners and
Part a Adhesive es
P 7 ------------------------- Ironmongery
Part y (Hardware )

SECTION
S 199 --------------- PLUMBING G WORK
P 1 ------------------------- General
Part
P 2 ------------------------- Water Distribution
Part
P 3 ------------------------- Plumbing Piipework in Trrenches
Part
P 4 ------------------------- Cold Water Storage
Part
P 5 ------------------------- Hot Water Storage
Part S
P 6 ------------------------- Commission
Part ning of Syste
ems
P 7 ------------------------- Plumbing fo
Part or Gases

SECTION
S 200 --------------- DRAINAGE E WORKS FO OR BUILDIN
NGS
P 1 ------------------------- General
Part
P 2 ------------------------- Internal Drainage Workss
Part
P 3 ------------------------- External Dra
Part ainage Workks
P 4 ------------------------- Drainage Pipes in Trencches
Part
P 5 ------------------------- Structures Related
Part R To D
Drainage Worrk
P 6 ------------------------- Surface Water Drainage
Part e
P 7 ------------------------- Commission
Part ning Of Systeems

SECTION
S 21 --------------- ELECTRICA AL WORKS
P 1 ------------------------- General Pro
Part ovisions for E
Electrical Insttallation
P 2 ------------------------- MV Factory Built Assem
Part mblies (FBAs s)
P 3 ------------------------- Protective Devices
Part D
P 4 ------------------------- Motor Starte
Part ers
P 5 ------------------------- Variable Speed Controll ers
Part
P 6 ------------------------- Cables and Small Wiring
Part g
P 7 ------------------------- Conduits an
Part nd Conduit Bo oxes
P 8 ------------------------- Trunking
Part
P 9 ------------------------- Cable Trays
Part s
P 10 ----------------------- Wiring Acce
Part essories and General Pow wer
P 11 ----------------------- Light Fittings
Part
P 12 ----------------------- Emergency Lighting
Part
P 13 ----------------------- Telephone Installations
Part
P 14 ----------------------- Structured Cabling
Part C Systeems
P 15 ----------------------- Electric Mottors
Part
P 16 ----------------------- Power Facto
Part ory Correctio
on Capacitors
P 17 ----------------------- Standby Die
Part esel Generattor Set
P 18 ----------------------- Uninterruptible Power S upply System
Part ms
P 19 ----------------------- Sound and Call
Part C Systemss
P 20 ----------------------- Elevators/Es
Part scalators
P 21 ----------------------- Lightning Prrotection
Part
P 22 ----------------------- Earthing and
Part d Bonding

QCS
S 2010
QCS
Q 2010 Ackn
nowledgem
ments Page 6
Part
P 23 ----------------------- Inspection and
a Testing
P 24 ----------------------- Documentattion Format
Part
P 25 ----------------------- Electrical Identification
Part
P 26 ----------------------- Electromagn
Part netic Compa atibility
P 27 ----------------------- Battery and Battery Cha
Part arger
P 28 ----------------------- Small Enclo
Part osures
P 29 ----------------------- Underfloor Ducts
Part D
P 30 ---------------------- Duct Bank and
Part a Manhole es
P 31 ----------------------- Power Distribution Transsformers
Part
P 32 ----------------------- 11 kv Switch
Part hgear
P 33 ----------------------- Actuators
Part

SECTION
S 222 --------------- AIR CONDITIONING, R REFRIGERAT TION AND VENTILATIO
V ON
P 1 ------------------------- General
Part
P 2 ------------------------- Central Refrrigeration an d Air Conditiioning Equipment
Part
P 3 ------------------------- Unitary Equipment
Part
P 4 ------------------------- Air Handling
Part g Equipment
P 5 ------------------------- Chilled Wate
Part er Pipework
P 6 ------------------------- Ductwork an
Part nd Air-Side EEquipment
P 7 ------------------------- Thermal Ins
Part sulation
P 8 ------------------------- Exhaust Fan
Part ns
P 9 ------------------------- Accessories
Part s

SECTION
S 233 --------------- FIRE FIGHT TING AND F
FIRE FIGHTING SYSTEMMS
P 1 ------------------------- General
Part
P 2 ------------------------- Fire Alarm and
Part n Systems
a Detection
P 3 ------------------------- Analogue Addressable F
Part Fire Alarm Sy
ystems
P 4 ------------------------- Fire Fighting
Part g System
P 5 ------------------------- Testing and Commission
Part ning

SECTION
S 244 --------------- FINISHES TOT BUILDIN GS
P 1 ------------------------- General
Part
P 2 ------------------------- Lath and Pla
Part aster
P 3 ------------------------- Dry Lining (W
Part Wall Board)
P 4 ------------------------- Special Wall Surfaces
Part
P 5 ------------------------- Tiles
Part
P 6 ------------------------- Terrazzo
Part
P 7 ------------------------- Stone Flooring
Part
P 8 ------------------------- Unit Masonrry Flooring
Part
P 9 ------------------------- Floor Screeds and Treattments
Part
P 10 ----------------------- Joints, Caulking and Sea
Part alants
P 11 ----------------------- Recessed Duct
Part D Covers
P 12 ----------------------- Carpeting
Part
P 13 ----------------------- Other Floor Coverings
Part
P 14 ---------------------- Ceilings
Part

SECTION
S 255 --------------- GLASS AND GLAZING
G
P 1 ------------------------- General
Part
P 2 ------------------------- Glass
Part
P 3 ------------------------- Workmansh
Part hip

QCS
S 2010
QCS
Q 2010 Ackn
nowledgem
ments Page 7
Part
P 4 ------------------------- Glazed Curttain Wall and
d Other Items
s
SECTION
S 266 --------------- PAINTING AND
A DECOR RATING
P 1 ------------------------- General
Part
P 2 ------------------------- Surface Pre
Part eparation for Painting
P 3 ------------------------- Primers, Paints and Coa
Part atings
P 4 ------------------------- Wall Coverin
Part ngs of Decorrative Papers
s/Fabrics

SECTION
S 277 --------------- EXTERNAL L WORKS
P 1 ------------------------- General
Part
P 2 ------------------------- Block Paved
Part d Areas
P 3 ------------------------- Fences and Gates
Part
P 4 ------------------------- Fountains and Aquatic F
Part Features
P 5 ------------------------- Site Furniturre
Part
P 6 ------------------------- Flag Poles
Part
P 7 ------------------------- Protective or
Part o Shade Covver Systems
P 8 ------------------------- Play Field and Park Equ
Part uipment
P 9 ------------------------- Miscellaneo
Part ous Other Ext
xternal Works
s

SECTION
S 288 --------------- LANDSCAP PING
P 1 ------------------------- Landscape Planting
Part
P 2 ------------------------- Landscape Irrigation Sysstem
Part
P 3 ------------------------- Play Equipm
Part ment Genera al Specificatio
on