QA/QC Inspection Checklist: Design Coordinates, Inc. CP No. - Vector Three
QA/QC Inspection Checklist: Design Coordinates, Inc. CP No. - Vector Three
A SUBMITTALS:
A.1 Materials:
1. Type :
2. Brand:
3. Origin:
4. Type of Joint:
5. Mill Certificate:
A.2 Shopdrawings
B INSTALLATIONS:
Reinforced concrete water
B.1 tank complete with
the following:
b.1.1 convex drain panel in
each compartment
b.1.2 manhole in each
compartment
b.1.3 internal tie rod
b.1.4 /internal and external
ladders for each
compartment (stainless)
b.1.5 inlet and outlet as
required
b.1.6 water level indicator
with level mark
b.1.7 .overflow
b.1.8 scour pipe
b.1.9 vent pipe
b.1.10 waterproofing inside
b.1.11 capacity as required
b.1.12 size as required
b.1.13 cleaning (flushing)
b.1.14 chlorination
Remarks /
Non - Not Due
ITEM / REQUIREMENT Conform.
Conform. Avail.
N/A Corrective
Date
Open Close
Actions
C TESTING:
C.1 Water holding test for 24 hrs.
C.2 Leakage
C.3 Drop in water level inside tank
Distribution:
Note: A separate Notice to Comply (DCI-NTC) can be issued to the supplier/contractor if the non-conforming item may
take time to rectify and complete.