February 6, 2017: Phase Firm Cost Funding Schedule Start Finish
February 6, 2017: Phase Firm Cost Funding Schedule Start Finish
BayshoreBlvdBufferedBicycleLanesandTrafficCalming
(HawthorneRoadtoPlattStreet,Northbound)
(SouthofHowardAvenuetoPlattStreet,Southbound)
CompleteStreets(CIP#0000075)
ProjectDescription:
Thisprojectwillconsistofsigningandpavementmarkingenhancementstoimprovesafetyin
thecorridorforallmodesoftravel.Thecombinedimprovementswillprovidetrafficcalming
allowingfortheloweringofthespeedlimitwithinthecorridor.
Theproposedimprovementsaresummarizedasfollows:
Removal of faded striping between Rome Avenue and Platt Street, and install new
stripingwithblackcontrastintheskiplines,bikemessage/messagestriping;
Providing buffered bike lanes from Rome Ave to south of Howard Ave with green
coloredbikelaneatDeSoto
Reducewidthoftravellanesfromcurrentwidthsto10foot
Addinga2ftbuffertotheexistingbicyclelanes;
InstallingRapidReflectiveFlashingBeacon(RRFB)crosswalksatthreelocations:(1)S.
Dakota Ave., (2) S. Delaware Ave., and (3) Midway between S. Brevard Ave. and W.
SwannAve.;and,
Reducingthepostedspeedlimitfrom40MPHto35MPH;
Note:ImprovementstothesouthboundsegmentfromHawthorneRoadtoHowardAvenuewill
becompletedundertheseparateBayshoreBoulevardEnhancementsPhaseIII(CIP#1000577).
ExampleTypicalSection:
ProjectBudgetandSchedule:
Phase Firm Cost Funding Schedule
Start Finish
Design City(InHouse) n/a Dec2015 May2017
PedCrossingStudy DKS&Assoc. $6,940 LOGT/ Jun2016 Oct2016
Construction tbd tbd FDOT tbd tbd
February6,2017
LocationMap(Signing&PavementMarkings):
PedestrianCrossingStudyArea: