Professional Documents
Culture Documents
PPO - Production Systems Analysis - Slides 1-12
PPO - Production Systems Analysis - Slides 1-12
PPO - Production Systems Analysis - Slides 1-12
PETROLEUM PRODUCTION
OPTIMIZATION
PCB 4313
PRODUCTION SYSTEMS ANALYSIS
2
PETROLEUM PRODUCTION
OPTIMIZATION
By
Any production well is drilled and completed to move the oil and gas
from its original location in the reservoir to the stock tank.
1 2
2
NODAL Analysis: