Temporary Strand Cutting Sequence: Single Span Prestressed Girder Construction Sequence
Temporary Strand Cutting Sequence: Single Span Prestressed Girder Construction Sequence
ELASTOMERIC BEARING
STRAND CUTTING SEQUENCE" THIS SHEET)
PAD TYPICAL AT END PIERS
END PIER
END PIER
TEMPORARY STRAND
FOR GIRDERS ERECTED ON A LONGITUDINAL GRADE, CUTTING SEQUENCE
STRAND DETENSIONING BLOCKOUTS SHALL BE
STAGE 1 PLACED AT THE LOW END OF THE GIRDER. 1. ERECT AND BRACE GIRDERS.
PLACE BRIDGE DECK REINFORCEMENT 4. WITHIN 24 HOURS OF CUTTING THE TEMPORARY STRANDS,
INSTALL TEMPORARY BRACING FOR DIAPHRAGM AND DECK FILL THE RECESSES WITH A GROUT CONFORMING TO STD.
PLACEMENT IN ACCORDANCE WITH STD. SPEC. SECTION 6-02.3(17)F5. SPEC. 9-20.3(2). REMOVE ALL MOISTURE IN RECESSES
PRIOR TO FILLING THEM WITH GROUT.
CAST BRIDGE DECK (OR PLACE PRECAST DECK
PANELS) WHEN DIAPHRAGM CONCRETE COMPRESSIVE
STRENGTH HAS REACHED 3000 PSI (MIN.)
04/07/2016
STAGE 3
CAST BRIDGE DECK
STAGE 4
CAST TRAFFIC BARRIERS
M:\STANDARDS\Girders\CONSTRUCTION SEQUENCE\CONSEQ-SINGLESPAN.MAN
5.6-A2-1