Date

S/N Location

1 ZONE 1

2 ZONE 1

3 ZONE 1
4 ZONE 5

5 ZONE 1

6 ZONE 5
Prepared by RTO Representative:
Remark: Photo attached (1 page )

Photos taken on

RD259 PROPOSED BUS DEPOT AT LO

ON-GOING NDT - NUCLEAR DENSITY


WORKS AT ZONE 1 PHASE 1

RD259 PROPOSED BUS DEPOT AT LO


ON-GOING MANIFOLD BASE REINFOR
UNDERGROUND FUEL TANK AREA AT

RD259 PROPOSED BUS DEPOT AT LO

ON-GOING LANE MARKING FOR BUS


RD276 Appointm

23/6/2014 MONDAY

Chainage
RTO Representative: ALFREDO JR
to attached (1 page )

23/6/2014 MONDAY

OSED BUS DEPOT AT LOYANG

DT - NUCLEAR DENSITY TEST FOR RCA FOR RIGID PAVE


ONE 1 PHASE 1

OSED BUS DEPOT AT LOYANG


ANIFOLD BASE REINFORCEMENT BARS INSTALLATION
UND FUEL TANK AREA AT ZONE 1 PHASE 1

OSED BUS DEPOT AT LOYANG

ANE MARKING FOR BUS PARKING SLOTS AT ZONE 1 PH


C & V ENGINEER
Project Consultant Engineers GS
Maxwell House, # 09-04/05. 20, Max
Tel: 62260828 Fax:
Email : cveng0904@gmail.com

RD276 Appointment of Qualified Person ( Super


DAILY SITE R

Nature of works

ON-GOING NDT - NUCLEAR DENSITY TEST FOR


RCA FOR RIGID PAVEMENT WORKS AT ZONE 1
PHASE 1

ON-GOING CASTING OF RIGID PAVEMENT AT


ZONE 1 PHASE 1

ON-GOING MANIFOLD BASE REINFORCEMENT


BARS INSTALLATION NEAR UNDERGROUND
FUEL TANK AREA AT ZONE 1 PHASE 1
ON-GOING RETAINING WALL REINFORCEMENT
BARS INSTALLATION AT ZONE 5 PHASE 1

ON-GOING LANE MARKING FOR BUS PARKING


SLOTS AT ZONE 1 PHASE 1

ON-GOING CBP WORKS AT ZONE 5 PHASE 2


ALFREDO JR. ARIOS CLARO
(Name & signature)
CA FOR RIGID PAVEMENT
ARS INSTALLATION NEAR
HASE 1

LOTS AT ZONE 1 PHASE 1


NEERING PTE LTD
ngineers GST. Reg. No. 198202518K
/05. 20, Maxwell Road, Singapore 069113
2260828 Fax: 62225645
gmail.com Website : www.cvconslt.com

on ( Supervision) For Proposed Bus Depot at Loy


AILY SITE REPORT

Time (Hrs) Weather


8-12AM

01100-1500
Condition 1-6PM
RE

0800-2315 RTO

Total

0800-2100

VISITOR AT SITE:
0800-2200

0800-1800
SITE MEETING (IF ANY)

0800-2030

HTC MANPOWER

Project Manager 1

Project Coordinator 1

Site Manager 1

Project Engineer 2

Planning Engineer 1

Architect
Consultant

QECP

Site Supervisor 4

Rigger Signalman 1

Checked by RE R
RD259 PROPO

ON-GOING CA

RD259 PROPO
ON-GOING RE
ZONE 5 PHASE

RD259 PROPO

ON-GOING CB
SS ISO 9001:2008
FS 500171

at Loyang

Fine Drizzle Rain

Fine FINE Rain


WSHO 2

ECO 1

Safety Supervisor 1

Quantity Surveyor 1

SPRO 1

Surveyor 1
Tipper Truck Operator 1

Excavator Operator 12

Volvo Truck Operator 3

General Worker 44

TOTAL 78

d by RE Representative: Muthu Senthi


(Name & sign
9 PROPOSED BUS DEPOT AT LOYANG

OING CASTING OF RIGID PAVEMENT AT ZONE 1 PHASE 1

9 PROPOSED BUS DEPOT AT LOYANG


OING RETAINING WALL REINFORCEMENT BARS INSTALL
5 PHASE 1

9 PROPOSED BUS DEPOT AT LOYANG

OING CBP WORKS AT ZONE 5 PHASE 2


S ISO 9001:2008 Certificate No:
FS 500171

3
MACHINERY

EXCAVATOR 10

GENERATOR 3

ROLLER (1&10
2
TONS)
SOIL DRILL
1
MACHINE

VOLVO TRUCK 2

TIPPER TRUCK 1
MOBILE CRANE 1

TOTAL 20

Muthu Senthil Kumar


(Name & signature)
T ZONE 1 PHASE 1
NT BARS INSTALLATION AT