Risk Ass - RD10008E RELOCATION OF 11 KV CABLE FROM EXISTING ROUTE TO NEW LOCATION

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

EHS RISK ASSESSMENT

ACTIVITY: RELOCATION OF 11 KV CABLE FROM EXISTING ROUTE TO NEW LOCATION


PACKAGE NUMBER: RD10008E

Current Risk Final Risk


Task (Steps) Potential Hazard Existing Control Additional Control Prob
Cons. Prob. Risk Cons. Risk
.

Verify isolations (Obtain isolation


permit)
After getting isolation permit from
EMAL/SLII only start work.
Engineer/supervisor ensure that the
work permit is valid for date and
Main time
contractor/client All workers are inducted by
coordination EMAL/SLII
6.1 fails,job All personnel involve in the activities
stopped,work must wear the required PPEs at all 3 4 12
unapproved, times (hard hat,safety glass,safety
Contact with shoe,Hard hand gloves ,coverall)
energized Extra care shall be taken whenever
equipment,poor energized equipment is nearby
house keeping working place.
Conduct tool box meeting to revew
all method statement,risk
assessment and safety measures
with working team
Ensure properhouse keeping from
time to time
Isolation by EMAL/SLII
Representative(RMU 21 TO RMU
6.2 24)
Use appropriate PPE,s
Manual handling Close supervision will be
Injury to workers implemented. 3 3 9
(back,hands,foot) Supervisor to give tool box talk
regarding proper manual handling.
503406-AD0000-68AF-12303_R01 (2012-01-30) Page 1 of 3
EHS RISK ASSESSMENT

ACTIVITY: RELOCATION OF 11 KV CABLE FROM EXISTING ROUTE TO NEW LOCATION


PACKAGE NUMBER: RD10008E

All hand tools must be in good


Using damaged condition, no homemade hand
hand tools tools to be used at site, supervisor 3 2 6
to check.

All workers involve in the activity


must be aware of heat stress,
Heat stress 4 3 12
supervisor to ensure drinking cold
water is available.
Maintain housekeeping within the
Poor house working area
3 3 9
keeping Walkway and gangway to be kept
free of obstruction.

All personnel involve in the


Not using PPES activities must wear the required 3 2 6
PPEs at all times (hard hat,safety
glass,safety shoe, Hard hand
gloves ,coverall)

NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 25 (Method Statement plus additional Control Measures in place)

Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 2 of 3


EHS RISK ASSESSMENT

ACTIVITY: RELOCATION OF 11 KV CABLE FROM EXISTING ROUTE TO NEW LOCATION


PACKAGE NUMBER: RD10008E

Risk assessment compiled by :

Risk Assessor:

SACHIN BABU EHS ADVISOR 21-03-2012

Name Designation Signature Date

Risk assessment approved by :

EHS Department:

Name Designation Signature Date

Construction:

Name Designation Signature Date

Management:

Name Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 3 of 3