Fuel Gas Compressor Enclosures: Contractor Work Method Statement (Ehs)

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 8

HS.SAF.09.

F12

CONTRACTOR WORK METHOD STATEMENT (EHS)

1. Contractor Name : DANWAY 3. Trades / Disciplines Involved In Work :

2. Work Location : Fuel gas compressor Supervisor, Electricians and Helpers.


enclosures-FGC 1,2 AND 4
Proposed Starting Date :

4. Brief Description Of Work To Be Undertaken : 5. Tools / Substance


Installation of lighting system complete with
Portable Tools
cabling and conduits in following Fuel gas
compressor enclosures:FGC 1, FGC 2 ,FGC 4 Hand Electrical Pneumatic
Hazardous Substances
Toxic Flammable Corrosive
Harmful Irritant
Environment Impact
Health & Hygiene Effect

Environmental Impact Health & Hygiene

Yes No Yes No

Hazardous waste x Significant Dust Generation x

Emissions x Noise (above 85 DbA) x

Discharge to sea or drains x Hazardous substances (if yes attach list) x

If answer to any of the above is yes, please circulate to If answer to any of the above is yes, please circulate to
Manager, Environmental Affairs Senior Occupational Hygienist

6. Person Completing The Work Method Statement :

Name : SAJI JOHN Position : SUPERVISOR Company : DANWAY

Signature : Date : 24-04-2012

File: Revision: 0(26-May-2011) Page 1 of 8


HS.SAF.09.F12

7. Approvals

Contractors Site Rep. Name SULFEEK H Signature : Date :


24/4/12

EMAL Representative Name Signature : Date :

Area Owner Name Signature : Date :

Name Signature: Date:


EMAL EHS Department

The completed Work Method Statement must be submitted at least seven full working days prior to the
commencement of activities.
Where the Work Method Statement indicates the use of Hazardous Substances, a Material Hazard Data
Sheet must be attached.
After the Area Owners approval the Work Method Statement shall be forwarded to EHS department for
approval
The approved Work Method Statement must be attached to the permit(s) to work and all persons involved
in the job instructed in its requirements.

2. RISK ESTIMATOR CHART


The Risk Estimator chart should be used as an assistant for filling out the work
method statement.

Severity
Probability Low x1 Medium x 2 High x3

Low x1 Low Probability x Low Severity LP x MS LP x HS


1x1=1 1x2 = 2 1x3 =3
Medium x2 MP x LS MP X MS MP x HS
2x1 =2 2x2 =4
2x3 =6
High x3 HP x LS HP X HS HP x HS
3 x 1 =3 3x2 = 6 3x3=9

Significant Risk = High Risk (6-9) or Medium Risk (3-4) in terms of probability and severity
Tolerable Risk = Risk reduced to an acceptable level = Low Risk (1-2)
Residual Risk = Risk remaining after implementing recommended control actions (usually very minor).

File: Revision: 0(26-May-2011) Page 2 of 8


HS.SAF.09.F12

8. Safety Analysis

Severity x Probability =
Risk
Individual Activities To Identified Hazard(s) Persons Exposed To Precautions and Plan of actions To Be Taken
Complete Work. List In Residual Risk
Associated With Activity Hazard To Remove / Control Hazards
Sequence of Activity (Use Risk Estimator
Chart)

6.1 PREPARATION. Slips, trips and fall at Maintain housekeeping around in the
the same level. working area.
Hot environment All personnel involve in the activity must
Manual handling Emal rep., Engr., be aware of heat stress, supervisor to
hazards Supv. Elec, and ensure drinking cold water is available. 2x2=4
helpers Supervisor to give tool box talk
regarding proper manual handling.
Since it is explosion proof area Extra
care shall be taken while in carry out
the work.

File: Revision: 0(26-May-2011) Page 3 of 8


HS.SAF.09.F12

APPROVAL(Permit to Client coordination Emal rep., Engr., Verify isolations.


work from EMAL) fails, job stopped, Supv. Elec, helpers Start work after getting permit from
work unapproved. Emal.
Operatives should Engineer / supervisor must ensure that
be aware of the work permit is valid for the date and
emergency tine
procedure of EMAL All work force are inducted by EMAL
All personnel involve in the activities
must wear the required PPEs at all
times (hard hat, Clear safety glass,
safety shoes, hand gloves, dust mask,
fire retardant long sleeve shirt / pants)) 2x2=4
Advance planning by contractor
considering the time consumption to
recive the permit from EMAL.
Emergency procedure must be
displayed at prominent location and
cascade to operatives on regular
interval and recorded.
Ensure the operatives must be go
through EMAL and DANWAY safety
induction.
Electricians &
2 x 1 =2
6.2 INSTALLATION OF Using damaged Helpers All hand tools to be used must be
CONDUITS AND hand tools. in good condition.
LIGHT FITTINGS. Sharp edges of Inspect before use, periodically
conduits maintained.

File: Revision: 0(26-May-2011) Page 4 of 8


HS.SAF.09.F12

Extra care to be taken while


installing cable support / tray & ladder,
use hand gloves.

Electricians & Competent workers to be deployed,


Incompetent workers. 2 x 1 =2
Helpers supervisor to check the competency of
the workers.
Electricians ,
Slips, trips and fall at supervisor & Maintain housekeeping around the 2 x 1 =2
the same level. Helpers working area.

Using damaged Battery operated drill machine must be


battery operated drill in good condition with color coding
machine inspection tag.
Drilling without clear Electricians & Use clear safety glass dust masks & ear
3x1=3
safety glass, dust Helpers plug while drilling.
mask & ear plug Drilling to be done in phase manner if
Dust while drilling the fire alarm system is close to the
may cause of fire drilling point.
alarm activation.

Unauthorized using Electricians & Only competent and authorized worker


3x1=3
of battery operated Helpers for the using of battery operated drill
drill machine machine.
Electricians & 3x1=3
Using damaged step Helpers Inspect ladder before use; assign
ladder. one man to hold the ladder on the
Fall from height ground while in used.
File: Revision: 0(26-May-2011) Page 5 of 8
HS.SAF.09.F12

Always climb up and down facing


the ladder.
Don't carry tools or materials in
scaffold or from your hand while climbing up and down
ladder ladder.
Ensure workers on top of
Scaffolders must wear their safety
harness and 100% tie off.

Do not keep unwanted materials


on top of the scaffold or ladder.
Materials to be removed should
Fall of materials may All workers near by 2x2=4
be in safe manner one by one--,
injure workers below
ensure no materials to be dropped.
Barricade the working area by
using warning tape and sign boards.

Maintain housekeeping within the


Emal rep., Engr.,
working area 2 x 1 =2
Poor housekeeping Supv. Elec, Helpers.
Walkway and gangway to be kept
free of obstruction.

Emal rep., Engr.,


Wear P.P.E.'s at all times (hard hat,
Clear safety glass, safety shoes, hand 2x2=4
Not using P.P.E.'s Supv. Elec, Helpers.
gloves, dust mask, fire retardant long
sleeve shirt / pants).

File: Revision: 0(26-May-2011) Page 6 of 8


HS.SAF.09.F12

BY EMAL
INSTALLATION OF
SCAFFOLDING

This sheet must be properly completed detailing all of the steps required to complete the job along with the sequence of events and each of the hazards
arising. Failure to properly complete the form will result in non-approval.
(Additional sheets to be used as required)
9. Chemical Analysis (This form to be used as required)

Product Name

MSDS supplied Yes / No

Dangerous Goods Class

Hazardous Material Yes / No

Nature of Hazard Irritation / Carcinogen / Corrosive / Toxic / Other

Form Solid /Liquid / Gas / Dust / Vapour / Mist

Exposure Route Inhalation / Skin / Eye / Ingestion

Number of People Exposed

Duration of Exposure

Frequency of Exposure

File: Revision: 0(26-May-2011) Page 7 of 8


HS.SAF.09.F12

Controls to be implemented

Estimate of Exposure Negligible / Marginal / High


This sheet must be properly completed detailing all the necessary information. Failure to properly complete the form will result in non-approval.

File: Revision: 0(26-May-2011) Page 8 of 8