RISK ASSESSMENT - TK-4742-Operation Training For Overhead Crane
RISK ASSESSMENT - TK-4742-Operation Training For Overhead Crane
All workers involved in the
activity must be aware of heat
Heat stress. stress, supervisor to ensure 4 3 12
drinking cold water is available
at the working area.
Shaded area to be provided
Barricade the working area by
using safety cones warning
tape / signboard.
No materials or hand tools to be
Fall of stocked on the top of over
materials & head crane. 3 3 9
tools Appropriate signboard to be
displayed which read KEEP
AWAY OPERATION TRAINING
FOR OVERHEAD CRANE IN
PROGRESS".
Communication Supervisor to ensure proper
between trainer communication during the 3 2 6
and trainees. training.
NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 25 (Method Statement plus additional Control Measures in place)
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5
Risk Assessor:
EHS Department:
Construction:
Management: