CONCRETE CUBE TEST RESULTS

Project Title: RD259 LOYANG BUS DEPOT Name of Testing Lab.: CAST LABORATORIES

Proj. Ref. No.: RD259 Name of Supplier: TOP-MIX

Cube Strength
Date of Concrete Concrete Date of Test 7-day 28-day Action Taken for
S/N Location Cube Ref. No. Result of Test
Casting Slump Grade 7-day 28-day A B C D E F Failure
2 3/25/2014 TRIAL MIX 80 30N TP/T642-N30-B1-(1-6) 3/10/2014 3/31/2014 31 32.5 32.5 38 41.5 40.5 NOT ACCEPTED HTC/TOP-MIX
70 30N TP/T642-N30-B2-(1-6) 3/10/2014 3/31/2014 30 33 34.5 40 41.5 42.5 NOT ACCEPTED HTC/TOP-MIX
85 30N TP/T642-N30-B3-(1-6) 3/10/2014 3/31/2014 30.5 30.5 29.5 35.5 38 34.5 NOT ACCEPTED HTC/TOP-MIX
90 35N TP/T642-N35-B1-(1-6) 3/10/2014 3/31/2014 37.5 35 35 44.5 44.5 42.5 ACCEPTED
90 35N TP/T642-N35-B2-(1-6) 3/10/2014 3/31/2014 36 37 32.5 44 40 42 ACCEPTED
90 35N TP/T642-N35-B3-(1-6) 3/10/2014 3/31/2014 39.5 39 40.5 46 47.5 46.5 ACCEPTED
75 40N TP/T642-N40-B1-(1-6) 3/10/2014 3/31/2014 35.5 40 41 50.5 48.5 50 ACCEPTED
90 40N TP/T642-N40-B2-(1-6) 3/10/2014 3/31/2014 36.5 39 41 47 50.5 50 ACCEPTED
90 40N TP/T642-N40-B3-(1-6) 3/10/2014 3/31/2014 42.5 43 44.5 51 51 51.5 ACCEPTED
3 3/27/2014 120 40P TP/T642-P40-B1(1-6) 3/10/2014 3/31/2014 39.5 40 40 39.5 46.5 46.5 NOT ACCEPTED HTC/TOP-MIX
90 40P TP/T642-P40-B2(1-6) 3/10/2014 3/31/2014 38.5 37.5 37 47 46 45 NOT ACCEPTED HTC/TOP-MIX
95 40P TP/T642-P40-B3(1-6) 3/10/2014 3/31/2014 36 35.5 34 45.5 44 44 NOT ACCEPTED HTC/TOP-MIX
110 45P TP/T642-P45-B1(1-6) 3/10/2014 3/31/2014 51.5 56.5 55 60 56.5 65.5 ACCEPTED
100 45P TP/T642-P45-B2(1-6) 3/10/2014 3/31/2014 52.5 53 49 56 63.5 61.5 ACCEPTED
100 45P TP/T642-P45-B3(1-6) 3/10/2014 3/31/2014 53 55 53.5 63 60.5 62.5 ACCEPTED

Prepared by: Confirmed by: Checked by:

Name & Signature of Builder's Site Rep. Name & Signature of Site Supervisor Name & Signature of QP

Date: Date: Date:

Note: This form serves as a guideline only


CONCRETE CUBE TEST RESULTS

Project Title: RD259 LOYANG BUS DEPOT Name of Testing Lab.: CAST LABORATORIES

Proj. Ref. No.: RD259 Name of Supplier: TOP-MIX

Cube Strength
Date of Concrete Concrete Date of Test 7-day 28-day Action Taken for
S/N Location Cube Ref. No. Result of Test
Casting Slump Grade 7-day 28-day A B C D E F Failure
1 3/3/2014 TRIAL MIX 95 30N TM141591(A-F) 3/10/2014 3/31/2014 31 32.5 32.5 38 41.5 40.5 NOT ACCEPTED HTC/TOP-MIX
100 30N TM141592(A-F) 3/10/2014 3/31/2014 30 33 34.5 40 41.5 42.5 NOT ACCEPTED HTC/TOP-MIX
80 30N TM141593(A-F) 3/10/2014 3/31/2014 30.5 30.5 29.5 35.5 38 34.5 NOT ACCEPTED HTC/TOP-MIX
95 35N TM141594(A-F) 3/10/2014 3/31/2014 37.5 35 35 44.5 44.5 42.5 ACCEPTED
85 35N TM141595(A-F) 3/10/2014 3/31/2014 36 37 32.5 44 40 42 ACCEPTED
85 35N TM141596(A-F) 3/10/2014 3/31/2014 39.5 39 40.5 46 47.5 46.5 ACCEPTED
75 40N TM141597(A-F) 3/10/2014 3/31/2014 35.5 40 41 50.5 48.5 50 ACCEPTED
85 40N TM141598(A-F) 3/10/2014 3/31/2014 36.5 39 41 47 50.5 50 ACCEPTED
85 40N TM141599(A-F) 3/10/2014 3/31/2014 42.5 43 44.5 51 51 51.5 ACCEPTED
115 40P TM141600(A-F) 3/10/2014 3/31/2014 39.5 40 40 39.5 46.5 46.5 NOT ACCEPTED HTC/TOP-MIX
120 40P TM144551(A-F) 3/10/2014 3/31/2014 38.5 37.5 37 47 46 45 NOT ACCEPTED HTC/TOP-MIX
125 40P TM144552(A-F) 3/10/2014 3/31/2014 36 35.5 34 45.5 44 44 NOT ACCEPTED HTC/TOP-MIX
135 45D TM144553(A-F) 3/10/2014 3/31/2014 51.5 56.5 55 60 56.5 65.5 ACCEPTED
140 45D TM144554(A-F) 3/10/2014 3/31/2014 52.5 53 49 56 63.5 61.5 ACCEPTED
130 45D TM144555(A-F) 3/10/2014 3/31/2014 53 55 53.5 63 60.5 62.5 ACCEPTED

Prepared by: Confirmed by: Checked by:

Name & Signature of Builder's Site Rep. Name & Signature of Site Supervisor Name & Signature of QP

Date: Date: Date:

Note: This form serves as a guideline only