Drawing Register & Transmittal

Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Sheet District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 1 of 13 Date of Issue

Title Size Scale Drawing No.


General

Drawing List - HVAC A1 NTS MMD-MA-H0-Z07-00-AL01 P01 Drawing Superseded

General Legends & Abbreviations - HVAC A1 NTS MMD-MA-H0-Z07-00-AL02 P01 Drawing Superseded

General Drawings : HVAC : Drawing List A0 NTS MMD-SA-H0-SA-00-AL01 Sheet Not Produced
General Drawings : HVAC : General Legends & Abbreviations
A0 NTS MMD-SA-H0-SA-00-AL05 P02 P03
(Sheet 01 of 02)
General Drawings : HVAC : General Legends & Abbreviations
A0 NTS MMD-SA-H0-SA-00-AL06 P02 P03
(Sheet 02 of 02)
General Drawings : HVAC : Standard Notes A0 NTS MMD-SA-H0-SA-00-AL10 P01 P02

General Drawings : HVAC : Standard Details (Sheet 01 of 02) A0 NTS MMD-SA-H0-SA-00-AL12 P01 P02

General Drawings : HVAC : Standard Details (Sheet 02 of 02) A0 NTS MMD-SA-H0-SA-00-AL13 P01 P02
General Drawings : HVAC : Control Schematic Diagrams
A0 NTS MMD-SA-H0-SA-50-AL15 P01 P02
(Sheet 01 of 04)
General Drawings : HVAC : Control Schematic Diagrams
A0 NTS MMD-SA-H0-SA-50-AL16 P01 P02
(Sheet 02 of 04)
General Drawings : HVAC : Control Schematic Diagrams
A0 NTS MMD-SA-H0-SA-50-AL17 P01 P02
(Sheet 03 of 04)
General Drawings : HVAC : Control Schematic Diagrams
A0 NTS MMD-SA-H0-SA-50-AL18 P01 P02
(Sheet 04 of 04)
Zone 01 - Utility Buildings and BMDC HQ
Zone 01 - BMDC HQ & Utility Buildings : HVAC Equipment
A0 NTS MMD-M1-H0-HQ-50-AL01 P01
Schedule
Zone 01 - BMDC HQ Building : HVAC Schematic Diagram
A0 NTS MMD-M1-H0-HQ-50-AL02 P01
Zone 01 - BMDC HQ Building : Ground Floor : Ventilation & Air
A0 1:100 MMD-M1-H0-HQ-20-0001 P01
Conditioning layout
Zone 01 - BMDC HQ Building : First Floor : Ventilation & Air
A0 1:100 MMD-M1-H0-HQ-20-0101 P01
Conditioning layout
Zone 01 - BMDC HQ Building : Second Floor : Ventilation &
A0 1:100 MMD-M1-H0-HQ-20-0201 P01
Air Conditioning layout
Zone 01 - BMDC HQ Building : Roof Level : Ventilation & Air
A0 1:100 MMD-M1-H0-HQ-20-0301 P01
Conditioning layout
Zone 01 - Utility Buildings : HVAC Schematic Diagram
A0 NTS MMD-M1-H0-UB-50-AL01 P01
Zone 01 - Utility Buildings : Ground Floor : Ventilation & Air
A0 1:100 MMD-M1-H0-UB-20-0001 P01
Conditioning layout
Zone 01 - Utility Buildings : Roof Level : Ventilation & Air
A0 1:100 MMD-M1-H0-UB-20-0101 P01
Conditioning layout
Zone 03 - FEC, F&B, Retail and Cinema
Zone 03 - Family Entertainment Center : HVAC Schematic
A1 NTS MMD-FC-H0-Z03-50-AL01 P01 Drawing Superseded
Diagram
Distribution Number of copies / Medium
Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 1 Page 1 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 2 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 03 - F&B : Typical HVAC Schematic Diagram A1 NTS MMD-R1-H0-Z03-50-AL01 P01 Drawing Superseded

Zone 03 - Waterfront F&B : Typical HVAC Schematic Diagram A1 NTS MMD-F1-H0-Z03-50-AL01 P01 Drawing Superseded

Zone 03 - Retail : Typical HVAC Schematic Diagram A1 NTS MMD-R2-H0-Z03-50-AL01 P01 Drawing Superseded

Zone 03 - Cinemas : HVAC Schematic Diagram A1 NTS MMD-CN-H0-Z03-50-AL01 P01 Drawing Superseded

Zone 03 - Family Entertainment Center : Roof Plan A1 1:250 MMD-FC-H0-Z03-20-0201 P01 Drawing Superseded

Zone 03 - Waterfront F&B : Typical Roof Plan A1 1:50 MMD-F1-H0-Z03-20-0101 P01 Drawing Superseded

Zone 03 - Retail : Typical Roof Plan A1 1:50 MMD-R2-H0-Z03-20-0101 P01 Drawing Superseded
Zone 03 - Family Entertainment Center : HVAC Equipment
A0 NTS MMD-M3-H0-FC-50-AL01 P01
Schedule
Zone 03 - Retail and F&B Blocks : HVAC Equipment Schedule A0 NTS MMD-M3-H0-RX-50-AL05 P01

Zone 03 - Cinema : HVAC Equipment Schedule A0 NTS MMD-M3-H0-CN-50-AL01 P01


Zone 03 - Family Entertainment Center : HVAC Schematic
A0 NTS MMD-M3-H0-FC-50-AL02 P02
Diagram
Zone 03 - Retail R1-R6 BOH : HVAC Schematic Diagram A0 NTS MMD-M3-H0-RX-50-AL01 P01

Zone 03 - F&B : HVAC Typical Schematic Diagram A0 NTS MMD-M3-H0-RX-50-AL02 P02

Zone 03 - Waterfront F&B : HVAC Typical Schematic Diagram A0 NTS MMD-M3-H0-FX-50-AL03 P02

Zone 03 - Retail : HVAC Typical Schematic Diagram A0 NTS MMD-M3-H0-RX-50-AL04 P02

Zone 03 - Cinema : HVAC Schematic Diagram A0 NTS MMD-M3-H0-CN-50-AL02 P02


Zone 03 - Family Entertainment Center : Ground Floor :
A0 1:100 MMD-M3-H0-FC-20-0001 P01
Ventilation & Air Conditioning Layout (Sheet 01 of 02)
Zone 03 - Family Entertainment Center : Ground Floor :
A0 1:100 MMD-M3-H0-FC-20-0002 P01
Ventilation & Air Conditioning Layout (Sheet 02 of 02)
Zone 03 - Family Entertainment Center : First Floor :
A0 1:100 MMD-M3-H0-FC-20-0101 P01
Ventilation & Air Conditioning Layout (Sheet 01 of 02)
Zone 03 - Family Entertainment Center : First Floor :
A0 1:100 MMD-M3-H0-FC-20-0102 P01
Ventilation & Air Conditioning Layout (Sheet 02 of 02)
Zone 03 - Family Entertainment Center : Roof Level :
A0 1:100 MMD-M3-H0-FC-20-0201 P01
Ventilation & Air Conditioning Layout (Sheet 01 of 02)
Zone 03 - Family Entertainment Center : Roof Level :
A0 1:100 MMD-M3-H0-FC-20-0202 P01
Ventilation & Air Conditioning Layout (Sheet 02 of 02)
Zone 03 - Retail 1&2 : Ground Floor : Ventilation & Air
A0 1:100 MMD-M3-H0-R1R2-20-0001 P01
Conditioning Layout
Zone 03 - Retail 1&2 : Roof Level : Ventilation & Air
A0 1:100 MMD-M3-H0-R1R2-20-0101 P01
Conditioning Layout
Zone 03 - Retail 3&4 : Ground Floor : Ventilation & Air
A0 1:100 MMD-M3-H0-R3R4-20-0002 P01
Conditioning Layout
Distribution Number of copies / Medium
Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 2 Page 2 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 3 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 03 - Retail 3&4 : Roof Level : Ventilation & Air
A0 1:100 MMD-M3-H0-R3R4-20-0102 P01
Conditioning Layout
Zone 03 - Retail 5&6 : Ground Floor : Ventilation & Air
A0 1:100 MMD-M3-H0-R5R6-20-0003 P01
Conditioning Layout
Zone 03 - Retail 5&6 : Roof Level : Ventilation & Air
A0 1:100 MMD-M3-H0-R5R6-20-0103 P01
Conditioning Layout
Zone 03 - Waterfront F&B F1F2F3 : Roof Level : Roof Plant
A0 1:100 MMD-M3-H0-F1F2F3-20-0101 P01
Space Marking Layout
Zone 03 - Waterfront F&B F4F5F6: Roof Level : Roof Plant
A0 1:100 MMD-M3-H0-F4F5F6-20-0101 P01
Space Marking Layout
Zone 03 - Cinemas : Ground Floor : Ventilation & Air
A0 1:100 MMD-M3-H0-CN-20-0001 P01
Conditioning Layout
Zone 03 - Cinemas : First Floor : Ventilation & Air Conditioning
A0 1:100 MMD-M3-H0-CN-20-0101 P01
Layout
Zone 03 - Cinemas : Mezzanine Level : Ventilation & Air
A0 1:100 MMD-M3-H0-CN-20-M101 P01
Conditioning Layout
Zone 03 - Cinemas : Projection Level : Ventilation & Air
A0 1:100 MMD-M3-H0-CN-20-M201 P01
Conditioning Layout
Zone 03 - Cinemas : Roof Level : Ventilation & Air
A0 1:100 MMD-M3-H0-CN-20-0201 P01
Conditioning Layout
Zone 04 - Yacht Club

Zone 04 - Yacht Club : HVAC Schematic Diagram A1 NTS MMD-YC-H0-Z04-50-AL01 P01 Drawing Superseded

Zone 04 - Yacht Club : HVAC Equipment Schedule A0 NTS MMD-M4-H0-YC-50-AL01 P01

Zone 04 - Yacht Club : HVAC Schematic Diagram A0 NTS MMD-M4-H0-YC-50-AL02 P02


Zone 04 - Yacht Club : Ground Floor : Ventilation & Air
A0 1:100 MMD-M4-H0-YC-20-0001 P01
Conditioning Layout
Zone 04 - Yacht Club : First Floor : Ventilation & Air
A0 1:100 MMD-M4-H0-YC-20-0101 P01
Conditioning Layout
Zone 04 - Yacht Club : Mezzanine Level : Ventilation & Air
A0 1:100 MMD-M4-H0-YC-20-M101 P01
Conditioning Layout
Zone 05 - Hotel & Serviced Apartments
Zone 05 - Hotel and Serviced Apartments : Ventilation
A1 NTS MMD-HT-H1-Z05-50-AL01 P01 Drawing Superseded
Schematic Diagram (Sheet 01 of 04)
Zone 05 - Hotel and Serviced Apartments : Ventilation
A1 NTS MMD-HT-H1-Z05-50-AL02 P01 Drawing Superseded
Schematic Diagram (Sheet 02 of 04)
Zone 05 - Hotel and Serviced Apartments : Ventilation
A1 NTS MMD-HT-H1-Z05-50-AL03 P01 Drawing Superseded
Schematic Diagram (Sheet 03 of 04)
Zone 05 - Hotel and Serviced Apartments : Ventilation
A1 NTS MMD-HT-H1-Z05-50-AL04 P01 Drawing Superseded
Schematic Diagram (Sheet 04 of 04)
Zone 05 - Hotel and Serviced Apartments : Chilled Water
A1 NTS MMD-HT-H2-Z05-50-AL01 P01 Drawing Superseded
Schematic Diagram (Sheet 01 of 04)
Zone 05 - Hotel and Serviced Apartments : Chilled Water
A1 NTS MMD-HT-H2-Z05-50-AL02 P01 Drawing Superseded
Schematic Diagram (Sheet 02 of 04)
Zone 05 - Hotel and Serviced Apartments : Chilled Water
A1 NTS MMD-HT-H2-Z05-50-AL03 P01 Drawing Superseded
Schematic Diagram (Sheet 03 of 04)
Distribution Number of copies / Medium
Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 3 Page 3 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 4 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 05 - Hotel and Serviced Apartments : Chilled Water
A1 NTS MMD-HT-H2-Z05-50-AL04 P01 Drawing Superseded
Schematic Diagram (Sheet 04 of 04)
Zone 05 - Hotel and Serviced Apartments : Pressurisation
A1 NTS MMD-HT-H3-Z05-50-AL01 P01 Drawing Superseded
Schematic Diagram ( Sheet 01 of 02)
Zone 05 - Hotel and Serviced Apartments : Pressurisation
A1 NTS MMD-HT-H3-Z05-50-AL02 P01 Drawing Superseded
Schematic Diagram ( Sheet 02 of 02)
Zone 05 - Hotel and Serviced Apartments : Carpark
A1 NTS MMD-HT-H1-Z05-50-LG10 P01 Drawing Superseded
Ventilation Schematic Diagram (P1 level)
Zone 05 - Hotel & Serviced Apartments : HVAC Equipment
A0 NTS MMD-M5-H0-HT-50-AL01 P01 P02
Schedule (Sheet 01 of 04)
Zone 05 - Hotel & Serviced Apartments : HVAC Equipment
A0 NTS MMD-M5-H0-HT-50-AL02 P01 P02
Schedule (Sheet 02 of 04)
Zone 05 - Hotel & Serviced Apartments : HVAC Equipment
A0 NTS MMD-M5-H0-HT-50-AL03 P01 P02
Schedule (Sheet 03 of 04)
Zone 05 - Hotel & Serviced Apartments : HVAC Equipment
A0 NTS MMD-M5-H0-HT-50-AL04 P01 P02
Schedule (Sheet 04 of 04)
Zone 05 - Hotel and Serviced Apartments : Ventilation
A0 NTS MMD-M5-H1-HT-50-AL01 P02 P03
Schematic Diagram (Sheet 01 of 04)
Zone 05 - Hotel and Serviced Apartments : Ventilation
A0 NTS MMD-M5-H1-HT-50-AL02 P02 P03
Schematic Diagram (Sheet 02 of 04)
Zone 05 - Hotel and Serviced Apartments : Ventilation
A0 NTS MMD-M5-H1-HT-50-AL03 P02 P03
Schematic Diagram (Sheet 03 of 04)
Zone 05 - Hotel and Serviced Apartments : Ventilation
A0 NTS MMD-M5-H1-HT-50-AL04 P02 P03
Schematic Diagram (Sheet 04 of 04)
Zone 05 - Hotel and Serviced Apartments : Chilled Water
A0 NTS MMD-M5-H2-HT-50-AL01 P02 P03
Schematic Diagram (Sheet 01 of 04)
Zone 05 - Hotel and Serviced Apartments : Chilled Water
A0 NTS MMD-M5-H2-HT-50-AL02 P02 P03
Schematic Diagram (Sheet 02 of 04)
Zone 05 - Hotel and Serviced Apartments : Chilled Water
A0 NTS MMD-M5-H2-HT-50-AL03 P02 P03
Schematic Diagram (Sheet 03 of 04)
Zone 05 - Hotel and Serviced Apartments : Chilled Water
A0 NTS MMD-M5-H2-HT-50-AL04 P02 P03
Schematic Diagram (Sheet 04 of 04)
Zone 05 - Hotel and Serviced Apartments : Basement Floor :
A0 1:100 MMD-M5-H0-HT-20-B101 P01 P02
Ventilation & Air Conditioning Layout (Sheet 01 of 02)
Zone 05 - Hotel and Serviced Apartments : Basement Floor :
A0 1:100 MMD-M5-H0-HT-20-B102 P01 P02
Ventilation & Air Conditioning Layout (Sheet 02 of 04)
Zone 05 - Hotel and Serviced Apartments : Basement Floor :
A0 1:100 MMD-M5-H0-HT-20-B103 P01 P02
Ventilation & Air Conditioning Layout (Sheet 03 of 04)
Zone 05 - Hotel and Serviced Apartments : Basement Floor :
A0 1:100 MMD-M5-H0-HT-20-B104 P01 P02
Ventilation & Air Conditioning Layout (Sheet 04 of 04)
Zone 05 - Hotel and Serviced Apartments : Podium 1 Floor :
A0 1:100 MMD-M5-H0-HT-20-P101 P01 P02
Ventilation & Air Conditioning Layout (Sheet 01 of 04)
Zone 05 - Hotel and Serviced Apartments : Podium 1 Floor :
A0 1:100 MMD-M5-H0-HT-20-P102 P01 P02
Ventilation & Air Conditioning Layout (Sheet 02 of 04)
Zone 05 - Hotel and Serviced Apartments : Podium 1 Floor :
A0 1:100 MMD-M5-H0-HT-20-P103 P01 P02
Ventilation & Air Conditioning Layout (Sheet 03 of 04)
Zone 05 - Hotel and Serviced Apartments : Podium 1 Floor :
A0 1:100 MMD-M5-H0-HT-20-P104 P01 P02
Ventilation & Air Conditioning Layout (Sheet 04 of 04)
Zone 05 - Hotel and Serviced Apartments : Podium 2 Floor :
A0 1:100 MMD-M5-H0-HT-20-P201 P01 P02
Ventilation & Air Conditioning Layout (Sheet 01 of 02)
Distribution Number of copies / Medium
Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 4 Page 4 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 5 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 05 - Hotel and Serviced Apartments : Podium 2 Floor :
A0 1:100 MMD-M5-H0-HT-20-P202 P01 P02
Ventilation & Air Conditioning Layout (Sheet 02 of 02)
Zone 05 - Hotel and Serviced Apartments : Podium 3 Floor :
A0 1:100 MMD-M5-H0-HT-20-P301 P01 P02
Ventilation & Air Conditioning Layout (Sheet 01 of 02)
Zone 05 - Hotel and Serviced Apartments : Podium 3 Floor :
A0 1:100 MMD-M5-H0-HT-20-P302 P01 P02
Ventilation & Air Conditioning Layout (Sheet 02 of 02)
Zone 05 - Hotel and Serviced Apartments : First Floor :
A0 1:100 MMD-M5-H0-HT-20-0101 P01 P02
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Second Floor :
A0 1:100 MMD-M5-H0-HT-20-0201 P01 P02
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Third Floor :
A0 1:100 MMD-M5-H0-HT-20-0301 Typical to Second Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Fourth Floor :
A0 1:100 MMD-M5-H0-HT-20-0401 Typical to Second Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Fifth Floor :
A0 1:100 MMD-M5-H0-HT-20-0501 Typical to Second Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Sixth Floor :
A0 1:100 MMD-M5-H0-HT-20-0601 Typical to Second Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Seventh Floor :
A0 1:100 MMD-M5-H0-HT-20-0701 Typical to Second Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Eighth Floor :
A0 1:100 MMD-M5-H0-HT-20-0801 Typical to Second Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Ninth Floor :
A0 1:100 MMD-M5-H0-HT-20-0901 P01 P02
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Tenth Floor :
A0 1:100 MMD-M5-H0-HT-20-1001 P01 P02
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Eleventh Floor :
A0 1:100 MMD-M5-H0-HT-20-1101 Typical to Tenth Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Twelfth Floor :
A0 1:100 MMD-M5-H0-HT-20-1201 Typical to Tenth Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Thirteenth Floor :
A0 1:100 MMD-M5-H0-HT-20-1303 P01 P02
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Fourteenth Floor :
A0 1:100 MMD-M5-H0-HT-20-1401 Typical to Tenth Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Fifteenth Floor :
A0 1:100 MMD-M5-H0-HT-20-1501 Typical to Thirteenth Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Sixteenth Floor :
A0 1:100 MMD-M5-H0-HT-20-1601 Typical to Tenth Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Seventeenth Floor :
A0 1:100 MMD-M5-H0-HT-20-1701 Typical to Tenth Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Eighteenth Floor :
A0 1:100 MMD-M5-H0-HT-20-1801 Typical to Tenth Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Nineteenth Floor :
A0 1:100 MMD-M5-H0-HT-20-1901 P01 P02
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Twentieth Floor :
A0 1:100 MMD-M5-H0-HT-20-2001 Typical to Tenth Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Twenty First Floor :
A0 1:100 MMD-M5-H0-HT-20-2101 Typical to Thirteenth Floor
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Twenty Second
A0 1:100 MMD-M5-H0-HT-20-2201 P01
Floor : Ventilation & Air Conditioning Layout
Distribution Number of copies / Medium
Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 5 Page 5 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 6 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 05 - Hotel and Serviced Apartments : Twenty Third Floor
A0 1:100 MMD-M5-H0-HT-20-2301 P01 P02
: Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Twenty Fourth
A0 1:100 MMD-M5-H0-HT-20-2401 P01 P02
Floor : Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Twenty Fifth Floor :
A0 1:100 MMD-M5-H0-HT-20-2501 P01 P02
Ventilation & Air Conditioning Layout
Zone 05 - Hotel and Serviced Apartments : Pressurisation
A0 NTS MMD-M5-H3-HT-50-AL10 P02 P03
Schematic Diagram
Zone 05 - Hotel and Serviced Apartments : Podium 1 Floor :
A0 NTS MMD-M5-H1-HT-50-P101 P01 P02
Carpark Ventilation Schematic Diagram
Zone 05 - Hotel and Serviced Apartments : Podium 1 Floor :
A0 1:100 MMD-M5-H1-HT-20-P101 P01 P02
Carpark Ventilation Layout (Sheet 01 of 04)
Zone 05 - Hotel and Serviced Apartments : Podium 1 Floor :
A0 1:100 MMD-M5-H1-HT-20-P102 P01 P02
Carpark Ventilation Layout (Sheet 02 of 04)
Zone 05 - Hotel and Serviced Apartments : Podium 1 Floor :
A0 1:100 MMD-M5-H1-HT-20-P103 P01 P02
Carpark Ventilation Layout (Sheet 03 of 04)
Zone 05 - Hotel and Serviced Apartments : Podium 1 Floor :
A0 1:100 MMD-M5-H1-HT-20-P104 P01 P02
Carpark Ventilation Layout (Sheet 04 of 04)
Zone 05 - Luxury Villa : All Level : Ventilation & Airconditioning
A0 1:50 MMD-M5-H0-LV-20-AL01 Sheet Not Produced
Layout
Zone 05 - Super Luxury Villa : Ground & First Floor :
A0 1:50 MMD-M5-H0-SL-20-AL01 P01 P02
Ventilation & Airconditioning Layout
Zone 05 - Super Luxury Villa : Roof : Ventilation &
A0 1:50 MMD-M5-H0-SL-20-AL02 P01 P02
Airconditioning Layout
Zone 05 - Executive Villa : Ground & First Floor : Ventilation &
A0 1:50 MMD-M5-H0-EV-20-AL01 P01 P02
Airconditioning Layout
Zone 05 - Executive Villa : Roof : Ventilation & Airconditioning
A0 1:50 MMD-M5-H0-EV-20-AL02 P01 P02
Layout
Zone 05 - Presidential Villa : Ground & First Floor : Ventilation
A0 1:50 MMD-M5-H0-PV-20-AL01 P01 P02
& Airconditioning Layout
Zone 05 - Presidential Villa : Roof : Ventilation &
A0 1:50 MMD-M5-H0-PV-20-AL02 P01 P02
Airconditioning Layout
Zone 05 - Cabanas : All Level : Ventilation & Airconditioning
A0 1:100 MMD-M5-H0-CB-20-AL01 Sheet Not Produced
Layout
Zone 05 - 360 Degree Restaurant : Ground Floor : Ventilation
A0 1:100 MMD-M5-H0-GD-20-0001 Sheet Not Produced
& Airconditioning Layout
Zone 05 - 360 Degree Restaurant : Roof Level : Ventilation &
A0 1:100 MMD-M5-H0-GD-20-0101 Sheet Not Produced
Airconditioning Layout
Zone 05 - Beach Facility : All Level : Ventilation &
A0 1:100 MMD-M5-H0-BH-20-AL01 Sheet Not Produced
Airconditioning Layout
Zone 05 - Freehold Apartments
Zone 05 - Freehold Apartments : Chilled Water Schematic
A1 NTS MMD-FA-H2-Z05-50-AL01 P01 Drawing Superseded
Diagram (Sheet 1 of 9)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A1 NTS MMD-FA-H2-Z05-50-AL02 P01 Drawing Superseded
Diagram (Sheet 2 of 9)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A1 NTS MMD-FA-H2-Z05-50-AL03 P01 Drawing Superseded
Diagram (Sheet 3 of 9)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A1 NTS MMD-FA-H2-Z05-50-AL04 P01 Drawing Superseded
Diagram (Sheet 4 of 9)
Distribution Number of copies / Medium
Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 6 Page 6 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 7 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 05 - Freehold Apartments : Chilled Water Schematic
A1 NTS MMD-FA-H2-Z05-50-AL05 P01 Drawing Superseded
Diagram (Sheet 5 of 9)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A1 NTS MMD-FA-H2-Z05-50-AL06 P01 Drawing Superseded
Diagram (Sheet 6 of 9)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A1 NTS MMD-FA-H2-Z05-50-AL07 P01 Drawing Superseded
Diagram (Sheet 7 of 9)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A1 NTS MMD-FA-H2-Z05-50-AL08 P01 Drawing Superseded
Diagram (Sheet 8 of 9)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A1 NTS MMD-FA-H2-Z05-50-AL09 P01 Drawing Superseded
Diagram (Sheet 9 of 9)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL01 P01 Drawing Superseded
Diagram - (Sheet 01 of 12)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL02 P01 Drawing Superseded
Diagram - (Sheet 02 of 12)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL03 P01 Drawing Superseded
Diagram - (Sheet 03 of 12)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL04 P01 Drawing Superseded
Diagram - (Sheet 04 of 12)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL05 P01 Drawing Superseded
Diagram - (Sheet 05 of 12)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL06 P01 Drawing Superseded
Diagram - (Sheet 06 of 12)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL07 P01 Drawing Superseded
Diagram - (Sheet 07 of 12)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL08 P01 Drawing Superseded
Diagram - (Sheet 08 of 12)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL09 P01 Drawing Superseded
Diagram - (Sheet 09 of 12)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL10 P01 Drawing Superseded
Diagram - (Sheet 10 of 12)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL11 P01 Drawing Superseded
Diagram - (Sheet 11 of 12)
Zone 05 - Freehold Apartments : Ventilation Schematic
A1 NTS MMD-FA-H1-Z05-50-AL12 P01 Drawing Superseded
Diagram - (Sheet 12 of 12)
Zone 05 - Freehold Apartments : Pressurisation Schematic
A1 NTS MMD-FA-H3-Z05-50-AL01 P01 Drawing Superseded
Diagram (Sheet 01 of 04)
Zone 05 - Freehold Apartments : Pressurisation Schematic
A1 NTS MMD-FA-H3-Z05-50-AL02 P01 Drawing Superseded
Diagram (Sheet 02 of 04)
Zone 05 - Freehold Apartments : Pressurisation Schematic
A1 NTS MMD-FA-H3-Z05-50-AL03 P01 Drawing Superseded
Diagram (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Pressurisation Schematic
A1 NTS MMD-FA-H3-Z05-50-AL04 P01 Drawing Superseded
Diagram (Sheet 04 of 04)
Zone 05 - Freehold Apartments : Carpark Ventilation
A1 NTS MMD-FA-H1-Z05-50-LG10 P01 Drawing Superseded
Schematic Diagram (P1 level)
Zone 05 - Freehold Apartments : HVAC Equipment Schedule
A0 NTS MMD-M5-H0-FA-50-AL01 P01 P02
(Sheet 01 of 04)
Zone 05 - Freehold Apartments : HVAC Equipment Schedule
A0 NTS MMD-M5-H0-FA-50-AL02 P01 P02
(Sheet 02 of 04)
Zone 05 - Freehold Apartments : HVAC Equipment Schedule
A0 NTS MMD-M5-H0-FA-50-AL03 P01 P02
(Sheet 03 of 04)
Distribution Number of copies / Medium
Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 7 Page 7 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 8 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 05 - Freehold Apartments : HVAC Equipment Schedule
A0 NTS MMD-M5-H0-FA-50-AL04 P01 P02
(Sheet 04 of 04)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A0 NTS MMD-M5-H2-FA-50-AL01 P02 P03
Diagram (Sheet 01 of 05)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A0 NTS MMD-M5-H2-FA-50-AL02 P02 P03
Diagram (Sheet 02 of 05)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A0 NTS MMD-M5-H2-FA-50-AL03 P02 P03
Diagram (Sheet 03 of 05)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A0 NTS MMD-M5-H2-FA-50-AL04 P02 P03
Diagram (Sheet 04 of 05)
Zone 05 - Freehold Apartments : Chilled Water Schematic
A0 NTS MMD-M5-H2-FA-50-AL05 P02 P03
Diagram (Sheet 05 of 05)
Zone 05 - Freehold Apartments : Ventilation Schematic
A0 NTS MMD-M5-H1-FA-50-AL01 P02 P03
Diagram - (Sheet 01 of 10)
Zone 05 - Freehold Apartments : Ventilation Schematic
A0 NTS MMD-M5-H1-FA-50-AL02 P02 P03
Diagram - (Sheet 02 of 10)
Zone 05 - Freehold Apartments : Ventilation Schematic
A0 NTS MMD-M5-H1-FA-50-AL03 P02 P03
Diagram - (Sheet 03 of 10)
Zone 05 - Freehold Apartments : Ventilation Schematic
A0 NTS MMD-M5-H1-FA-50-AL04 P02 P03
Diagram - (Sheet 04 of 10)
Zone 05 - Freehold Apartments : Ventilation Schematic
A0 NTS MMD-M5-H1-FA-50-AL05 P02 P03
Diagram - (Sheet 05 of 10)
Zone 05 - Freehold Apartments : Ventilation Schematic
A0 NTS MMD-M5-H1-FA-50-AL06 P02 P03
Diagram - (Sheet 06 of 10)
Zone 05 - Freehold Apartments : Ventilation Schematic
A0 NTS MMD-M5-H1-FA-50-AL07 P02 P03
Diagram - (Sheet 07 of 10)
Zone 05 - Freehold Apartments : Ventilation Schematic
A0 NTS MMD-M5-H1-FA-50-AL08 P02 P03
Diagram - (Sheet 08 of 10)
Zone 05 - Freehold Apartments : Ventilation Schematic
A0 NTS MMD-M5-H1-FA-50-AL09 P02 P03
Diagram - (Sheet 09 of 10)
Zone 05 - Freehold Apartments : Ventilation Schematic
A0 NTS MMD-M5-H1-FA-50-AL10 P02 P03
Diagram - (Sheet 10 of 10)
Zone 05 - Freehold Apartments : Podium 1 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P101 P01 P02
& Air Conditioning Layout (Sheet 01 of 04)
Zone 05 - Freehold Apartments : Podium 1 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P102 P01 P02
& Air Conditioning Layout (Sheet 02 of 04)
Zone 05 - Freehold Apartments : Podium 1 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P103 P01 P02
& Air Conditioning Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Podium 1 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P104 P01 P02
& Air Conditioning Layout (Sheet 04 of 04)
Zone 05 - Freehold Apartments : Podium 2 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P201 P01 P02
& Air Conditioning Layout (Sheet 01 of 04)
Zone 05 - Freehold Apartments : Podium 2 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P202 P01 P02
& Air Conditioning Layout (Sheet 02 of 04)
Zone 05 - Freehold Apartments : Podium 2 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P203 P01 P02
& Air Conditioning Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Podium 2 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P204 P01 P02
& Air Conditioning Layout (Sheet 04 of 04)
Zone 05 - Freehold Apartments : Podium 3 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P301 P01 P02
& Air Conditioning Layout (Sheet 01 of 04)
Distribution Number of copies / Medium
Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 8 Page 8 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 9 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 05 - Freehold Apartments : Podium 3 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P302 P01 P02
& Air Conditioning Layout (Sheet 02 of 04)
Zone 05 - Freehold Apartments : Podium 3 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P303 P01 P02
& Air Conditioning Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Podium 3 Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-P304 P01 P02
& Air Conditioning Layout (Sheet 04 of 04)
Zone 05 - Freehold Apartments : First Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0101 P01 P02
Conditioning Layout (Sheet 01 of 04)
Zone 05 - Freehold Apartments : First Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0102 P01 P02
Conditioning Layout (Sheet 02 of 04)
Zone 05 - Freehold Apartments : First Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0103 P01 P02
Conditioning Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : First Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0104 P01 P02
Conditioning Layout (Sheet 04 of 04)
Zone 05 - Freehold Apartments : Second Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0201 Typical to Third Floor
Air Conditioning Layout (Sheet 01 of 04)
Zone 05 - Freehold Apartments : Second Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0202 Typical to Third Floor
Air Conditioning Layout (Sheet 02 of 04)
Zone 05 - Freehold Apartments : Second Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0203 Typical to Third Floor
Air Conditioning Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Second Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0204 Typical to Third Floor
Air Conditioning Layout (Sheet 04 of 04)
Zone 05 - Freehold Apartments : Third Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0301 P01 P02
Conditioning Layout (Sheet 01 of 04)
Zone 05 - Freehold Apartments : Third Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0302 P01 P02
Conditioning Layout (Sheet 02 of 04)
Zone 05 - Freehold Apartments : Third Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0303 P01 P02
Conditioning Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Third Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0304 P01 P02
Conditioning Layout (Sheet 04 of 04)
Zone 05 - Freehold Apartments : Fourth Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0401 Typical to Third Floor
Air Conditioning Layout (Sheet 01 of 04)
Zone 05 - Freehold Apartments : Fourth Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0402 Typical to Third Floor
Air Conditioning Layout (Sheet 02 of 04)
Zone 05 - Freehold Apartments : Fourth Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0403 Typical to Third Floor
Air Conditioning Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Fourth Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0404 Typical to Third Floor
Air Conditioning Layout (Sheet 04 of 04)
Zone 05 - Freehold Apartments : Fifth Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0501 Typical to Third Floor
Conditioning Layout (Sheet 01 of 04)
Zone 05 - Freehold Apartments : Fifth Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0502 Typical to Third Floor
Conditioning Layout (Sheet 02 of 04)
Zone 05 - Freehold Apartments : Fifth Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0503 Typical to Third Floor
Conditioning Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Fifth Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0504 Typical to Third Floor
Conditioning Layout (Sheet 04 of 04)
Zone 05 - Freehold Apartments : Sixth Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0601 Typical to Third Floor
Conditioning Layout (Sheet 01 of 04)
Zone 05 - Freehold Apartments : Sixth Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0602 Typical to Third Floor
Conditioning Layout (Sheet 02 of 04)
Distribution Number of copies / Medium
Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 9 Page 9 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 10 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 05 - Freehold Apartments : Sixth Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0603 Typical to Third Floor
Conditioning Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Sixth Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0604 Typical to Third Floor
Conditioning Layout (Sheet 04 of 04)
Zone 05 - Freehold Apartments : Seventh Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0701 Typical to Third Floor
Air Conditioning Layout (Sheet 01 of 04)
Zone 05 - Freehold Apartments : Seventh Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0702 Typical to Third Floor
Air Conditioning Layout (Sheet 02 of 04)
Zone 05 - Freehold Apartments : Seventh Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0703 Typical to Third Floor
Air Conditioning Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Seventh Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0704 Typical to Third Floor
Air Conditioning Layout (Sheet 04 of 04)
Zone 05 - Freehold Apartments : Eighth Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0801 P01 P02
Air Conditioning Layout (Sheet 01 of 02)
Zone 05 - Freehold Apartments : Eighth Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-0802 P01 P02
Air Conditioning Layout (Sheet 02 of 02)
Zone 05 - Freehold Apartments : Ninth Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0901 P01 P02
Conditioning Layout (Sheet 01 of 02)
Zone 05 - Freehold Apartments : Ninth Floor : Ventilation & Air
A0 1:100 MMD-M5-H0-FA-20-0902 P01 P02
Conditioning Layout (Sheet 02 of 02)
Zone 05 - Freehold Apartments : Tenth Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-1001 P01 P02
Air Conditioning Layout
Zone 05 - Freehold Apartments : Eleventh Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-1101 Typical to Tenth Floor
& Air Conditioning Layout
Zone 05 - Freehold Apartments : Twelfth Floor : Ventilation &
A0 1:100 MMD-M5-H0-FA-20-1201 P01 P02
Air Conditioning Layout
Zone 05 - Freehold Apartments : Thirteenth Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-1301 Typical to Twelfth Floor
& Air Conditioning Layout
Zone 05 - Freehold Apartments : Fourteenth Floor :
A0 1:100 MMD-M5-H0-FA-20-1401 Typical to Twelfth Floor
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Fifteenth Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-1501 P01 P02
& Air Conditioning Layout
Zone 05 - Freehold Apartments : Sixteenth Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-1601 P01 P02
& Air Conditioning Layout
Zone 05 - Freehold Apartments : Seventeenth Floor :
A0 1:100 MMD-M5-H0-FA-20-1701 Typical to Sixteenth Floor
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Eighteenth Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-1801 Typical to Sixteenth Floor
& Air Conditioning Layout
Zone 05 - Freehold Apartments : Nineteenth Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-1901 Typical to Sixteenth Floor
& Air Conditioning Layout
Zone 05 - Freehold Apartments : Twentieth Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-2001 Typical to Sixteenth Floor
& Air Conditioning Layout
Zone 05 - Freehold Apartments : Twenty First Floor :
A0 1:100 MMD-M5-H0-FA-20-2101 P01 P02
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Twenty Second Floor :
A0 1:100 MMD-M5-H0-FA-20-2201 Typical to Twenty First Floor
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Twenty Third Floor :
A0 1:100 MMD-M5-H0-FA-20-2301 Typical to Twenty First Floor
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Twenty Fourth Floor :
A0 1:100 MMD-M5-H0-FA-20-2401 Typical to Twenty First Floor
Ventilation & Air Conditioning Layout
Distribution Number of copies / Medium
Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 10 Page 10 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 11 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 05 - Freehold Apartments : Twenty Fifth Floor :
A0 1:100 MMD-M5-H0-FA-20-2501 Typical to Twenty First Floor
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Twenty Sixth Floor :
A0 1:100 MMD-M5-H0-FA-20-2601 Typical to Twenty First Floor
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Twenty Seventh Floor :
A0 1:100 MMD-M5-H0-FA-20-2701 Typical to Twenty First Floor
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Twenty Eighth Floor :
A0 1:100 MMD-M5-H0-FA-20-2801 Typical to Twenty First Floor
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Twenty Ninth Floor :
A0 1:100 MMD-M5-H0-FA-20-2901 Typical to Twenty First Floor
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Thirteenth Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-3001 P01 P02
& Air Conditioning Layout
Zone 05 - Freehold Apartments : Thirty First Floor : Ventilation
A0 1:100 MMD-M5-H0-FA-20-3101 Typical to Thirtieth Floor
& Air Conditioning Layout
Zone 05 - Freehold Apartments : Thirty Second Floor :
A0 1:100 MMD-M5-H0-FA-20-3201 P01 P02
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Thirty Third Floor :
A0 1:100 MMD-M5-H0-FA-20-3301 P01 P02
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Thirty Fourth Floor :
A0 1:100 MMD-M5-H0-FA-20-3401 P01 P02
Ventilation & Air Conditioning Layout
Zone 05 - Freehold Apartments : Pressurisation Schematic
A0 NTS MMD-M5-H3-FA-50-AL20 P02 P02
Diagram (Sheet 01 of 03)
Zone 05 - Freehold Apartments : Pressurisation Schematic
A0 NTS MMD-M5-H3-FA-50-AL21 P02 P02
Diagram (Sheet 02 of 03)
Zone 05 - Freehold Apartments : Pressurisation Schematic
A0 NTS MMD-M5-H3-FA-50-AL22 P02 P02
Diagram (Sheet 03 of 03)
Zone 05 - Freehold Apartments : Podium 1 & 2 Floor : Carpark
A0 NTS MMD-M5-H1-FA-50-AL23 P02 P02
Ventilation Schematic Diagram
Zone 05 - Freehold Apartments : Podium 1 Floor : Carpark
A0 1:100 MMD-M5-H1-FA-20-P101 P01 P02
Ventilation Layout (Sheet 01 of 04)
Zone 05 - Freehold Apartments : Podium 1 Floor : Carpark
A0 1:100 MMD-M5-H1-FA-20-P102 P01 P02
Ventilation Layout (Sheet 02 of 04)
Zone 05 - Freehold Apartments : Podium 1 Floor : Carpark
A0 1:100 MMD-M5-H1-FA-20-P103 P01 P02
Ventilation Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Podium 1 Floor : Carpark
A0 1:100 MMD-M5-H1-FA-20-P104 P01 P02
Ventilation Layout (Sheet 04 of 04)
Zone 05 - Freehold Apartments : Podium 2 Floor : Carpark
A0 1:100 MMD-M5-H1-FA-20-P201 P01 P02
Ventilation Layout (Sheet 01 of 04)
Zone 05 - Freehold Apartments : Podium 2 Floor : Carpark
A0 1:100 MMD-M5-H1-FA-20-P202 P01 P02
Ventilation Layout (Sheet 02 of 04)
Zone 05 - Freehold Apartments : Podium 2 Floor : Carpark
A0 1:100 MMD-M5-H1-FA-20-P203 P01 P02
Ventilation Layout (Sheet 03 of 04)
Zone 05 - Freehold Apartments : Podium 2 Floor : Carpark
A0 1:100 MMD-M5-H1-FA-20-P204 P01 P02
Ventilation Layout (Sheet 04 of 04)
Zone 06- Basement
Zone 06 - Basement : Carpark Ventilation Schematic Diagram
A1 NTS MMD-MA-H1-Z06-50-B101 P01 Drawing Superseded
Including Service Yard (Basement below Zone-3 & Zone-5)
Zone 06 - Basement : HVAC Equipment Schedule A0 NTS MMD-M6-H0-BM-50-AL01 P01

Distribution Number of copies / Medium


Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 11 Page 11 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 12 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 06 - Basement : Carpark & Service Yard Ventilation
A0 NTS MMD-M6-H1-BM-50-B101 P02
Schematic Diagram
Zone 06 - Basement :Ventilation & Air Conditioning Schematic
A0 NTS MMD-M6-H0-BM-50-B101 P01
Diagram
Zone 06 - Basement : Overall GA Plan : Carpark & Service
A0 1:500 MMD-M6-H1-BM-20-B101 P01
Yard Ventilation Layout (Sheet 00)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B102 P01
01 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B103 P01
02 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B104 P01
03 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B105 P01
04 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B106 P01
05 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B107 P01
06 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B108 P01
07 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B109 P01
08 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B110 P01
09 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B111 P01
10 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B112 P01
11 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B113 P01
12 of 13)
Zone 06 - Basement : Carpark & Service Yard Layout (Sheet
A0 1:100 MMD-M6-H1-BM-20-B114 P01
13 of 13)
Zone 06 - Basement : Overall GA Plan : Ventilation & Air
A0 1:500 MMD-M6-H0-BM-20-B101 P01
Conditioning Layout (Sheet 00)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B102 P01
(Sheet 01 of 13)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B103 P01
(Sheet 02 of 13)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B104 P01
(Sheet 03 of 13)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B105 P01
(Sheet 04 of 13)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B106 No Services
(Sheet 05 of 13)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B107 P01
(Sheet 06 of 13)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B108 P01
(Sheet 07 of 13)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B109 P01
(Sheet 08 of 13)
Distribution Number of copies / Medium
Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 12 Page 12 of 13
Drawing Register & Transmittal
Al Moayed house
Project Title Bahrain Marina PO Box 10471
Al Seef District
Project No. 351037 Manama
Kingdom of Bahrain
Discipline. HVAC

16-Nov-16

24-Nov-16

02-Dec-16

15-Dec-16

23-Dec-16
17-Jul-16
Sheet No. 13 of 13 Date of Issue

Title Size Scale Drawing No.


Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B110 P01
(Sheet 09 of 13)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B111 No Services
(Sheet 10 of 13)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B112 P01
(Sheet 11 of 13)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B113 No Services
(Sheet 12 of 13)
Zone 06 - Basement : Ventilation & Air Conditioning Layout
A0 1:100 MMD-M6-H0-BM-20-B114 No Services
(Sheet 13 of 13)

Distribution Number of copies / Medium


Benoy I I/P I/P I/P I/P I/P

Office copy PW PW PW PW PW PW
Record Copy

State the purpose of issue: Purpose of Issue


Example: IF = For Information
100% SD-Revised

PRE = Preliminary
APR = Approval (External)
100% SD

100% SD

100% SD

100% SD
50% SD

FC = For Construction
T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC 13 Page 13 of 13