Facility Layout FINAL-Layout1
Facility Layout FINAL-Layout1
To Existing Gully
2.55 via Mangrove Swamp
229250.00
87500.00
87500.00
2.55 Concrete Kerb
A 1.75
62500.00
18637.57
139375.00
2.85
Precast Concrete Kerb
43750.16
100033.68
TRANS-
1.2m X 0.1m thick conc. FORMER
E
n
125000.00
ai Inv.=2.00
Dr El = 4.1m 600mm R.C. Culvert
Up
r th Rodding eyes at ends B
Ea
F
of rain water collectors B
20m
2.71
200mm sewer grade
INV.=2.65 Inv.=2.39
2.885 pvc for rain roof water.
125001.84
2.55
Down
20m
304192.45
3.42
125001.84
Cable Trench
62500.00
0.3 x 0.3 M.H Pump
150mm pvc
Septic Tank Pump to Drain
Inv.=2.625 M/H Inv.=2.600
150MM PVC Inv.=2.43
Inv.=2.70 Roof drain outlets(20
Ear
0mm pvc)
pvc
2M WIDTH FOR ELEC M/H Inv.=2.475
37500.00
TICAL CON DUITS
m
125007.37
th D
150m
3.25
0.3 x 0.3 M.H
175000.02
ra
50mm thick AC. surface
175000.02
DUITS
in
175000.00
on 300mm thick marl base
25000.00
115874.88
Inv.=2.76
150mm pvc
175000.00
150mm pvc
TICAL CON
175000.00
175000.00
Con
125000.02
38902.43
85994.32
100000.00
62500.00
100000.00
100048.82
56698.88
26070.39
100000.00
cret
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
e D
100000.00
296404.21
100000.00
100000.00
100048.82
100000.00
DSD Shoulder 1.2m wide
rain
G H
INV.=2.76
22191.83
287202.30
3.42 0.3 x 0.3 M.H
150mm pvc 600mm R.C. Culvert
Fall
C
M/H INV.=2.736 INV.=2.370
1.2 x 1.2 x 1.2 M.H
15000.00
M/H Inv.=2.26
INV.=2.896 150mm pvc 3.17 0.3 x 0.3 M.H 150MM PV
C
0.6x0.6 M.H
WATER
150mm pvc
. CHANNEL INV.=2.816 TREATMENT
D
vc Inv.=2.48
3.07
p
m
1 50m M/H INV.=2.380
M/H INV.=2.33 M/H INV.=2.545
3.212 INV.=2.201 M/H INV.=2.34 150mm pvc
3.00
150mm pvc
Invert El.=2.25
LPG Line
50mm dia. black iron
3.00
pvc
DUITS
150mm pvc
87500.00
90462.26
100mm
TICAL CON
Fall (1:30)
sidewalk
150mm pvc
123668.04
Outlet El.=3.006
R287500.00
2.5m X 2.5m X 100mm
Tied into
Reinforced conc. walls High Plinth
Monk as per detail Divert existing JPS Co.
existing
fire system
R225000.00
(To control overflow pipeline on to existing 3.15
68502.44
200mm pvc drain PIPE INV.=3.12
300mm Gate Valve level discharge) 2M WIDTH FOR ELEC
concrete pads. for raw water to earth drain 3.30 3.50 TICAL CON DUITS
221551.32
Sump
28977.39
1.2 x 1.2 x 2.2 deep
Fall (1:30) Waste water from Dehydration
28252.64
plant & cooling towers
2.55 Inv. = 1.22
Concrete Drain
108.00
60.00
13.41
200mm Gate Valve 3.35
900mm x 900mm M/H Inv.=2.03 Inv. = 1.97 Fire water line
Elevation @ Gully = 2.0 Chamber with grating Drain Inv.=2.80 3.25 4" dia. black iron
cover
125000.00
Up Ramp 50mm pvc thru 150mm pvc sleeve
Down
LPG Line
B
2" dia. black iron
187500.00
A
50mm pumping main
thru 150mm pvc sleeve
362930.55
737856.61
R.C Wall with sloping top Earth Drain Inv.=2.65
Fall level and 150mm concrete
roadway on compacted marl
196837.26
fill within wall. R.C. Three Chamber oil / water
separator #1
(See Dwg. N0. J1352 / S2 / 10)
87500.00
Ring Beam
Top Elvn = 3.70 m Se
ptic RO Ponds
Ta
nk
200mm Pvc Pipe
ide
Earth Drain 2m w
..\..\..\Desktop\ZAC2.png
363483.68
Monk detail (same as before R.C Bundwall 30,0
GA 00
362688.40
Top Elvn = 4.30 m L
WC .
with cedar drop boards to
LPG TANKS
trial
control water depth)
trial
251460.00
FOOTING
New R.C Bund wall 200mm
92192.87
New R.C Bund wall 200mm thick (same detail as before) VAPOURIZER Outfall to Bower's
R.C Bundwall FOOTING
92178.40
Top Elvn = 4.30 m
monk same as earth drain New 900mm x 300mm depth Earth Construct new concrete kerb
e
and channel to tie into Facultativ
against wall. drain against concrete bund wall Pond
existing gutter. ELEV. 1.
0m
491481.12
300mm Gate Valve 150mm top soil to be removed
wherever top soil now exists.
Grade and add back 150mm thick
300mm Steel pipe marl and spray and chip 1 coat
across road
5m
ELEV. 3.
4m
ELEV. 3.
5m
ELEV. 1.7
n
Maturatio
Pond 1
m
ELEV. 3.4
5m
n ELEV. 1.6
Maturatio
m
ELEV. 3.3
Pond 2
5m
n ELEV. 1.5
Maturatio
Pond 3
m
ELEV. 3.2
m
ELEV. 3.2
m
ELEV. 2.4
D No.1
REEDBE
D No.2
REEDBE
D No.3
REEDBE
JBE/FLP/01