Work order: 52308

Task: Water Leakage Repair for LP Evaporator [West Side]


Date: 15-16 October, 2015
Point person: CHINMOY SEN, MUKTAR HOSSAIN
Supervision: A.B. SIDDIQUE

Findings at HRSG:

Leakage observed at West segment of LP evaporators 3 rd [Last] Header Both Side

Work details:

At first Visual inspection done on 15 Oct, 2015


Leakage observed at both East and West segment of LP evaporators Last header [3 rd Header]
Both side
After cutting patch plate on that side, visually two tube leakage observed on both east and west
side of that header

Action has been taken:

All 4 tubes has been made blind


Leak test has been performed after tube plugged. No leakage observed
LP Evaporator West Header West Side: 2 Tubes Blocked

West Side [Patch Plate Cutting] West Side [Tube Plugged]

LP Evaporator West Header East Side: 2 Tubes Blocked

LPEV-3 East Side [Plugging] East Side [Patch Plate Re-Installed]

Header inside Tube Condition