Two water leaks were observed in the LP evaporator's third header on both the east and west sides during an inspection on October 15, 2015. Four tubes total were found to be leaking through visual inspection and after cutting access plates. The leaking tubes were plugged to stop the leaks and a leak test found no further issues after repair.
Two water leaks were observed in the LP evaporator's third header on both the east and west sides during an inspection on October 15, 2015. Four tubes total were found to be leaking through visual inspection and after cutting access plates. The leaking tubes were plugged to stop the leaks and a leak test found no further issues after repair.
Two water leaks were observed in the LP evaporator's third header on both the east and west sides during an inspection on October 15, 2015. Four tubes total were found to be leaking through visual inspection and after cutting access plates. The leaking tubes were plugged to stop the leaks and a leak test found no further issues after repair.
Two water leaks were observed in the LP evaporator's third header on both the east and west sides during an inspection on October 15, 2015. Four tubes total were found to be leaking through visual inspection and after cutting access plates. The leaking tubes were plugged to stop the leaks and a leak test found no further issues after repair.
Task: Water Leakage Repair for LP Evaporator [West Side]
Date: 15-16 October, 2015 Point person: CHINMOY SEN, MUKTAR HOSSAIN Supervision: A.B. SIDDIQUE
Findings at HRSG:
Leakage observed at West segment of LP evaporators 3 rd [Last] Header Both Side
Work details:
At first Visual inspection done on 15 Oct, 2015
Leakage observed at both East and West segment of LP evaporators Last header [3 rd Header] Both side After cutting patch plate on that side, visually two tube leakage observed on both east and west side of that header
Action has been taken:
All 4 tubes has been made blind
Leak test has been performed after tube plugged. No leakage observed LP Evaporator West Header West Side: 2 Tubes Blocked
West Side [Patch Plate Cutting] West Side [Tube Plugged]
LP Evaporator West Header East Side: 2 Tubes Blocked
LPEV-3 East Side [Plugging] East Side [Patch Plate Re-Installed]