EnergyPerformanceAssessment
St.AlbansEpiscopalChurch
333S.DrexelAve.
Bexley,OH43209
Auditedon6/27/2014through7/3/2014
Contents
ExecutiveSummary...................................................................................................................................................3
KLHProcess...............................................................................................................................................................4
FacilityDescription....................................................................................................................................................4
HowYouUseEnergyToday.......................................................................................................................................6
ENERGYSTARandSustainability..............................................................................................................................7
UtilityBillAnalysis.....................................................................................................................................................8
HowtoAchieveEnergyandCostSavings..................................................................................................................9
EnergySavingsSummary.......................................................................................................................................9
OperationalandMaintenanceConsideration.......................................................................................................9
EnergyConservationMeasures...........................................................................................................................10
APPENDICES.............................................................................................................................................................13
APPENDIXA:COSTBREAKDOWN............................................................................................................................14
APPENDIXB:COMBUSTIONTESTRESULTS.............................................................................................................15
APPENDIXC:ORGANCARE......................................................................................................................................17
The estimated energy savings presented in this report are based on spot and logged measurements of amperage, lighting and temperature
levels, and facility personnel interviews. Estimated energy savings can be greatly affected by the type of installed equipment, the quality of the
installation, and the equipment operating procedures. Thus, all recommendations and savings calculations should be carefully reviewed by
facility personnel, and verified for consistency with operational requirements before implementation. KLH Engineers, PSC does not guarantee
energy savings and bears no responsibility for adverse operational affects due to implementation of projects presented in this report.
St.AlbansEpiscopalChurchEnergyAssessmentreport Page2of18
Executive Summary
Thisenergystudyisaimedtoreducethefacilityenergy
expenses.Particularattentionwasgiventooperational
andmaintenanceimprovementsthatwillimmediately
assistinreducingtheoperatingcost.Manycapital
improvementswereconsideredtoensurethe
continuedperformanceofthebuildingandthe
functionalityofitssystemsovertime.Particularcare
wasgivento:
Currentenergycostandreductionplan
Financialanalysisofproposedsolutions
Occupantcomfortandventilationissues
KeyFindings
OperationalAssessment
ThefollowingitemsrepresentthehighestHVAC
operationalvulnerabilityinthebuilding
HeatingSystemFurnaces
Delivering value to CoolingSystemCondensingUnits
HVACtemperaturesetback
building owners and
EnergyAssessment
TheENERGYSTARratingforthebuildingis58ona
tenants by improving
scaleof100,whichrepresentsaveragebuilding
performance.
systems, increasing
Therecommendedenergyconservationmeasuresin
efficiency and thisreportcangenerateayearlyenergyreductionof
7,085kWhand1,870Therms.
creating quality
InstallprogrammablethermostatsandHVAC
environments through setbackPotentialannualsavings:$2,050
Replacementof2furnaceswithhighefficiency
the integration of equipmentPotentialannualsavings:$400
Replacementof2condensingunitswithhigh
engineering and efficiencyequipmentPotentialannualsavings:
$300
energy management LightingUpgradesapproximateannual
savings:$400
St.AlbansEnergyAssessmentreport Page3of18
KLH Process
KLHEnergySolutionshasconductedanenergyassessmentoftheSt.AlbansEpiscopalChurchlocatedin
Bexley,Ohio.TheteammembersthroughouttheprocesswereMohamedElSayedservingasProject
Manager,andJuliaNoschangservingasEnergyAuditor.
DuringtheassessmenttheKLHteamdocumentedbuildingsystemsequipmentandcondition,operations
andmaintenance,andbuildingcontrols.Thisdocumentationwasperformedthroughmultipleonsite
visits.Duringthevisitsalloftheexistingbuildingsystemsandequipmentwerecatalogedalongwiththe
currentconditionofeachpieceofequipment.Interviewsessionswiththebuildingstaffandfacility
maintenancestaffwereconductedtounderstandhowthebuildingisoperatedandmaintained.Utility
costandconsumptionhistorywasgatheredtogetanunderstandingofhowthebuildingperforms.
Alloftheinformationcollectedwasusedtobuildanenergysimulationmodeloftheexistingcondition.
Trace700energysimulationsoftwarewasusedtoperformthisanalysis.Thebuildingisreconstructed
fromthegroundupusingtheinsulationvaluesofthebuildingswalls,floors,roofandwindowsaswellall
furnaces,condensingunits,andlighting.Equipmenttemperaturesetpoints,setbackandoperation
schedulesaresetinTracetomatchthesameconditionsthatwererecordedfromtheinterview.The
buildingissimulatedforanentireyearusingpastweatherdataforColumbus,Ohio.
CostanalysisisanimportantpartoftheenergysimulationforthesuggestedEnergyConservation
Measures(ECM)presentedinthereport.FindingcostsofspecificECMsincludesreachingouttocompany
representativesforequipmentcost,usingCostWorksPricingSoftware,orreachingouttocontractorsfor
fullalternativepricing.ThecostisthenenteredintotheTracesoftwareandusingSt.Albanscurrentutility
rate,KLHisabletofindsimplepaybackfortheEnergyConservationMeasures.
Facility Description
BuildingDescription
Thefacilityhastwobuildingsonsite,locatedat333S.DrexelAve.inBexley,Ohio.Thetotalfloorareaof
bothbuildingsisapproximately13,812squarefeet.Themainlivingroomofthebuildingwasconstructed
in1926andmultipleareaswereaddedtothebuilding,thelatestin1974.Thebuildingisprimarilyusedas
aworshipandmeetingspace.Thesecondbuildingisatwostorybuildingthatwasconstructedin1954.
Classroomsareonthelowerlevelandaparishhallandkitchenareontheupperlevel.
BuildingOccupancy
Themainbuildingisusedyearroundduringtheweekformeetingsandofficework.OnSundaysthemain
buildingincludingsanctuaryisusedfrom7:00AMthrough4:00PMwith45minuteservicesonMonday
andWednesdaymornings.Theclassroomsonthelowerlevelofthesecondbuildingareusedverylightly
duringtheweekfromAugusttoMay.Theyarealsousedfor2hoursonSundaysandoneeveningmeeting
St.AlbansEnergyAssessmentreport Page4of18
perweekfor1hour.Theparishhallisusedforoccasionalmeals,exerciseclasses4morningsaweek,and
meetingsfor2hours3timesaweek.
Heating,Ventilation,andAirConditioning(HVAC)System,andControls
CurrentlytheHVACsystematSt.Albansiscomprisedof8furnacesand7outdoorcondensingunits.
Theseunitsaremostlynewunits,5yearsoldorless.Thefurnacesservingthemainbuildingwereinstalled
in2011andtheunitsservingtheparishhallandfoyerwereinstalledin2009.Theunitsservingthelower
levelofthesecondbuildingaretheoldestoftheHVACequipmentandare24yearsold.Thereisone
programmablethermostatinthebuildingthatservesthesanctuary,therestofthesystemsarecontrolled
througharegularthermostat.Spacesotherthanthesanctuarydonothavetemperaturesetbackandare
consistentlysetbetween7274degrees.Sanctuarycoolingissetat74Fwhiletheheatingtemperatureset
pointis68F.Temperaturesetbackinthesanctuaryisusedduringunoccupiedhours.
Duringonesitevisit,KLHperformedcombustiontestingofthefurnaceequipment.Thereadingswere
usedtocalculatethecombustionefficiencyofthefurnaces.AppendixBshowsthereadingsfoundduring
combustiontesting.ThisdatawasenteredintoTraceinordertomodelthemechanicalequipment
accurately.
Lighting
Themajorityofthecurrentlightingsysteminbothbuildingsis32Watt,2lampT12lightingfixtures.There
aresomelocationswithchandeliersorscrewin60Wattlamps.Thesanctuarylightinghastwelve250
Wattspotlights,plusadditionalfifteen65Wattfixtures.Allspacescontainmanuallightswitches.There
arenooccupancysensorscurrentlyinthebuilding.
St.AlbansEpiscopalChurchEnergyAssessmentreport Page5of18
Thispageprovidessomebasicinformationregardingyourbuilding'senergyusage,andalsoshowshowthatusage
comparestootherbuildingsofsimilartype,size,andlocation.ThecomparisoniscompletedthroughENERGY
STARandtheDepartmentofEnergy'sCommercialBuildingsEnergyConsumptionSurveydatabase(CBECS).
EnergyUsageIndex(kBtu/ftperyear)
EnergyUseIndexistheamountofenergyused
persquarefootofspaceinthebuilding.The
43 59 higherthenumber,themoreenergyusedbythe
building.Thisvalueisusedtocomparethe
37 66
energyconsumptionoftheSt.Albanstosimilar
sizeandoccupancytypebuildings.TheEnergy
UsageIndexisbasedonEnergyStarCertified
0 20 40 60 80 building,whiletheMedianEnergyUsageIndexis
St.Albans EnergyStar Median Proposed
foranaveragebuilding.ImplementingtheECMs
suggestedinthisreportwouldlowerthebuilding
EUIto37kBtu/ft2peryear.
AnnualCostComparison($/ft)
The Annual Cost Comparison graph shows
your facilitys cost per square foot for gas$1.00
AnnualCostComparison($/ft)
and electricity as indicated by utility bills
$0.80 $0.64 $0.68
overthelastyear.Forcomparison,thechart
$0.60 $0.49
displays peer buildings at the 50th (industry
$0.41
average) and the 75th (energyefficient $0.40
building) percentiles. Implementing the $0.20
ECMs suggested in this report would lower $
thebuildingEUIto$0.41/ft2. St.Alban's
Median
EnergyStar
Proposed
EnergyUseBreakdown(kBtu)
TheEnergyUseBreakdowngraphshowsthe
EnergyUsage(kBtu)
estimatedenergyusebreakdownbysystem
9% type.Thesefindingsweredevelopedbased
5% Heating
2%
6% Cooling ontheresultsofacomputersimulated
versionoftheexistingbuildingconditions.
Fans
Thischartcanbeusedtovisualizewhich
Lighting
systemsusethemajorityofthebuildings
78%
HotWater energy.
St.AlbansEpiscopalChurchEnergyAssessmentreport Page6of18
TheENERGYSTAREnergyPerformanceRatingisacommonwaytobenchmarkabuildingagainstpeerbuildings.
Othermetricsincludedonthispagearethecarbonfootprintofthebuilding(usingEPA'sutilityemissiondata),the
estimatedenergyreductionoftherecommendedenergyconservationmeasures,andtheequivalentcarbon
footprintreduction.
TheENERGYSTAREnergyPerformanceRatingforyourbuilding
EstimatedENERGYSTARRating istheestimatedpercentilerankingona0100scaleusingthe
DepartmentofEnergy'sCommercialBuildingsEnergy
50 75 ConsumptionSurveydatabase(CBECS).ToqualifyforENERGY
58 84 STARcertification,yourbuildingmusthavearatingof75or
greater.St.AlbansdoesnotqualifyforENERGYSTAR
Certificationduetoenergyuse.Installinglightingupgrades,new
0 20 40 60 80 100 HVACequipmentandimplementingHVACsetback
temperatureswillgiveSt.AlbansanENERGYSTARRatingof
St.Albans EnergyStar Median Proposed
84.
CarbonEmissionsBenchmark
Thecarbonfootprintofabuildingmeasures
100
CarbonEmissions(tonsCO2)
thebuilding'simpactontheenvironment 81
throughitsgreenhousegasemissions.This 80 71
chartshowsyourbuilding'scurrentcarbon 60 51.5
footprintandthepotentialreduction 46
40
associatedwithourrecommendations.It
alsoshowshowyourbuildingcomparesto 20
anEnergyStarcertifiedbuildingandan 0
averagebuilding. St.Alban's Median
EnergyStar
Proposed
St.AlbansEpiscopalChurchEnergyAssessmentreport Page7of18
MonthlyElectricityandGasConsumptionandCost
8.0K $1,200
7.0K
$1,000
ElectricConsumption(kWh)
6.0K
$800
ElectricCost($)
5.0K
4.0K $600
3.0K
$400
2.0K
$200
1.0K
0 $
1/1
2/1
3/1
4/1
5/1
6/1
7/1
8/1
9/1
10/1
11/1
12/1
Month
BuildingConsumption kWhCost
1.60K $1,400
1.40K $1,200
GasConsumption(ccf)
1.20K
$1,000
1.0K
GasCost($)
$800
800
$600
600
$400
400
200 $200
0 $
1/1
2/1
3/1
4/1
5/1
6/1
7/1
8/1
9/1
10/1
11/1
12/1
Month
GasConsumption GasCost
ThebargraphsabovepresentSt.Albanstotalelectricandgasconsumptionthroughouttheyearof2013.Theline
graphrepresentstheelectricandgasconsumptioncosts.
St.AlbansEpiscopalChurchEnergyAssessmentreport Page8of18
AfterevaluatingSt.Albansactualperformanceweproposethefollowingactionstolowerenergyuseandcosts:
1. FurnaceReplacement
ExistingConditions
CurrentlySt.Albansbuildingsareservedby8furnaces.Thefurnacesservingtheparishhallandfoyer
(2009)andmainbuilding(2011)andareingoodworkingorder.Theremaining2unitswereinstalled
over24yearsagoandarerecommendedforreplacement.Thereplacementoftheseunitscanbe
doneinphases,withthefurnacessuggestedtobereplacedfirst.
Recommendation
Replacethetwinfurnaceunitservingthelowerleveloftheeducationbuildingwithhigh
efficiencyunits(98%efficiency).
EvaluationFurnaces
EstimatedCost:$3,480
PotentialAnnualEnergySaved:
o Gas:330Therms
PotentialEnergyCostSaved:$400
SimplePayback:9Years
2. CondensingUnitReplacement
ExistingConditions
Thereare7outdoorunitsthatworkinpartnershipwiththeindoorfurnaces.Thecondensingunits
servethesamespacesandarethesameage.Theunitsservingtheparishhallandfoyer(2009)and
mainbuilding(2011)andareingoodworkingorder.Theremaining2unitswereinstalledover24
yearsagoandarerecommendedforreplacement.
Recommendation
Replacethematchingoutdoorunitsservingthelowerleveloftheeducationbuilding.
EvaluationCondensingUnits
EstimatedCost:$6,840
PotentialAnnualEnergySaved:
o Electricity:828kWh
PotentialEnergyCostSaved:$300
SimplePayback:22Years
St.AlbansEpiscopalChurchEnergyAssessmentreport Page10of18
3. LightingUpgrades
ExistingConditions
Thebuildingcurrentlyutilizesamixofdifferentlightfixtures.Themainlightsourceinthesecondary
buildingis(27)twolampfixtureswiththeexceptionoftheparishhallkitchenwhichhas(2)fourlamp
fixtures.EachlampisT1232Watts.TheofficesinthemainbuildinghaveT124lampfixturesthat
havebeenreducedto2lampfixturespriortotheenergyaudit.Thesanctuarylightismadeupof(12)
250Watthalogenspotlightsand(15)65Wattfixtures.Dimmersareusedinthesanctuary,livingand
diningrooms.
Recommendation
ReplaceallT12lampsinthebuildingwith28WattT8lamps,includingreplacingcurrentballastswith
electronicballasts.Removelampsfromfixtureswherefeasiblewhilestillmaintainalightlevelofthe
userspreference.ChandelierlightinginthelivinganddiningroomscanbeupgradedtoLEDlamps.The
costestimatedprovidedhereisbasedonthelaborbeingdonebyanappropriatevolunteer.Labor
costscanbebetween$1,500$2,200ifacontractorishiredtodothework.ThecurrentAEPincentive
forT12replacementtoT8is$0.30/perwattreduced.
Evaluation
EstimatedCost:$1,700
PotentialAEPRebate:$510
PotentialAnnualEnergySaved:2,500kWh
PotentialEnergyCostSaved:$400
SimplePayback:3years
4. Windowglazingandstormwindowreplacement
ExistingConditions
ThewindowsinSt.Albansareinvaryingconditions.AccordingtothestaffatSt.Albansthewindows
inthemainbuildinghavebeenpartiallyreglazedandthewindowsinthesecondarybuildingneed
glazing.Manyofthewindowsarenotingoodconditionandareshowingsignsofwoodrot.
Reglazingisapositivebuttemporaryfixtoincreasetheinsulationvaluesofthewindows.
Recommendation
Allwindowsshouldeventuallybereplacedwithdoublepaneglazedfixedwindows.Howeverthecost
oftotalwindowreplacementishighconsideringdemolition,reframing,andthematerialandlabor
cost.Replacementshouldbephased,andthebestopportunityinthissituationwouldbetousethe
savingsfromthermostatsandlightingreplacementtohelpoffsetthecostoftotalwindow
replacement.Astormwindowcostsbetween$100$125perwindow,andwhilethisincreasesthe
insulationvalueofthewindow,itdoesnotsolvetheproblemofwoodrot.
5. Mainbuildingatticinsulation
ExistingConditions
TheexistingbuildingwasmodeledwitharoofRvalueofR12tomatchatypicalconstructionofa
similaragedbuilding.ThesamemodelwaswithanR30valueinthemainbuildingattic.Assuminga
St.AlbansEpiscopalChurchEnergyAssessmentreport Page11of18
volunteerinstallstheR30insulationinthechurchattic,theinitialcostoftheinsulationwouldbehigh
comparedtotheannualenergysavings,resultinginalongpaybackperiod.
Evaluation
EstimatedCost:$4,000
PotentialAnnualEnergySaved:
o Electricity:375kW
o Gas:266Therms
PotentialEnergyCostSaved:$400
SimplePayback:10years
St.AlbansEpiscopalChurchEnergyAssessmentreport Page12of18
APPENDICES
St.AlbansEpiscopalChurchEnergyAssessmentreport Page13of18
TOTAL $3,480
CondensingUnitReplacement
Description Quantity Unit UnitMaterial UnitInstallation UnitTotal
TOTAL $6,840
LightingUpgrades
Unit
Description Quantity Unit UnitMaterial UnitTotal
Installation
Subtotal $1,538.00
TOTAL $1,692.00
St.AlbansEpiscopalChurchEnergyAssessmentreport Page14of18
HVACsetback
Unit
Description Quantity Unit UnitMaterial UnitTotal
Installation
Wi-Fi 7 Day
Programmable Thermostats 4 Ea. $230.00 $0.00 $920.00
Honeywell Wi-Fi 9000
Contingency (10%) 1 Sum $92.00
TOTAL $1,012.00
AtticInsulation
Unit
Description Quantity Unit UnitMaterial UnitTotal
Installation
TOTAL $4,290.00
St.AlbansEpiscopalChurchEnergyAssessmentreport Page15of18
St.AlbansEpiscopalChurchEnergyAssessmentreport Page16of18
St.AlbansEpiscopalChurchEnergyAssessmentreport Page17of18
St.AlbansEpiscopalChurchEnergyAssessmentreport Page18of18