Professional Documents
Culture Documents
Brief Plinth Performance Feb 1st 2015
Brief Plinth Performance Feb 1st 2015
Summary: Background
1
Terms of Reference: Annual Review 2015
The Chars Livelihoods Programme-Phase 2
The DEMOs visited CPHHs from cohorts CLP
1, 2.1, 2.2 and 2.3 across nine districts. They
attempted to trace 662 CPHHs, of which 6464
were available for interviewed and whose
responses are reflected in this brief.
Methodology
In January 2015, eight Data Entry & As seen in Figure 1, 80% of respondents are
Monitoring Officers (DEMOs) from the still living on the plinth provided by CLP. Of
Innovation, Monitoring, Learning and those still living on the plinth, the average
Communications (IMLC) Division visited a amount of time spent on the plinth is 6 years.
randomly-selected sample of CPHHs who
received a raised plinth to determine whether The results show that a high proportion (73%)
they were still residing on the plinth. of CLPs earliest cohorts are still living on the
plinth provided by the Programme.
Page 2 of 4
A 20105 survey among CLP 1 CPHHs, found Figure 2: Number of times surveyed
the plinth occupancy rate to be 74%. CPHHs experienced flooding of their
homes
Figure 1: % of surveyed CPHHs still living 5
4.46 4.37
on CLP-raised plinth 4.5 4.09
100 96.3 4 3.54
90 3.5
79.2 80.2
80 3
72.7
69.7 2.5
70
2
60
1.5
50 1
40 0.5 0.12 0.04 0.05 0.01
30 0
CLP 1 2.1 2.2 2.3
20
10 Before CLP After CLP
0
CLP 1 2.1 2.2 2.3 Total
Erosion Rate of CPHHs living on a
raised plinth
Of those who no longer live on the plinth, the
average time spent living on the plinth Figure 3 shows the proportion of plinth
provided by CLP was 2.5 years. erosions by cohort. The average percentage
of erosions amongst all cohorts surveyed is
The reasons for non-occupancy were: 15%.
Loss of plinth due to river erosion: 75% Results show that just 17% of CLP 1 CPHHs
Eviction by land owner: 15% (i.e. those who received their plinth between 4
Migration6/Other: 10% and 10 years ago) have experienced erosion
of their CLP plinth.
Figure 2 shows the number of times the
interviewed CPHHs experienced flooding of Another survey7 carried out in 2010 found
their homesteads before and after CLP fewer than 3% of CPHHs from CLP 1 were
support. Over 97% of CPHHs experienced eroded on an annual basis .
flooding before CLP, with flooding having
occurred an average of 4 times over the past This shows that the vast majority of CLP
ten years. plinths remain intact over time and continue to
protect households years after being
Less than 4% of CPHHs experienced flooding constructed.
after having received CLP support, with the
average number of times flooding occurred
being 0.06 times.
5 Kenward, S., and Islam, R. (2011) Brief: A study 7 Kenward, S., and Islam, R. (2011) Brief: A study
to assess the lifespan and occupancy status of to assess the lifespan and occupancy status of
CLP raised plinths CLP raised plinths
6 DEMOs were able to interview some of those who
Page 3 of 4
Figure 3: % of surveyed CPHHs whose % %
plinth has been eroded experiencing experiencing
problem problem
100 before CLP after CLP
Support Support
90
Had 29 3
80
livestock
70 stolen/lost
60 Had to 76 1
50 sleep on
40 the roof/
27.6 raised
30
17 Faced 97 1
20 14.4
problems
10 2.1 cooking
0 Faced lack 95 13
CLP 1 2.1 2.2 2.3 of potable
water
Frequency of problems associated Had to 92 4
rebuild/
with flooding repair the
house
The annual floods on the chars can erode
Had to stay 71 2
whole chars, forcing people to leave their
in
homes and relocate. Other families may
someone
remain in their houses, either living in the
elses
water or moving onto the roofs of their houses.
home
Without access to an improved water source
Had a 95 65
and adequate sanitation, these families are at
reduction
greater risk of disease. Loss of assets and
in income
livestock and the inability to work also
characterise the problems experienced during
times of flooding. Participant Satisfaction
Figure 4 illustrates how CLP participants bear All CPHHs (including those who experienced
the effects of some common problems erosion) were asked about their level of
associated with flooding before and after satisfaction with their CLP-raised plinth. The
support. vast majority (86%) of CPHHs described
themselves as being very satisfied with their
After moving to a CLP-raised plinth, much plinth, 10% as satisfied, 3% as satisfied a
fewer CPHHs report having to move house, little with just 1% reporting dissatisfaction.
needing to rebuild/repair their house, losing
livestock or encountering problems with Even some of those experiencing
cooking and finding safe drinking water. erosion/flooding gave positive feedback, as
they felt the plinth had been beneficial for
Figure 4: Effects of flooding before and some time.
after CLP support for all CPHHs surveyed
This brief was prepared in January 2015.
Page 4 of 4