Professional Documents
Culture Documents
To District Environment Engineer
To District Environment Engineer
2016
To
Respected Sir,
With reference to the above subject we are already inform that incinerator
chimney repair work period 29.07.16 to 02.08.16 on 29.07.16 but we cant able to
do the repair work within the time period. So we are extended this work up to
07.08.2016. In the shutdown period we have to send the waste to our Salem plant.
This is for kind information.
Thanking you
Authorized Signatory