Proposed Construction of western Road-- work Schedule

ProjectManagementInterface
CASHES
QA/QC
Awardof Contract
PremobilizationActivities1
KickoffMeeting
SiteVisit
PreMobilisationInspectionof Equipment/supportfacilities
PremobilizationActivities2
FTOFreedomtoOperate
introductiontocommunities/Site
HandovertoHostcommunities
FMESSitevisit/Sortingout approved borrow pits
Arrangement of accomodation and facilities

Preliminary survey: Traverse Survey, Temporary Bench Mark Survey,


and Centre Line Setting out, Centre Line marking, Cross Section
Survey and Submittal of Drawings.
Mobilization
Mobilize all equipment, plants, personnel to site
Site clearing and grubbing
Construction
Earthwork / Subgade Preparation
Culvert and Drainage construction
Soil- Cement Stabilization
Construction of sub base/ Placement and compaction of approved
crushed stone materials
Asphalt paving
Shoulder surface dressing
Embankment and Slope Protection construction
Road Marking and Sign Installation
Demobilization
site cleanup/ House Keeping
Hand over project
DemobilzeallEquipment/Personnel