Maintenance work carried out:

- Main engine overhaull: Changing piston rings, changing o-rings of stuffing


box, replacing all the gaskets, cleaning the surface of cylinder cover and
cylinder liner.
- Starting Air Valve changing and reconditioning
- Fuel pump shock absorber, replacing and reconditioning
- Purifier maintenance which included the cleaning of the disk stack, changing
the gaskets, replacing spindle bearings, replacing clutch shoes.
- Fresh water generator maintenance: Tubes cleaning, replacing gaskets.
- Diesel Generator: centrifugal filter and oil filter cleaning, measurement of
valve clearance and adjustment, replacing fuel injectors, replacing two
cylinder liners, taking pressure measurements.
- Boiler: tubes cleaning, several cracked water tubes pluged, changing the
refractory material
- Performance test of diesel generator engine and main engine
- Fuel analyzes, lub oil analyzes, water analyzes.
- Soundings
- Turbocharger cleaning
- Main engine crankshaft deflection
- Air compressor: changing oil, cleaning air cooler
- Weekly/Daily routines: Cleaning of filters, draining water from fuel tanks, etc.
- Operation during manoeuvres (Engine Turning, Engine Blowing,
Starting/Stopping AEs, Adjustment of various parameters)
- Puncture valve overhaul
- AC overhaul
- Replacement of various pipes
- Pumps(screw) overhaul