Professional Documents
Culture Documents
Risk Assesment Instalation Crane Column
Risk Assesment Instalation Crane Column
Risk Assesment Instalation Crane Column
1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.
Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.
1. Preparatory Works
o Removal of scrap Sharp edges of the steel scrap Cut injury to limbs and M M M Ensure adequate hand protection is Supervisor L
material/ loose, materials material, body. provided and used during scrap
and equipments in the Heavy strenuous physical Back Injury handling.
vicinity of the lifting activity Impact Injury Avoid bending the back.
operation and final Falling material Use Kinetic method of lifting by
storage area bending knees and keep the
straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING
1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.
Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.
o Lifting of the Crane Failure of slings and shackles Major Injury/ Fatality to H L H Slings shall be as per the lifting Supervisor L
Column the people working sequence as specified in the
around and or damage procedure. And shackles shall be
to the material. tested with MPI before lifting.
Permit to work to be applied and
issued before the work and lifting
Plan to be followed. Specific Tool
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING
1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.
Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.
1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.
Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.
Swinging Crane/ load hits Major Injury/ Fatality to H L H Swing area of the crane to be kept Supervisor L
personnel or equipment the rigger clear of any person and objects like
pressurized cylinders
Uncontrolled load Impact injury H L H Tag lines of one inch diameter to be Rigging L
tied to the load to control the Supervisor
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING
1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.
Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.
movement.
o Movement of the crane Crane may topple or fall along Major Injury/ Fatality to H L H Lifting area and the area of crane Rigging L
with Crane Column to with load during movement to the people working movement to be provided with Supervisor
Trailer Truck the final storage area. Crane around and or damage warning signs and barricading to be
may hit objects in the way to the material. done to prevent unauthorized
people. Crane movement to slow to
accommodate the loads swinging.
Area of movement of crane must be
clear of any object.
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING
1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.
Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.
o Putting down the Crane Load may fall Major Injury/ Fatality to H L H Supports to be placed as per the Rigging L
Column on the trailer the people working calculation. Supervisor to ensure Supervisor
truck around and or damage with along with Rigging foreman and
of material that placement of the supports is Supervisor
even and arrangement is safe
1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.
Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.
1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.
Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.