RISK ASSESSMENT FORM

PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 1 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

1. Work preparation

Area to be Clean and free by Slippery hazards, material Personal injury M M M Personnel must wear PPE like Supervisor L
obstruction. falling Hand protection, safety helmet,
safety shoes, safety glasses,
Face shield, Etc
All the equipment inspected.
Use the right tools for the right
job.

Overall Risk: Low


RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 2 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

Wear safety helmet and shoes


to avoid injury due to falling
objects.
Proper access to work area to
be provided. If required
standard scaffolding platform
Walk way for Access Work Slip, trip and fall hazard Personal Injury H L H to be constructed. Supervisor L
People involved to the
preparation works must wear
all PPEs like Safety Helmet,
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 3 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

Safety Shoes and Safety


Glasses and take great care
from the material for slip and
trip hazard. Supervisor L
Specific Safety Tool Box Talk co
conduct before commencement
the job.

Overall Risk: Low


RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 4 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

Equipment failure Personal Injury M L M Personnel must Use the PPE Supervisor L
According to Standard Safety And
required. workers
Usage of Hand protection and
skilled workers

Pressure equipment failure Personal Injury H L H Pressure equipments like Supervisor L


Material Damage Compressor, pump and and HSE
associated hoses to be Officer
inspected for safety before
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 5 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

usage.
All hoses to be provided with
whip check to prevent hose
related impact injuries.
Only experienced and skilled
person to handle the pressure
equipments.
Pressure equipments to be
provided with pressure gauge
and safety valve to prevent
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 6 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

failure.
Activities area to be barricaded
Personal Injury H L H at time of air test operation. Supervisor L
No body should be in the
Barricaded area.
Only the standard equipment
to be used for this Activities.

2. during air test Activities. Pressure equipments Personal Injury H L H Pressure equipments like Supervisor L
Material Damage
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 7 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

failure Compressor, pump and


associated hoses to be
inspected for safety before
usage.
All hoses to be provided with
whip check to prevent hose
related impact injuries.
Only experienced and skilled
person to handle the pressure
Personal Injury, H M H equipments. Supervisor L
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 8 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

Material damage. Procedure of the air testing to /Eng/


be follow. workers
Ensure relevant PPE for eye,
body and hands protection are
used.
Air test arrangement must be
as per engineering /QC
procedure.
Test pressure to be checked

Overall Risk: Low


RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 9 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

with the Valve rating and


maximum capacity and it
durability according to the
manufacture recommendation.
Pressure gauges to be used for
monitoring the pressure must
be having valid calibration.
Pressure gauges to be installed
Personal Injury H L H to Control the pressure. Supervisor L
Hit objects. Make sure the testing
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 10 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

equipment is under control.


Area under pressure to be
barricaded and warning sign to
be provided.
Ensure that no body crossing
the Safety line or barricade
except the assign personnel on
duty.
Flooding Leak testing
procedure to be follow.
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 11 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

3. Stages of pressure activities Pressure equipments Personal Injury H L H Pressure to be inspected for Supervisor L
failure. (Impact, piercing and safety before Continuing the
bruises) activities.
Material Damage Make sure the leak test
pressure shall be 22 PSI for
Duration 6 Hours.
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 12 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

4. Next stage of leak test Pressure equipment Personal Injury, M L M Technique of Flooding and leak Supervisor L
progress failure. Material damage. testing to be follow
Usage of Hand protection and
skilled workmen.
Always wear the PPE properly
Overall Risk: Low
RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 13 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

during the checking of


pressure, to continue the
flooding and leak activities.
5. Re- inspection the Pressure Equipment failure Personal Injury H L H Make sure all the personnel Supervisor L
required. involved to this activities is
always wearing the PPE
properly
Usage of Hand protection and
skilled workmen

Overall Risk: Low


RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 14 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

Make sure the required


pressure is been fix with the
procedure.
All bolt tightening Tools must
have valid calibration.
6. Finishing the Flooding and Flooding and leak Personal Injury H L H Ensure the pressure bar is Supervisor L
leak test. Equipment failure. only allowed kept inside.
Store the Flooding and leak test
equipment properly, and re-

Overall Risk: Low


RISK ASSESSMENT FORM
PT. EXPERT ENGINEERING

JOB: Air Test Piping

DATE 08/03/2017 Sheet 15 of 5 SYSTEM NO.


INSTALLATION / SITE: NPLB-S379 -Piping fabrication REF.: Rev: Status:
HAZARD EFFECT X PROBABILITY = RISK MINIMISE RISK BY
NOTES
TASK HAZARD EFFECT RESIDUAL
HAZARD 1. REDUCE PROBABILITY
DESCRIPTION DESCRIP HE P R ACTION BY RISK
2. REDUCE HAZARD EFFECT
TION 3. IDENTIFY MONITORING

1. Preparatory Works Sharp edges of the steel scrap Cut injury to limbs and Ensure adequate hand protection is Individual
o Removal of scrap material, body. provided and used during scrap
material/ loose Heavy strenuous physical L M M handling. L
,materials and activity Back Injury Avoid bending the back.
equipments in the Falling material Impact Injury Use Kinetic method of lifting by
vicinity of the lifting bending knees and keep the
operation straight back at time of lifting the
materials and objects by bending
knees and keep the straight back at
time of lifting the materials and
objects.
Wear safety helmet and shoes to
avoid injury due to falling objects.

Squeeze in hazard while sling Limb injury L M M Skilled/ trained and experienced Supervisor L
o Installation of guy wires handling riggers to be deployed for the guy
on the panel frame. wire installation work under
supervision.
Hand protection is be used.

check the damaged defend


after usage.

Overall Risk: Low