SECOND FLOOR

Dead Load Live Load

Unit Load Unit Load


Frame Length Load Frame
(kN/m) (kN/m)

1 22.31 5 111.55 1 5.29


1' 22.31 5 111.55 1' 5.29
2 17.61 25 440.23 2 32.55
3 17.23 25 430.64 3 43.93
4 20.64 20 412.87 4 29.47
5 18.98 20 379.66 5 25.19
6 20.64 20 412.87 6 29.47
7 17.23 25 430.64 7 43.93
8 17.61 25 440.23 8 32.55
9 22.31 5 111.55 9 5.29
9' 22.31 5 111.55 9' 5.29
A 17.60 40 704.06 A 42.32
B 17.56 40 702.27 B 45.34
C 17.56 40 702.27 C 45.34
D 19.20 40 768.01 D 64.49
E 16.32 30 489.49 E 43.67
F 21.92 10 219.23 F 10.58
F' 21.92 10 219.23 F' 10.58
TOTAL
TOTAL 7197.88

Wt = Total DL + 25% LL

Wt = 7197.8799488 + 3758.43
Wt = 10956.30 kN
ROOF
DEAD LOAD

UNITWEIGHT THICKNESS AREA Weight


TYPE kN/cu.m. meters meters kN
Slab 23.54 0.15 650 4590.300

TOTAL 4590.300

LIVE LOAD
FROM NSCP

kPa AREA Weight


sq.m. kN
1 650 650

Wt = Total DL + 25% LL
Wt = 4590.300 + 162.5
Wt = 4752.80 kN

SUMMARY

Wt 1 = 4785.30 kN
Wt 2 = 10956.30 kN
Wt Rf= 4752.80 kN

Total Wt = 20494.40 kN
GROUND FLOOR
DEAD LOAD
COLUMN = Unit wt. of concrete x b x h x 0.5L x no. of pieces
COLUMN = 23.54 x 0.3 x 0.3 x 1.5 x

Length Load
SLAB = Unit wt. x t x A
SLAB = 23.54 x 0.15 x 650
5 26.45
5 26.45 WALL = Unit wt. x S x 0.5L
25 813.75 WALL= 3.45 x 305.9 x 1.5
25 1098.25
20 589.40 LIVE LOAD = Factored Load x Area
20 503.80 LIVE LOAD = F 4.8 x 650
20 589.40 Wt = Total DL + 25% LL
25 1098.25 4005.30 + 780
25 813.75 Wt = 4785.30 kN
5 26.45
5 26.45
40 1692.80
40 1813.60
40 1813.60
40 2579.60
30 1310.10
10 105.80
10 105.80
15033.70
40 = 127.12 kN

= 2295.15 kN

= 1583.03 kN
4005.30 kN

= 3120.00
Occupancy Category: Standard Occupancy Category(Category IV)
I: 1.0
R: 8.5 (SMRF) Sec. 208.5.2.2
Z= 0.4 (Zone 4)
T =Ct(hn)^(3/4) Ct = 0.0731 for RC
hn 19.65
T= 0.6822
Cv 0.56Nv Nv = 1.6
Cv 0.896
Ca 0.4(Na) Na = 1.2
Ca 0.48

Vd =

Vd 3166.54 kN

Vdmax =

Vdmax 2893.33 kN

Vdmin = 0.11CaIWt

Vdmin 1082.10 kN

Vdmin =
Vdmin 1234.486 kN

Vd > Vdmin ok!


Vd > Vdmax

Use Vd 2893.33 kN
VERTICAL DISTRIBUTION OF BASE SHEAR AT FLOOR LEVEL

FLOOR HEIGHT STORY WT. Wx(hx) (kN


LEVEL hx(m) Wx(Kn) - m)
Roof 19.65 4752.8 93392.52
2nd Floor 4.2 10956.30 46016.48
= 139409.00

Frf 1938.29 kN
F2 955.04 kN

V2 1938.29 kN
V1 2893.33 kN
Use Vdmax
NORTH - SOUTH DIRECTION

LINE PIER b(mm) d(mm) h(mm) A = mm^2 I = (bd^3)/12 = (3.35h^3)/I +


120.724h/A

A A-8
A-9
300
300
300
300
3000
3000
90000
90000
675000000
675000000
46.423
46.423
=
B-1 300 300 3000 90000 675000000 46.423
B-2 300 300 3000 90000 675000000 46.423
B-3 300 300 3000 90000 675000000 46.423
B-4 300 300 3000 90000 675000000 46.423
B B-5
B-6
300
300
300
300
3000
3000
90000
90000
675000000
675000000
46.423
46.423
B-7 300 300 3000 90000 675000000 46.423
B-8 300 300 3000 90000 675000000 46.423
B-9 300 300 3000 90000 675000000 46.423
=
C-1 300 300 3000 90000 675000000 46.423
C-2 300 300 3000 90000 675000000 46.423
C-3 300 300 3000 90000 675000000 46.423
C-4 300 300 3000 90000 675000000 46.423
C C-5
C-6
300
300
300
300
3000
3000
90000
90000
675000000
675000000
46.423
46.423
C-7 300 300 3000 90000 675000000 46.423
C-8 300 300 3000 90000 675000000 46.423
C-9 300 300 3000 90000 675000000 46.423
=
D-1 300 300 3000 90000 675000000 46.423
D-2 300 300 3000 90000 675000000 46.423
D-3 300 300 3000 90000 675000000 46.423
D-4 300 300 3000 90000 675000000 46.423
D D-5
D-6
300
300
300
300
3000
3000
90000
90000
675000000
675000000
46.423
46.423
D-7 300 300 3000 90000 675000000 46.423
D-8 300 300 3000 90000 675000000 46.423
D-9 300 300 3000 90000 675000000 46.423
=
E-1 300 300 3500 90000 675000000 72.023
E-2 300 300 3000 90000 675000000 46.423
E-3 300 300 3000 90000 675000000 46.423
E-4 300 300 3000 90000 675000000 46.423
E E-5
E-6
300
300
300
300
3000
3000
90000
90000
675000000
675000000
46.423
46.423
E-7 300 300 3000 90000 675000000 46.423
E-8 300 300 3000 90000 675000000 46.423
E-9 300 300 3000 90000 675000000 46.423
=
F F-1
F-2
400
400
400
400
3000
3000
160000
160000
2133333333
2133333333
44.663
44.663
=
EAST - WEST DIRECTION
= (3.35h^3)/I +
LINE PIER b(mm) d(mm) h(mm) A = mm^2 I = (bd^3)/12 120.724h/A

1-B 300 300 3000 90000 675000000 46.423


1-C 300 300 3000 90000 675000000 46.423
1 1-D
1-E
300
300
300
300
3000
3000
90000
90000
675000000
675000000
46.423
46.423
1-F 300 300 3000 90000 675000000 46.423
=
2-B 300 300 3000 90000 675000000 46.423
2-C 300 300 3000 90000 675000000 46.423
2 2-D 300 300 3000 90000 675000000 46.423
2-E 300 300 3000 90000 675000000 46.423
=
3-B 300 300 3000 90000 675000000 46.423

3 3-C
3-D
300
300
300
300
3000
3000
90000
90000
675000000
675000000
46.423
46.423
3-E 300 300 3000 90000 675000000 46.423
=
4-B 300 300 3000 90000 675000000 46.423

4 4-C
4-D
300
300
300
300
3000
3000
90000
90000
675000000
675000000
46.423
46.423
4-E 300 300 3000 90000 675000000 46.423
=
5-B 300 300 3000 90000 675000000 46.423

5 5-C
5-D
300
300
300
300
3000
3000
90000
90000
675000000
675000000
46.423
46.423
5-E 300 300 3000 90000 675000000 46.423
=
6-B 300 300 3000 90000 675000000 46.423

6 6-C
6-D
300
300
300
300
3000
3000
90000
90000
675000000
675000000
46.423
46.423
6-E 300 300 3000 90000 675000000 46.423
=
7-B 300 300 3000 90000 675000000.000 46.423

7 7-C
7-D
300
300
300
300
3000
3000
90000
90000
675000000.000
675000000.000
46.423
46.423
7-E 300 300 3000 90000 675000000.000 46.423
=
8-A 300 300 3000 90000 675000000.000 46.423
8-B 300 300 3000 90000 675000000.000 46.423
8 8-C
8-D
300
300
300
300
3000
3000
90000
90000
675000000.000
675000000.000
46.423
46.423
8-E 300 300 3000 90000 675000000.000 46.423
=
9-A 300 300 3000 90000 675000000.000 46.423
9-B 300 300 3000 90000 675000000.000 46.423
9 9-C
9-D
300
300
300
300
3000
3000
90000
90000
675000000.000
675000000.000
46.423
46.423
9-E 300 300 3000 90000 675000000.000 46.423
=
k = 1/ R.S.

0.0215 0.130
0.0215 0.130
0.0431
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.1939
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.1939
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.0215 0.130
0.1939
0.0139 0.101
0.0215 0.101
0.0215 0.101
0.0215 0.101
0.0215 0.101
0.0215 0.101
0.0215 0.101
0.0215 0.101
0.0215 0.101
0.1647
0.0224 0.087
0.0224 0.087
0.0448
k = 1/ R.S.

0.0215 0.045
0.0215 0.045
0.0215 0.045
0.0215 0.045
0.0215 0.045
0.0862
0.0215 0.045
0.0215 0.045
0.0215 0.045
0.0215 0.045
0.0862
0.0215 0.068
0.0215 0.068
0.0215 0.068
0.0215 0.068
0.0862
0.0215 0.148
0.0215 0.148
0.0215 0.148
0.0215 0.148
0.0862
0.0215 0.125
0.0215 0.125
0.0215 0.125
0.0215 0.125
0.0862
0.0215 0.125
0.0215 0.125
0.0215 0.125
0.0215 0.125
0.0862
0.0215 0.125
0.0215 0.125
0.0215 0.125
0.0215 0.125
0.0862
0.0215 0.125
0.0215 0.125
0.0215 0.125
0.0215 0.125
0.0215 0.125
0.1077
0.0215 0.057
0.0215 0.057
0.0215 0.057
0.0215 0.057
0.0215 0.057
0.1077
HORIZONTAL DISTRIBUTION OF STOREY SHEAR

FOR NORTH - SOUTH DIRECTION

ECCENTRICITY (2nd, 3rd, 4th FLOORS):


ey = Yrigidity -
ey = 14.74 -
ey = 0.77 m
SECOND FLOOR
LINE kx y kxy kxy^2 Px(kN)
A 0.0431 10.23 0.441 4.51 1938.29
B 0.1939 5.23 1.014 5.30 1938.29
C 0.1939 0.23 0.045 0.01 1938.29
D 0.1939 -4.74 -0.919 4.36 1938.29
E 0.1647 -9.74 -1.604 15.62 1938.29
F 0.0448 -14.74 -0.660 9.73 1938.29
= 0.8341 Jr = 39.53

ECCENTRICITY (GROUND FLOOR):


ey = Yrigidity -
ey = 14.9 -
ey = 1.62 m

GROUND FLOOR
LINE kx y kxy kxy^2 Px(kN)
A 0.0431 10.1 0.435 4.39 2893.33
B 0.1939 5.1 0.989 5.04 2893.33
C 0.1939 0.1 0.019 0.00 2893.33
D 0.1939 -4.9 -0.950 4.65 2893.33
E 0.1647 -9.9 -1.630 16.14 2893.33
F 0.0448 -14.9 -0.667 9.94 2893.33
= 0.8341 Jr = 40.18
VERTICAL DISTRIBUTION OF STOREY SHEAR

FOR EAST - WEST DIRECTION


ECCENTRICITY (2nd FLOOR):
ex = xrigidity -
ex = 20.00 -
ex = 0.00 m
SECOND FLOOR
LINE kx y kxy kxy^2 Px(kN)
1 0.0862 -20 -1.723 34.47 1938.29
2 0.0862 -15 -1.292 19.39 1938.29
3 0.0862 -10 -0.862 8.62 1938.29
4 0.0862 -5 -0.431 2.15 1938.29
5 0.0862 0 0.000 0.00 1938.29
6 0.0862 5 0.431 2.15 1938.29
7 0.0862 10 0.862 8.62 1938.29
8 0.1077 15 1.616 24.23 1938.29
9 0.1077 20 2.154 43.08 1938.29
= 0.7109 Jr = 99.63
ECCENTRICITY (GROUND FLOOR):
ex = xrigidity -
ex = 20.00 -
ex = 0m

GROUND FLOOR
LINE kx y kxy kxy^2 Px(kN)
1 0.0862 -20 -1.723 34.47 2893.33
2 0.0862 -15 -1.292 19.39 2893.33
3 0.0862 -10 -0.862 8.62 2893.33
4 0.0862 -5 -0.431 2.15 2893.33
5 0.0862 0 0.000 0.00 2893.33
6 0.0862 5 0.431 2.15 2893.33
7 0.0862 10 0.862 8.62 2893.33
8 0.1077 15 1.616 24.23 2893.33
9 0.1077 20 2.154 43.08 2893.33
= 0.7109 Jr = 99.63
REY SHEAR

Ymass

13.97

e Vx
0.77 116.7500475226
0.77 488.7758265544
0.77 452.1764392572
0.77 415.7966482837
0.77 322.0885113518
0.77 79.1339426538

Ymass

13.28

e Vx
1.62 200.2015139872
1.62 787.8144718188
1.62 674.722130695
1.62 561.6297895712
1.62 380.9857663004
1.62 77.4817823607
EY SHEAR

xmass
20.00

e Vx
0 234.9443107195
0 234.9443107195
0 234.9443107195
0 234.9443107195
0 234.9443107195
0 234.9443107195
0 234.9443107195
0 293.6803883994
0 293.6803883994

xmass
20.00

e Vx
0 350.7063691773
0 350.7063691773
0 350.7063691773
0 350.7063691773
0 350.7063691773
0 350.7063691773
0 350.7063691773
0 438.3829614717
0 438.3829614717
NORTH-SOUTH DIRECTION

GROUND
LINE PIER 2nd FLOOR LINE PIER
FLOOR

A A-8
A-9
22.24
22.24
12.97
12.97
D-1
D-2
D-3
B-1 87.53 54.31 D-4
B-2
B-3
87.53
87.53
54.31
54.31
D D-5
D-6
B-4 87.53 54.31 D-7
B B-5
B-6
87.53
87.53
54.31
54.31
D-8
D-9
B-7 87.53 54.31
B-8 87.53 54.31 E-1
B-9 87.53 54.31 E-2
E-3
C-1 74.97 50.24 E-4
C-2
C-3
74.97
74.97
50.24
50.24
E E-5
E-6
C-4 74.97 50.24 E-7
C C-5
C-6
74.97
74.97
50.24
50.24
E-8
E-9
C-7 74.97 50.24
C-8
C-9
74.97
74.97
50.24
50.24 F F-1
F-2
EAST-WEST DIRECTION
GROUND
GROUND LINE PIER
2nd FLOOR FLOOR 2nd FLOOR
FLOOR
62.40 46.20 1-B 87.68 58.74
62.40 46.20 1-C 87.68 58.74
62.40
62.40
46.20
46.20
1 1-D
1-E
87.68
87.68
58.74
58.74
62.40 46.20 1-F 87.68 58.74
62.40 46.20
62.40 46.20 2-B 87.68 58.74
62.40 46.20 2-C 87.68 58.74
62.40 46.20 2 2-D
2-E
87.68
87.68
58.74
58.74
54.43 46.01 2-F 87.68 58.74
54.43 46.01
54.43 46.01 3-B 58.45 39.16
54.43
54.43
46.01
46.01 3 3-C
3-D
58.45
58.45
39.16
39.16
54.43 46.01 3-E 58.45 39.16
54.43 46.01
54.43 46.01 4-B 58.45 39.16
54.43 46.01
4 4-C
4-D
58.45
58.45
39.16
39.16
12.91 13.19 4-E 58.45 39.16
12.91 13.19
5-B 58.45 39.16

5 5-C
5-D
58.45
58.45
39.16
39.16
5-E 58.45 39.16

6-B 58.45 39.16

6 6-C
6-D
58.45
58.45
39.16
39.16
6-E 58.45 39.16
WEST DIRECTION
GROUND
LINE PIER
FLOOR 2nd FLOOR

7-B 58.45 39.16

7 7-C
7-D
58.45
58.45
39.16
39.16
7-E 58.45 39.16

8-A 73.06 48.95


8-B 73.06 48.95
8 8-C
8-D
73.06
73.06
48.95
48.95
8-E 73.06 48.95

9-A 109.60 58.74


9-B 109.60 58.74
9 9-C
9-D
109.60
109.60
58.74
58.74
9-E 109.60 58.74
SUMMATION OF HORIZONTAL LOADS AT EACH LEVEL

FRAME FLOOR LEVELLOAD(kN)

A F2 116.75

B F2 488.78

C F2 452.18

D F2 415.80

E F2 322.09

F F2 79.13
H LEVEL SUMMATION OF HORIZONTAL LOADS AT EACH LEV

FRAME FLOOR LEVEL

1 F2

2 F2

3 F2

4 F2

5 F2

6 F2

7 F2

8 F2

9 F2
ONTAL LOADS AT EACH LEVEL

LOAD(kN)

234.94

234.94

234.94

234.94

430.73

430.73

430.73

538.41

234.94