Professional Documents
Culture Documents
Work Method Statement Roof Water Testing
Work Method Statement Roof Water Testing
INTRODUCTION
METHOD STATEMENT
1) The pipe with the fog nozzle need to be positioned at the ridge
location or at the highest point in the roof and the water should
cascade through the low ribs or the valley locations. The hose
should not be deliberately directed towards the sheet end laps or
flashing location since it will damage the sheets.