WELDING ROOF STRUCTUR

Periode Senin, 26 Mei 2014


LONG QTY FINISH ROOT PASE
NO POS SIZE
m' DWG ACT ON SITE REM Welding 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 20 976.8 528 448.8
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 8 8 0 8 195.2 195.2 0
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198 638
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 20 462.4 462.4 0
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 0 0 0
17 Girder Ring
Pos 15 HB.250 x 250 x 9 x 14 x 1545 1.55 2 1 1 1 6.18 6.18 0
18 Girder Ring
Pos 16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 5 2 4 47.4 37.92 9.48
19 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 1500 1.50 7 5 2 30 0 30
20 Girder Ring
Pos 10 HB.300 x 300 x 10 x 15 x 4980 49.80 6 6 0 6 1195.2 1195.2 0
21 Secondary Rafter
Pos 12 HB.200 x 200 x 8 x 12 x 1400 1.40 4 3 1 16.8 0 16.8
22 Secondary Rafter
Pos 13 HB.200 x 200 x 8 x 12 x 1320 1.32 6 6 0 31.68 0 31.68
23 Secondary Rafter
Pos 14 HB.200 x 200 x 8 x 12 x 1250 1.25 2 2 0 10 0 10

Total 367 318 49 249 6804.26 5531.6 1272.68

Progress Welding 68%


Progress Painting 25%
Progress installation 4%
TRUCTURE PROGRESS
CAP MT S.Blast Install
REMARKS
4 PROG REM 4 Finish to MT PROG REM PAINT Qty to tank

699.84 699.84 0 699.84 27 629.86 69.98 16 MT Ok & Painting Ok


732.36 732.36 0 732.36 17 415.00 317.36 16 MT Ok & Painting Ok
690.36 690.36 0 690.36 24 552.29 138.07 13 MT Ok & Painting Ok

976.8 528 448.8 976.8 0 976.8

182.78 182.78 0 182.78 19 182.78 0 MT Ok

0
30.08 30.08 0 30.08 2 30.08 0 2 2 ok MT Ok & Painting Ok
18.32 18.32 0 18.32 4 18.32 0 4 4 ok MT Ok & Painting Ok
2.32 2.32 0 2.32 4 2.32 0 4 4 ok MT Ok & Painting Ok
13.08 13.08 0 13.08 3 13.08 0 3 3 ok MT Ok & Painting Ok

290.58 0 290.58 290.58 15 150.30 140.28 15 MT Ok & Painting Ok

188.964 188.964 0 188.964 17 188.964 0 17 MT Ok & Painting Ok


60 60 0 60 1 60 0 1 1 ok MT Ok & Painting Ok

23 0 23 23 0 23

195.2 195.2 0 195.2 195.2 0

836 198 638 836 198 638


0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 462.4 0 462.40 462.40 0.00

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 0.00 0.00 0.00

6.18 6.18 0 6.18 6.18 0.00

47.4 37.92 9.48 47.40 37.92 9.48

30 0 30 30.00 0.00 30.00

1195.2 1195.2 0 1195.20 6 1195.20 0.00 2 MT Ok & Painting Ok


( 0n progress )
16.8 0 16.8 16.80 0.00 16.80

31.68 0 31.68 31.68 0.00 31.68

10 0 10 10.00 0.00 10.00

6807.9 5241 1567 6838.20 139 4337.89 2500.31 93 14


WELDING ROOF STRUCTUR
Periode Sabtu, 24 Mei 2014
LONG QTY FINISH ROOT PASE
NO POS SIZE
m' DWG ACT ON SITE REM Welding 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 20 976.8 528 448.8
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 8 8 0 8 195.2 195.2 0
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198 638
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 20 462.4 462.4 0
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 0 0 0
17 Girder Ring
Pos 15 HB.250 x 250 x 9 x 14 x 1545 1.55 2 1 1 1 6.18 6.18 0
18 Girder Ring
Pos 16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 5 2 4 47.4 37.92 9.48
19 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 1500 1.50 7 5 2 30 0 30
20 Girder Ring
Pos 10 HB.300 x 300 x 10 x 15 x 4980 49.80 6 6 0 6 1195.2 1195.2 0
21 Secondary Rafter
Pos 12 HB.200 x 200 x 8 x 12 x 1400 1.40 4 3 1 16.8 0 16.8
22 Secondary Rafter
Pos 13 HB.200 x 200 x 8 x 12 x 1320 1.32 6 6 0 31.68 0 31.68
23 Secondary Rafter
Pos 14 HB.200 x 200 x 8 x 12 x 1250 1.25 2 2 0 10 0 10

Total 367 318 49 249 6804.26 5531.6 1272.68

Progress Welding 68%


Progress Painting 25%
Progress installation 4%
TRUCTURE PROGRESS
CAP MT S.Blast Install
REMARKS
4 PROG REM 4 Finish to MT PROG REM PAINT Qty to tank

699.84 699.84 0 699.84 27 629.86 69.98 16 MT Ok & Painting Ok


732.36 732.36 0 732.36 17 415.00 317.36 16 MT Ok & Painting Ok
690.36 690.36 0 690.36 24 552.29 138.07 13 MT Ok & Painting Ok

976.8 528 448.8 976.8 0 976.8

182.78 182.78 0 182.78 19 182.78 0 MT Ok

0
30.08 30.08 0 30.08 2 30.08 0 2 2 ok MT Ok & Painting Ok
18.32 18.32 0 18.32 4 18.32 0 4 4 ok MT Ok & Painting Ok
2.32 2.32 0 2.32 4 2.32 0 4 4 ok MT Ok & Painting Ok
13.08 13.08 0 13.08 3 13.08 0 3 3 ok MT Ok & Painting Ok

290.58 0 290.58 290.58 15 150.30 140.28 15 MT Ok & Painting Ok

188.964 188.964 0 188.964 17 188.964 0 17 MT Ok & Painting Ok


60 60 0 60 1 60 0 1 1 ok MT Ok & Painting Ok

23 0 23 23 0 23

195.2 195.2 0 195.2 195.2 0

836 198 638 836 198 638


0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 462.4 0 462.40 462.40 0.00

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 0.00 0.00 0.00

6.18 6.18 0 6.18 6.18 0.00

47.4 37.92 9.48 47.40 37.92 9.48

30 0 30 30.00 0.00 30.00

1195.2 1195.2 0 1195.20 6 1195.20 0.00 2 MT Ok & Painting Ok


( 0n progress )
16.8 0 16.8 16.80 0.00 16.80

31.68 0 31.68 31.68 0.00 31.68

10 0 10 10.00 0.00 10.00

6807.9 5241 1567 6838.20 139 4337.89 2500.31 93 14


WELDING ROOF STRUCTUR
Periode Jum'at, 23 Mei 2014
LONG QTY FINISH ROOT PASE
NO POS SIZE
m' DWG ACT ON SITE REM Welding 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 20 976.8 528 448.8
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 8 8 0 8 195.2 195.2 0
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198 638
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 20 462.4 462.4 0
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 0 0 0
17 Girder Ring
Pos 15 HB.250 x 250 x 9 x 14 x 1545 1.55 2 1 1 1 6.18 6.18 0
18 Girder Ring
Pos 16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 5 2 4 47.4 37.92 9.48
19 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 1500 1.50 7 5 2 30 0 30
20 Girder Ring
Pos 10 HB.300 x 300 x 10 x 15 x 4980 49.80 6 6 0 6 1195.2 1195.2 0
21 Secondary Rafter
Pos 12 HB.200 x 200 x 8 x 12 x 1400 1.40 4 3 1 16.8 0 16.8
22 Secondary Rafter
Pos 13 HB.200 x 200 x 8 x 12 x 1320 1.32 6 6 0 31.68 0 31.68
23 Secondary Rafter
Pos 14 HB.200 x 200 x 8 x 12 x 1250 1.25 2 2 0 10 0 10

Total 367 318 49 249 6804.26 5531.6 1272.68

Progress Welding 68%


Progress Painting 25%
Progress installation 4%
TRUCTURE PROGRESS
CAP MT S.Blast Install
REMARKS
4 PROG REM 4 Finish to MT PROG REM PAINT Qty to tank

699.84 699.84 0 699.84 27 629.86 69.98 16 MT Ok & Painting Ok


732.36 732.36 0 732.36 17 415.00 317.36 16 MT Ok & Painting Ok
690.36 690.36 0 690.36 24 552.29 138.07 13 MT Ok & Painting Ok

976.8 528 448.8 976.8 0 976.8

182.78 182.78 0 182.78 19 182.78 0 MT Ok

0
30.08 30.08 0 30.08 2 30.08 0 2 2 ok MT Ok & Painting Ok
18.32 18.32 0 18.32 4 18.32 0 4 4 ok MT Ok & Painting Ok
2.32 2.32 0 2.32 4 2.32 0 4 4 ok MT Ok & Painting Ok
13.08 13.08 0 13.08 3 13.08 0 3 3 ok MT Ok & Painting Ok

290.58 0 290.58 290.58 15 150.30 140.28 15 MT Ok & Painting Ok

188.964 188.964 0 188.964 17 188.964 0 17 MT Ok & Painting Ok


60 60 0 60 1 60 0 1 1 ok MT Ok & Painting Ok

23 0 23 23 0 23

195.2 195.2 0 195.2 195.2 0

836 198 638 836 198 638


0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 462.4 0 462.40 462.40 0.00

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 0.00 0.00 0.00

6.18 6.18 0 6.18 6.18 0.00

47.4 37.92 9.48 47.40 37.92 9.48

30 0 30 30.00 0.00 30.00

1195.2 1195.2 0 1195.20 6 1195.20 0.00 MT Ok

16.8 0 16.8 16.80 0.00 16.80

31.68 0 31.68 31.68 0.00 31.68

10 0 10 10.00 0.00 10.00

6807.9 5241 1567 6838.20 139 4337.89 2500.31 91 14


WELDING ROOF STRUCTURE PR
Periode Kamis, 22 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 20 976.8 528 448.8
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 0 24 0 1 585.6 24.4 561.2
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198 638
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 20 462.4 462.4 0
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0 9.48
17 Girder Ring
Pos 15 HB.250 x 250 x 9 x 14 x 1545 1.55 2 1 1 6.18 0 6.18
18 Girder Ring
Pos 16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 5 2 4 47.4 37.92 9.48
19 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 1500 1.50 7 5 2 30 0 30
20 Girder Ring
Pos 10 HB.300 x 300 x 10 x 15 x 4980 49.80 6 6 0 6 1195.2 1195.2 0
21 Secondary Rafter
Pos 12 HB.200 x 200 x 8 x 12 x 1400 1.40 4 3 1 16.8 0 16.8
22 Secondary Rafter
Pos 13 HB.200 x 200 x 8 x 12 x 1320 1.32 6 6 0 31.68 0 31.68
23 Secondary Rafter
Pos 14 HB.200 x 200 x 8 x 12 x 1250 1.25 2 2 0 10 0 10

Total 359 334 49 241 7204.14 5354.6 1849.54


TRUCTURE PROGRESS
CAP MT S.Blast
REMARKS
4 PROG REM 4 Finish to MT PROG REM PAINT

699.84 699.84 0 699.84 26 606.53 93.31 16 MT& Painting


732.36 732.36 0 732.36 17 415.00 317.36 16 MT& Painting
690.36 690.36 0 690.36 22 506.26 184.10 13 MT& Painting

976.8 528 448.8 976.8 0 976.8

182.78 182.78 0 182.78 19 182.78 0 MT

0
30.08 30.08 0 30.08 2 30.08 0 2 MT& Painting
18.32 18.32 0 18.32 4 18.32 0 4 MT& Painting
2.32 2.32 0 2.32 4 2.32 0 4 MT& Painting
13.08 13.08 0 13.08 3 13.08 0 3 MT& Painting

290.58 0 290.58 290.58 15 150.30 140.28 15 MT& Painting

188.964 188.964 0 188.964 17 188.964 0 17 MT& Painting


60 60 0 60 1 60 0 1 MT& Painting

23 0 23 23 0 23

585.6 24.4 561.2 585.6 24.4 561.2

836 198 638 836 198 638


0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 462.4 0 462.40 462.40 0.00

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 9.48 0.00 9.48

6.18 0 6.18 6.18 0.00 6.18

47.4 37.92 9.48 47.40 37.92 9.48

30 0 30 30.00 0.00 30.00

1195.2 1195.2 0 1195.20 6 1195.20 0.00 MT

16.8 0 16.8 16.80 0.00 16.80

31.68 0 31.68 31.68 0.00 31.68

10 0 10 10.00 0.00 10.00

7198.3 5064 2134 7238.08 136 4091.56 3146.52 91


WELDING ROOF STRUCTURE PR
Periode Rabu, 21 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 20 976.8 528 448.8
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 0 24 0 1 585.6 24.4 561.2
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198 638
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 20 462.4 462.4 0
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0 9.48
17 Girder Ring
Pos 15 HB.250 x 250 x 9 x 14 x 1545 1.55 2 1 1 6.18 0 6.18
18 Girder Ring
Pos 16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 5 2 47.4 0 47.4
19 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 1500 1.50 7 5 2 30 0 30
20 Girder Ring
Pos 10 HB.300 x 300 x 10 x 15 x 4980 49.80 6 6 0 6 1195.2 0 1195.2
21 Secondary Rafter
Pos 12 HB.200 x 200 x 8 x 12 x 1400 1.40 4 3 1 16.8 0 16.8
22 Secondary Rafter
Pos 13 HB.200 x 200 x 8 x 12 x 1320 1.32 6 6 0 31.68 0 31.68
23 Secondary Rafter
Pos 14 HB.200 x 200 x 8 x 12 x 1250 1.25 2 2 0 10 0 10

Total 359 334 49 237 7204.14 4121.5 3082.66


TRUCTURE PROGRESS
CAP MT S.Blast
REMARKS
4 PROG REM 4 Ready to MT PROG REM PAINT

699.84 699.84 0 699.84 20 466.56 233.28 16 MT& Painting


732.36 732.36 0 732.36 16 390.59 341.77 16 MT& Painting
690.36 690.36 0 690.36 18 414.22 276.14 13 MT& Painting

976.8 528 448.8 976.8 0 976.8

182.78 182.78 0 182.78 19 182.78 0 MT

0
30.08 30.08 0 30.08 2 30.08 0 2 MT& Painting
18.32 18.32 0 18.32 4 18.32 0 4 MT& Painting
2.32 2.32 0 2.32 4 2.32 0 4 MT& Painting
13.08 13.08 0 13.08 3 13.08 0 3 MT& Painting

290.58 0 290.58 290.58 15 150.30 140.28 15 MT& Painting

188.964 188.964 0 188.964 17 188.964 0 17 MT& Painting


60 60 0 60 1 60 0 1 MT& Painting

23 0 23 23 0 23

585.6 24.4 561.2 585.6 24.4 561.2

836 198 638 836 198 638


0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 462.4 0 462.40 462.40 0.00

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 9.48 0.00 9.48

6.18 0 6.18 6.18 0.00 6.18

47.4 0 47.4 47.40 0.00 47.40

30 0 30 30.00 0.00 30.00

1195.2 0 1195.2 1195.20 6 1195.20 0.00 MT

16.8 0 16.8 16.80 0.00 16.80

31.68 0 31.68 31.68 0.00 31.68

10 0 10 10.00 0.00 10.00

7198.3 3830.9 3367 7238.08 125 3797.21 3440.87 91


WELDING ROOF STRUCTURE PR
Periode Selasa, 20 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 20 976.8 528 448.8
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 0 24 0 1 585.6 24.4 561.2
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198 638
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 20 462.4 462.4 0
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0 9.48
17 Girder Ring
Pos 15 HB.250 x 250 x 9 x 14 x 1545 1.55 2 1 1 6.18 0 6.18
18 Girder Ring
Pos 16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 5 2 47.4 0 47.4
19 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 1500 1.50 7 5 2 30 0 30
20 Girder Ring
Pos 10 HB.300 x 300 x 10 x 15 x 4980 49.80 6 6 0 6 1195.2 0 1195.2
21 Secondary Rafter
Pos 12 HB.200 x 200 x 8 x 12 x 1400 1.40 4 3 1 16.8 0 16.8
22 Secondary Rafter
Pos 13 HB.200 x 200 x 8 x 12 x 1320 1.32 6 6 0 31.68 0 31.68
23 Secondary Rafter
Pos 14 HB.200 x 200 x 8 x 12 x 1250 1.25 2 2 0 10 0 10

Total 359 334 49 237 7204.14 4121.5 3082.66


TRUCTURE PROGRESS
CAP MT S.Blast
REMARKS
4 PROG REM 4 Ready to MT PROG REM PAINT

699.84 699.84 0 699.84 20 466.56 233.28 16 MT& Painting


732.36 732.36 0 732.36 16 390.59 341.77 16 MT& Painting
690.36 690.36 0 690.36 18 414.22 276.14 13 MT& Painting

976.8 528 448.8 976.8 0 976.8

182.78 182.78 0 182.78 15 144.3 38.48 MT

0
30.08 30.08 0 30.08 2 30.08 0 2 MT& Painting
18.32 18.32 0 18.32 4 18.32 0 4 MT& Painting
2.32 2.32 0 2.32 4 2.32 0 4 MT& Painting
13.08 13.08 0 13.08 3 13.08 0 3 MT& Painting

290.58 0 290.58 290.58 15 150.30 140.28 15 MT& Painting

188.964 188.964 0 188.964 17 188.964 0 17 MT& Painting


60 60 0 60 1 60 0 1 MT& Painting

23 0 23 23 0 23

585.6 24.4 561.2 585.6 24.4 561.2

836 198 638 836 198 638


0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 462.4 0 462.40 462.40 0.00

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 9.48 0.00 9.48

6.18 0 6.18 6.18 0.00 6.18

47.4 0 47.4 47.40 0.00 47.40

30 0 30 30.00 0.00 30.00

1195.2 0 1195.2 1195.20 6 1195.20 0.00

16.8 0 16.8 16.80 0.00 16.80

31.68 0 31.68 31.68 0.00 31.68

10 0 10 10.00 0.00 10.00

7198.3 3830.9 3367 7238.08 121 3758.73 3479.35 91


WELDING ROOF STRUCTURE PR
Periode Senin, 19 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 12 976.8 316.8 660
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 0 24 0 1 585.6 24.4 561.2
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198 638
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 13 462.4 300.56 161.84
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0 9.48
17 Girder Ring
Pos 15 HB.250 x 250 x 9 x 14 x 1545 1.55 2 1 1 6.18 0 6.18
18 Girder Ring
Pos 16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 5 2 47.4 0 47.4
19 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 1500 1.50 7 5 2 30 0 30
20 Girder Ring
Pos 10 HB.300 x 300 x 10 x 15 x 4980 49.80 6 6 0 4 1195.2 0 1195.2
21 Secondary Rafter
Pos 12 HB.200 x 200 x 8 x 12 x 1400 1.40 4 3 1 16.8 0 16.8
22 Secondary Rafter
Pos 13 HB.200 x 200 x 8 x 12 x 1320 1.32 6 6 0 31.68 0 31.68
23 Secondary Rafter
Pos 14 HB.200 x 200 x 8 x 12 x 1250 1.25 2 2 0 10 0 10

Total 359 334 49 220 7204.14 3748.4 3455.7


TRUCTURE PROGRESS
CAP MT S.Blast
REMARKS
4 PROG REM 4 Ready to MT PROG REM PAINT

699.84 699.84 0 699.84 20 466.56 233.28 16 MT& Painting


732.36 732.36 0 732.36 16 390.59 341.77 16 MT& Painting
690.36 690.36 0 690.36 18 414.22 276.14 13 MT& Painting

976.8 316.8 660 976.8 0 976.8

182.78 182.78 0 182.78 0 182.78

0
30.08 30.08 0 30.08 2 30.08 0 2 MT& Painting
18.32 18.32 0 18.32 4 18.32 0 4 MT& Painting
2.32 2.32 0 2.32 4 2.32 0 4 MT& Painting
13.08 13.08 0 13.08 3 13.08 0 3 MT& Painting

290.58 0 290.58 290.58 15 150.30 140.28 15 MT& Painting

188.964 188.964 0 188.964 17 188.964 0 17 MT& Painting


60 60 0 60 1 60 0 1 MT& Painting

23 0 23 23 0 23

585.6 24.4 561.2 585.6 24.4 561.2

836 198 638 836 198 638


0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 300.56 161.84 462.40 300.56 161.84

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 9.48 0.00 9.48

6.18 0 6.18 6.18 0.00 6.18

47.4 0 47.4 47.40 0.00 47.40

30 0 30 30.00 0.00 30.00

1195.2 0 1195.2 1195.20 796.80 398.40

16.8 0 16.8 16.80 0.00 16.80

31.68 0 31.68 31.68 0.00 31.68

10 0 10 10.00 0.00 10.00

7198.3 3457.86 3740.4 7238.08 100 3054.19 4183.89 91


WELDING ROOF STRUCTURE PR
Periode 16 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 12 976.8 316.8 660
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 0 24 0 1 585.6 24.4 561.2
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198 638
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 462.4 0 462.4
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0 9.48
17 Girder Ring
Pos 15 HB.250 x 250 x 9 x 14 x 1545 1.55 2 1 1 6.18 0 6.18
18 Girder Ring
Pos 16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 5 2 47.4 0 47.4
19 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 1500 1.50 7 5 2 30 0 30
20 Girder Ring
Pos 10 HB.300 x 300 x 10 x 15 x 4980 49.80 6 6 0 4 1195.2 0 1195.2
Total 347 323 48 207 5950.46 3447.9 3697.78
TRUCTURE PROGRESS
CAP MT S.Blast
REMARKS
4 PROG REM 4 Ready to MT PROG REM PAINT

699.84 699.84 0 699.84 20 466.56 233.28 16 MT& Painting


732.36 732.36 0 732.36 16 390.59 341.77 16 MT& Painting
690.36 690.36 0 690.36 18 414.22 276.14 13 MT& Painting

976.8 316.8 660 976.8 0 976.8

182.78 182.78 0 182.78 0 182.78

0
30.08 30.08 0 30.08 2 30.08 0 2 MT& Painting
18.32 18.32 0 18.32 4 18.32 0 4 MT& Painting
2.32 2.32 0 2.32 4 2.32 0 4 MT& Painting
13.08 13.08 0 13.08 3 13.08 0 3 MT& Painting

290.58 0 290.58 290.58 15 150.30 140.28 15 MT& Painting

188.964 188.964 0 188.964 17 188.964 0 17 MT& Painting


60 60 0 60 1 60 0 1 MT& Painting

23 0 23 23 0 23

585.6 24.4 561.2 585.6 24.4 561.2


836 198 638 836 198 638

0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 0 462.4 462.40 0.00 462.40

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 9.48 0.00 9.48

6.18 0 6.18 6.18 0.00 6.18

47.4 0 47.4 47.40 0.00 47.40

30 0 30 30.00 0.00 30.00

1195.2 0 1195.2 1195.20 796.80 398.40


7139.8 3157.3 3982 7179.60 100 2753.63 4425.97 91
WELDING ROOF STRUCTURE PROG
Periode 14 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 12 976.8 316.8 660
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 0 24 0 1 585.6 24.4 561.2
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198 638
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 462.4 0 462.4
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0 9.48
17 Girder Ring
Pos 15 HB.250 x 250 x 9 x 14 x 1545 1.55 2 1 1 6.18 0 6.18
18 Girder Ring
Pos 16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 5 2 47.4 0 47.4
19 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 1500 1.50 7 5 2 30 0 30

Total 341 317 48 203 5950.46 3447.9 2502.58


TRUCTURE PROGRESS
CAP MT
REMARKS
4 PROG REM 4 Ready to MT PROG REM

699.84 699.84 0 699.84 20 466.56 233.28 MT


732.36 732.36 0 732.36 16 390.59 341.77 MT
690.36 690.36 0 690.36 18 414.22 276.14 MT

976.8 316.8 660 976.8 0 976.8

182.78 182.78 0 182.78 0 182.78

0
30.08 30.08 0 30.08 2 30.08 0 MT
18.32 18.32 0 18.32 4 18.32 0 MT
2.32 2.32 0 2.32 4 2.32 0 MT
13.08 13.08 0 13.08 3 13.08 0 MT

290.58 0 290.58 290.58 15 150.30 140.28 MT

188.964 188.964 0 188.964 17 188.964 0


60 60 0 60 1 60 0 MT

23 0 23 23 0 23
585.6 24.4 561.2 585.6 24.4 561.2

836 198 638 836 198 638

0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 0 462.4 462.40 0.00 462.40

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 9.48 0.00 9.48

6.18 0 6.18 6.18 0.00 6.18

47.4 0 47.4 47.40 0.00 47.40

30 0 30 30.00 0.00 30.00

5944.6 3157.3 2787 5984.40 100 1956.83 4027.57


WELDING ROOF STRUCTURE PROG
Periode 13 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 12 976.8 316.8 660
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 0 24 0 1 585.6 24.4 561.2
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198 638
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 462.4 0 462.4
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0 9.48
17 Girder Ring
Pos 15 HB.250 x 250 x 9 x 14 x 1545 1.55 2 1 1 6.18 0 6.18
18 Girder Ring
Pos 16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 5 2 47.4 0 47.4
19 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 1500 1.50 7 5 2 30 0 30

Total 341 317 48 203 5950.46 3447.9 2502.58


TRUCTURE PROGRESS
CAP MT
REMARKS
4 PROG REM 4 Ready to MT PROG REM

699.84 699.84 0 699.84 20 466.56 233.28 MT


732.36 732.36 0 732.36 16 390.59 341.77 MT
690.36 690.36 0 690.36 18 414.22 276.14 MT

976.8 316.8 660 976.8 0 976.8

182.78 182.78 0 182.78 0 182.78

0
30.08 30.08 0 30.08 2 30.08 0 MT
18.32 18.32 0 18.32 4 18.32 0 MT
2.32 2.32 0 2.32 4 2.32 0 MT
13.08 13.08 0 13.08 3 13.08 0 MT

290.58 0 290.58 290.58 15 150.30 140.28 MT

188.964 188.964 0 188.964 10 188.964 0


60 60 0 60 1 60 0 MT

23 0 23 23 0 23
585.6 24.4 561.2 585.6 24.4 561.2

836 198 638 836 198 638

0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 0 462.4 462.40 0.00 462.40

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 9.48 0.00 9.48

6.18 0 6.18 6.18 0.00 6.18

47.4 0 47.4 47.40 0.00 47.40

30 0 30 30.00 0.00 30.00

5944.6 3157.3 2787 5984.40 93.00 1956.83 4027.57


WELDING ROOF STRUCTURE PROG
Periode 12 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 12 976.8 316.8 660
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 0 24 0 1 585.6 24.4 561.2
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198 638
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 462.4 0 462.4
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0 9.48
17 Girder Ring
Pos 15 HB.250 x 250 x 9 x 14 2 1 1
18 Girder Ring
Pos 16 HB.250 x 250 x 9 x 14 7 5 2
19 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 7 5 2

Total 325 306 43 203 5866.88 3447.9 2419


TRUCTURE PROGRESS
CAP MT
REMARKS
4 PROG REM 4 Ready to MT PROG REM

699.84 699.84 0 699.84 20 466.56 233.28 MT


732.36 732.36 0 732.36 16 390.59 341.77 MT
690.36 690.36 0 690.36 18 414.22 276.14 MT

976.8 316.8 660 976.8 0 976.8

182.78 182.78 0 182.78 0 182.78

0
30.08 30.08 0 30.08 2 30.08 0 MT
18.32 18.32 0 18.32 4 18.32 0 MT
2.32 2.32 0 2.32 4 2.32 0 MT
13.08 13.08 0 13.08 3 13.08 0 MT

290.58 0 290.58 290.58 15 150.30 140.28 MT

188.964 188.964 0 188.964 188.964 0


60 60 0 60 1 60 0 MT

23 0 23 23 0 23
585.6 24.4 561.2 585.6 24.4 561.2

836 198 638 836 198 638

0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 0 462.4 462.40 0.00 462.40

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 9.48 0.00 9.48

5861 3157.3 2703.7 5900.82 83.00 1956.83 3943.99


WELDING ROOF STRUCTURE PRO
Periode 10 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 12 976.8 316.8
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 8 6 2 1 146.4 24.4
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 9 836 198
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 462.4 0
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0

Total 333 288 45 203 5427.68 3447.9


F STRUCTURE PROGRESS
ROOT PASE CAP MT
REMARKS
REM 4 PROG REM 4 Ready to MT PROG REM

0 699.84 699.84 0 699.84 19 443.23 256.61 MT


0 732.36 732.36 0 732.36 16 390.59 341.77 MT
0 690.36 690.36 0 690.36 16 368.19 322.17 MT

660 976.8 316.8 660 976.8 0 976.8

0 182.78 182.78 0 182.78 0 182.78

0
0 30.08 30.08 0 30.08 2 30.08 0 MT
0 18.32 18.32 0 18.32 4 18.32 0 MT
0 2.32 2.32 0 2.32 4 2.32 0 MT
0 13.08 13.08 0 13.08 3 13.08 0 MT

0 290.58 0 290.58 290.58 10 100.20 190.38 MT

0 188.964 188.964 0 188.964 188.964 0


0 60 60 0 60 1 60 0 MT

23 23 0 23 23 0 23
122 146.4 24.4 122 146.4 24.4 122

638 836 198 638 836 198 638

5.88 0 0 0 5.88 0.00 5.88

9.48 9.48 0 9.48 43.42 0.00 43.42

462.4 462.4 0 462.4 462.40 0.00 462.40

39.84 39.84 0 39.84 39.84 0.00 39.84

9.72 9.72 0 9.72 9.72 0.00 9.72

9.48 9.48 0 9.48 9.48 0.00 9.48

1979.8 5421.8 3157.3 2264.5 5461.62 75.00 1837.38 3624.24


WELDING ROOF STRUCTURE PRO
Periode 9 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 12 976.8 316.8
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 8 6 2 1 146.4 24.4
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 6 836 132
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 462.4 0
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0

Total 333 288 45 200 5427.68 3381.9


F STRUCTURE PROGRESS
ROOT PASE CAP MT
REMARKS
REM 4 PROG REM 4 Ready to MT PROG REM

0 699.84 699.84 0 699.84 16 373.25 326.59 MT


0 732.36 732.36 0 732.36 16 390.59 341.77 MT
0 690.36 690.36 0 690.36 13 299.16 391.20 MT

660 976.8 316.8 660 976.8 0 976.8

0 182.78 182.78 0 182.78 0 182.78

0
0 30.08 30.08 0 30.08 2 30.08 0 MT
0 18.32 18.32 0 18.32 4 18.32 0 MT
0 2.32 2.32 0 2.32 4 2.32 0 MT
0 13.08 13.08 0 13.08 3 13.08 0 MT

0 290.58 0 290.58 290.58 2 20.04 270.54 MT

0 188.964 188.964 0 188.964 188.964 0


0 60 60 0 60 1 60 0 MT

23 23 0 23 23 0 23
122 146.4 24.4 122 146.4 24.4 122

704 836 132 704 836 132 704

5.88 0 0 0 5.88 0.00 5.88

9.48 9.48 0 9.48 43.42 0.00 43.42

462.4 462.4 0 462.4 462.40 0.00 462.40

39.84 39.84 0 39.84 39.84 0.00 39.84

9.72 9.72 0 9.72 9.72 0.00 9.72

9.48 9.48 0 9.48 9.48 0.00 9.48

2045.8 5421.8 3091.3 2330.5 5461.62 61.00 1552.20 3909.42


WELDING ROOF STRUCTURE PRO
Periode 8 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 12 976.8 316.8
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 290.58
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 8 6 2 1 146.4 24.4
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 6 836 132
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 462.4 0
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0

Total 333 288 45 200 5427.68 3381.9


F STRUCTURE PROGRESS
ROOT PASE CAP MT
REMARKS
REM 4 PROG REM 4 Ready to MT PROG REM

0 699.84 699.84 0 699.84 16 373.25 326.59 MT


0 732.36 732.36 0 732.36 16 390.59 341.77 MT
0 690.36 690.36 0 690.36 13 299.16 391.20 MT

660 976.8 316.8 660 976.8 0 976.8

0 182.78 182.78 0 182.78 0 182.78

0
0 30.08 30.08 0 30.08 2 30.08 0 MT
0 18.32 18.32 0 18.32 4 18.32 0 MT
0 2.32 2.32 0 2.32 4 2.32 0 MT
0 13.08 13.08 0 13.08 3 13.08 0 MT

0 290.58 0 290.58 290.58 0 290.58

0 188.964 188.964 0 188.964 188.964 0


0 60 60 0 60 1 60 0 MT

23 23 0 23 23 0 23
122 146.4 24.4 122 146.4 24.4 122

704 836 132 704 836 132 704

5.88 0 0 0 5.88 0.00 5.88

9.48 9.48 0 9.48 43.42 0.00 43.42

462.4 462.4 0 462.4 462.40 0.00 462.40

39.84 39.84 0 39.84 39.84 0.00 39.84

9.72 9.72 0 9.72 9.72 0.00 9.72

9.48 9.48 0 9.48 9.48 0.00 9.48

2045.8 5421.8 3091.3 2330.5 5461.62 59.00 1532.16 3929.46


WELDING ROOF STRUCTURE PR
Periode 7 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG REM

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84 0
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36 0
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36 0
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 37 0 12 976.8 316.8 660
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78 0
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08 0
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32 0
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32 0
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08 0
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 0 290.58
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964 0
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60 0
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0 23
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 8 6 2 1 146.4 24.4 122
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 38 0 6 836 132 704
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0 5.88
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0 9.48
13 T Beam For Hoist
Pos 20 TB.250 x 250 x 9 x 14 x 5780 5.78 20 20 0 462.4 0 462.4
14 Girder Ring
Pos 18 HB.250 x 250 x 9 x 14 x 9960 9.96 7 1 6 39.84 0 39.84
15 Girder Ring
Pos17 HB.250 x 250 x 9 x 14 x 2430 2.43 2 1 1 9.72 0 9.72
16 Girder Ring
Pos16 HB.250 x 250 x 9 x 14 x 2370 2.37 7 1 6 9.48 0 9.48

Total 333 288 45 200 5427.68 3091.3 2336.38


TRUCTURE PROGRESS
CAP MT
REMARKS
4 PROG REM 4 Ready to MT PROG REM

699.84 699.84 0 699.84 14 326.59 373.25 MT


732.36 732.36 0 732.36 14 341.77 390.59 MT
690.36 690.36 0 690.36 13 299.16 391.20 MT

976.8 316.8 660 976.8 0 976.8

182.78 182.78 0 182.78 0 182.78

0
30.08 30.08 0 30.08 2 30.08 0 MT
18.32 18.32 0 18.32 4 18.32 0 MT
2.32 2.32 0 2.32 4 2.32 0 MT
13.08 13.08 0 13.08 3 13.08 0 MT

290.58 0 290.58 290.58 0 290.58

188.964 188.964 0 188.964 188.964 0


60 60 0 60 1 60 0 MT

23 0 23 23 0 23

146.4 24.4 122 146.4 24.4 122

836 132 704 836 132 704


0 0 0 5.88 0.00 5.88

9.48 0 9.48 43.42 0.00 43.42

462.4 0 462.4 462.40 0.00 462.40

39.84 0 39.84 39.84 0.00 39.84

9.72 0 9.72 9.72 0.00 9.72

9.48 0 9.48 9.48 0.00 9.48

5421.8 3091.3 2330.5 2179.48 55.00 1436.68 4024.94


WELDING ROOF STRUCTURE PRO
Periode 6 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 36 1 12 950.4 316.8
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 8 6 2 1 146.4 24.4
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 25 13 4 550 88
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0

Total 297 251 46 198 4593.84 3047.3


F STRUCTURE PROGRESS
ROOT PASE CAP MT
REMARKS
REM 4 PROG REM 4 Ready to MT PROG REM

0 699.84 699.84 0 699.84 10 233.28 466.56 MT


0 732.36 732.36 0 732.36 13 317.36 415.00 MT
0 690.36 690.36 0 690.36 13 299.16 391.20 MT

633.6 950.4 316.8 633.6 950.4 0 950.4

0 182.78 182.78 0 182.78 0 182.78

0
0 30.08 30.08 0 30.08 2 30.08 0
0 18.32 18.32 0 18.32 4 18.32 0
0 2.32 2.32 0 2.32 4 2.32 0
0 13.08 13.08 0 13.08 3 13.08 0

290.58 290.58 0 290.58 290.58 0 290.58

0 188.964 188.964 0 188.964 188.964 0


0 60 60 0 60 60 0

23 23 0 23 23 0 23
122 146.4 24.4 122 146.4 24.4 122

462 550 88 462 550 88 462

5.88 0 0 0 5.88 0 5.88

9.48 9.48 0 9.48 43.42 0.00 43.42

1546.54 4588 3047.3 1541 4627.78 49.00 1274.96 3352.83


WELDING ROOF STRUCTURE PRO
Periode 5 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 36 1 12 950.4 316.8
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 8 6 2 1 146.4 24.4
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 25 13 1 550 22
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0
Total 297 251 46 195 4593.84 2981.3
F STRUCTURE PROGRESS
ROOT PASE CAP MT
REMARKS
REM 4 PROG REM 4 Ready to MT PROG REM

0 699.84 699.84 0 699.84 10 233.28 466.56 MT


0 732.36 732.36 0 732.36 11 268.53 463.83 MT
0 690.36 690.36 0 690.36 11 253.13 437.23 MT

633.6 950.4 316.8 633.6 950.4 0 950.4

0 182.78 182.78 0 182.78 182.78 0

0 30.08 30.08 0 30.08 0.00 30.08


0 18.32 18.32 0 18.32 0.00 18.32
0 2.32 2.32 0 2.32 0.00 2.32
0 13.08 13.08 0 13.08 0.00 13.08

290.58 290.58 0 290.58 290.58 0 290.58

0 188.964 188.964 0 188.964 188.964 0


0 60 60 0 60 60 0

23 23 0 23 23 0 23
122 146.4 24.4 122 146.4 24.4 122

528 550 22 528 550 22 528

5.88 0 0 0 5.88 0 5.88

9.48 9.48 0 9.48 43.42 0.00 43.42


1612.54 4588 2981.3 1607 4627.78 32.00 1233.09 3394.69
WELDING ROOF STRUCTURE PRO
Periode 3 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 36 1 11 950.4 290.4
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 8 6 2 1 146.4 24.4
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 25 13 550 0
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0
Total 297 251 46 193 4593.84 2932.9
F STRUCTURE PROGRESS
ROOT PASE CAP MT
REMARKS
REM 4 PROG REM 4 Ready to MT PROG REM

0 699.84 699.84 0 699.84 6 139.968 559.872 MT


0 732.36 732.36 0 732.36 9 219.708 512.652 MT
0 690.36 690.36 0 690.36 10 230.12 460.24 MT

660 950.4 290.4 660 950.4 0 950.4

0 182.78 182.78 0 182.78 182.78 0

0 30.08 30.08 0 30.08 0 30.08


0 18.32 18.32 0 18.32 0 18.32
0 2.32 2.32 0 2.32 0 2.32
0 13.08 13.08 0 13.08 0 13.08

290.58 290.58 0 290.58 290.58 0 290.58

0 188.964 188.964 0 188.964 188.964 0


0 60 60 0 60 60 0

23 23 0 23 23 0 23
122 146.4 24.4 122 146.4 24.4 122

550 550 0 550 550 0 550

5.88 0 0 0 5.88 0 5.88

9.48 9.48 0 9.48 43.42 0.00 43.42


1660.94 4588 2932.9 1655 4627.78 25.00 1045.94 3581.84
WELDING ROOF STRUCTURE PRO
Periode 2 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 30 732.36 732.36
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 30 690.36 690.36
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 36 1 8 950.4 211.2
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 19 182.78 182.78
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 29 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60
(Central Drum)
Pos 11
8 Secondary Rafter
Pos 7 HB.250 x 235 x 14 x 14 x 5750 5.75 1 1 0 23 0
9 Main Rafter
Pos 6 HB.250 x 235 x 14 x 14 x 6100 6.10 8 6 2 146.4 0
10 Secondary Rafter
Pos 3 HB.250 x 125 x 9 x 9 x 5500 5.50 38 25 13 550 0
11 Girder Ring
Pos 18 HB.200 x 100 x 12 x 12 x 1470 1.47 7 1 6 5.88 0
12 Girder Ring
Pos 16 HB.250 x 125 x 9 x 9 x 2370 2.37 7 1 6 9.48 0
Total 297 251 46 189 2829.3
F STRUCTURE PROGRESS
ROOT PASE CAP MT
REMARKS
REM 4 PROG REM 4 Ready to MT PROG REM

0 699.84 699.84 0 699.84 1 23.328 676.512 MT


0 732.36 732.36 0 732.36 6 146.472 585.888 MT
0 690.36 690.36 0 690.36 7 161.084 529.276 MT

739.2 950.4 211.2 739.2 950.4 0 950.4

0 182.78 182.78 0 182.78 182.78 0

0 30.08 30.08 0 30.08 0 30.08


0 18.32 18.32 0 18.32 0 18.32
0 2.32 2.32 0 2.32 0 2.32
0 13.08 13.08 0 13.08 0 13.08

290.58 290.58 0 290.58 290.58 0 290.58

0 188.964 188.964 0 188.964 188.964 0


0 60 60 0 60 60 0

23 23 0 23 3969.57 0 3969.57
146.4 146.4 0 146.4 34784.64 0 34785

550 550 0 550 25132.25 0 25132

5.88 0 0 0 5.88 0 5.88

9.48 9.48 0 9.48 43.4184 0 43.4184


1764.54 2829.3 1759 14 762.63 67032
WELDING ROOF STRUCTURE PRO
Periode 1 Mei 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 20 732.36 488.24
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 26 690.36 598.312
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 8 29 5 211.2 0
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 9 182.78 86.58
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 15 290.58 150.3
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60
(Central Drum)
Pos 11
Total 236 189 47 148 2336
F STRUCTURE PROGRESS
ROOT PASE CAP MT
REMARKS
REM 4 PROG REM 4 Ready to MT PROG REM

0 699.84 699.84 0 699.84 1 23.328 676.512 MT


244.12 732.36 488.24 244.12 732.36 4 97.648 634.712 MT
92.048 690.36 598.312 92.048 690.36 4 92.048 598.312 MT

211.2 211.2 0 211.2 211.2 0 211.2

96.2 182.78 86.58 96.2 182.78 86.58 96.2

0 30.08 30.08 0 30.08 0 30.08


0 18.32 18.32 0 18.32 0 18.32
0 2.32 2.32 0 2.32 0 2.32
0 13.08 13.08 0 13.08 0 13.08

140.28 290.58 150.3 140.28 290.58 0 290.58

0 188.964 188.964 0 188.964 188.964 0


0 60 60 0 60 60 0

783.848 2336 783.85 548.57 2571.3


WELDING ROOF STRUCTURE PRO
Periode 30 April 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 30 699.84 699.84
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 20 732.36 488.24
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 26 690.36 598.312
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 8 29 0 211.2 0
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 9 182.78 86.58
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 15 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60
(Central Drum)
Pos 11
Total 236 189 47 143 2185.7
F STRUCTURE PROGRESS
ROOT PASE CAP MT
REMARKS
REM 4 PROG REM 4 Ready to MT PROG REM

0 699.84 699.84 0 699.84 1 23.328 676.512 finish MT


244.12 732.36 488.24 244.12 732.36 4 97.648 634.712 finish MT
92.048 690.36 598.312 92.048 690.36 598.312 92.048

211.2 211.2 0 211.2 211.2 0 211.2

96.2 182.78 86.58 96.2 182.78 86.58 96.2

0 30.08 30.08 0 30.08 0 30.08


0 18.32 18.32 0 18.32 0 18.32
0 2.32 2.32 0 2.32 0 2.32
0 13.08 13.08 0 13.08 0 13.08

290.58 290.58 0 290.58 290.58 0 290.58

0 188.964 188.964 0 188.964 188.964 0


0 60 60 0 60 60 0

934.148 2185.74 934.15 1054.8 2065.1


WELDING ROOF STRUCTURE PRO
Periode 29 April 2014
LONG QTY ROOT PASE
NO POS SIZE FINISH
m' DWG ACT ON SITE REM 4 PROG

1 Main Rafter
Pos 1.1 HB.250 x 125 x 9 x 9 x 5832 5.83 30 30 20 699.84 466.56
Pos 1.2 HB.250 x 125 x 9 x 9 x 6103 6.10 30 30 11 732.36 268.532
Pos 1.3 HB.250 x 125 x 9 x 9 x 5753 5.75 30 30 16 690.36 368.192
2 Secondary Rafter
Pos 2 HB.250 x 125 x 9 x 9 x 6600 6.60 37 8 29 0 211.2 0
3 Secondary Rafter
Pos 4 HB.200 x 200 x 8 x 12 x 2405 2.41 19 19 9 182.78 86.58
4 Central Drum
Pos 5
Pos 5' HB.200 x 100 x 12 x 12 x 3760 3.76 2 2 2 30.08 30.08
Pos 5'' HB.200 x 100 x 12 x 12 x 1145 1.15 4 4 4 18.32 18.32
Pos 5''' HB.200 x 100 x 12 x 12 x 1245 0.15 4 4 4 2.32 2.32
Pos 5'''' HB.200 x 100 x 12 x 12 x 1090 1.09 3 3 3 13.08 13.08
5 Secondary Rafter
Pos 8 HB.250 x 250 x 9 x 14 x 2505 2.51 38 29 9 0 290.58 0
6 Girder Ring
Pos 9 HB.250 x 250 x 9 x 14 x 1629 1.63 38 29 9 29 188.964 188.964
7 Girder Ring HB.200 x 100 x 12 x 12 x 15000 15.00 1 1 1 60 60
(Central Drum)
Pos 11
Total 236 189 47 99 1502.6
F STRUCTURE PROGRESS
ROOT PASE CAP MT
REMARKS
REM 4 PROG REM 4 Ready to MT PROG REM

233.28 699.84 466.56 233.28 699.84 1 23.328 676.512 finish MT


463.828 732.36 268.532 463.83 732.36 3 73.236 659.124 finish MT
322.168 690.36 368.192 322.17 690.36 368.192 322.168

211.2 211.2 0 211.2 211.2 0 211.2

96.2 182.78 86.58 96.2 182.78 86.58 96.2

0 30.08 30.08 0 30.08 0 30.08


0 18.32 18.32 0 18.32 0 18.32
0 2.32 2.32 0 2.32 0 2.32
0 13.08 13.08 0 13.08 0 13.08

290.58 290.58 0 290.58 290.58 0 290.58

0 188.964 188.964 0 188.964 188.964 0


0 60 60 0 60 60 0

1617.26 1502.63 1617 800.3 2319.6


ROOF STRUCTURE WELDING

QTY
NO POS SIZE ROOT PASE
DWG ACT

1 1 HB.250 x 125 x 9 x 9
2 2 HB.250 x 125 x 9 x 9
3 3 HB.200 x 100 x 12 x 12
4 4 HB.200 x 200 x 8 x 12
5 5 HB.200 x 100 x 12 x 12
6 6 HB.250 x 255 x 14 x 14
7 7 HB.250 x 255 x 14 x 14
8 8 HB.250 x 250 x 9 x 14
9 9 HB.250 x 250 x 9 x 14
10 10 HB.300 x 300x 10 x 15
11 11 HB.200 x 100 x 12 x 12
12 12 HB.200 x 200 x 8 x 12
13 13 HB.200 x 200 x 8 x 12
14 14 HB.200 x 200 x 8 x 12
15 15 HB.250 x 250 x 9 x 14
16 16 HB.250 x 250 x 9 x 14
17 17 HB.250 x 250 x 9 x 14
18 18 HB.250 x 250 x 9 x 14
FILLER CAP MT REMARKS
D.4 ROOF STRUCTURE ( M-11-32-800-73-18 )

1 Main Rafter A 516 Gr.70 30


1a Flange Plate A 516 Gr.70 60
1b WEB PLATE A 516 Gr.70 30
1c Gusset Plate A 516 Gr.70 76
1d Gusset Plate A 516 Gr.70 14 P
1e Gusset Plate A 516 Gr.70 120 P
2 Secondary Rafter A 516 Gr.70 37 H
2a Flange Plate A 516 Gr.70 74 P
2b WEB PLATE A 516 Gr.70 37 P
3 Secondary Rafter A 516 Gr.70 38 HB
3.a Flange Plate A 516 Gr.70 76 PL
3.b WEB PLATE A 516 Gr.70 38 PL
4 Secondary Rafter A 516 Gr.70 19 HB
4.a Flange Plate A 516 Gr.70 38 PL
4.b WEB PLATE A 516 Gr.70 19 PL
5 Secondary Rafter A 516 Gr.70 1 HB
5.a Flange Plate A 516 Gr.70 2 PL
5.b WEB PLATE A 516 Gr.70 1 PL
5' Secondary Rafter A 516 Gr.70 2 HB
5'a Flange Plate A 516 Gr.70 4 PL
5'b WEB PLATE A 516 Gr.70 2 PL
5''' Secondary Rafter A 516 Gr.70 2 HB
5'''a Flange Plate A 516 Gr.70 4 PL
5'''b WEB PLATE A 516 Gr.70 2 PL
5'''' Secondary Rafter A 516 Gr.70 3 HB
5''''a Flange Plate A 516 Gr.70 6 PL
5''''b WEB PLATE A 516 Gr.70 3 PL

6 Main Rafter A 516 Gr.70 8


6.a Flange Plate A 516 Gr.70 16 PL
6.b WEB PLATE A 516 Gr.70 8 PL
6.c Gusset Plate A 516 Gr.70 32 P
7 Secondary Rafter A 516 Gr.70 1
7.a Flange Plate A 516 Gr.70 2 PL
7.b Flange Plate A 516 Gr.70 1 PL
7.c Gusset Plate A 516 Gr.70 10 P
8 Girder Ring A 516 Gr.70 38 HB
8.a Flange Plate A 516 Gr.70 76 PL
8.b WEB PLATE A 516 Gr.70 38 PL
8.c Gusset Plate A 516 Gr.70 38 P
8.d Gusset Plate A 516 Gr.70 38 P
9 Girder Ring A 516 Gr.70 38 HB
9.a Flange Plate A 516 Gr.70 76
9.b WEB PLATE A 516 Gr.70 38
9.c Girder Ring A 516 Gr.70 38
10 Girder Ring A 516 Gr.70 6 H
10.a Flange Top Plate A 516 Gr.70 6
10.b WEB PLATE A 516 Gr.70 6
10.c Flange Bottom Plate A 516 Gr.70 6
10.d Gusset Plate A 516 Gr.70 19
10.c Gusset Plate A 516 Gr.70 38
11 Girder Ring A 516 Gr.70 4 H
11.a Flange Plate A 516 Gr.70 8
11.b WEB PLATE A 516 Gr.70 4
11.c Gusset Plate A 516 Gr.70 8
11.d Gusset Plate A 516 Gr.70 19
12 Secondary Rafter A 516 Gr.70 4 H
12.a Flange Plate A 516 Gr.70 8
12.b WEB PLATE A 516 Gr.70 4
13 Secondary Girder A 516 Gr.70 6 H
13.a Flange Plate A 516 Gr.70 12
13.b WEB PLATE A 516 Gr.70 6
14 Secondary Girder A 516 Gr.70 2 H
14.a Flange Plate A 516 Gr.70 4
14.b WEB PLATE A 516 Gr.70 2
15 Girder Ring A 516 Gr.70 2 H
15.a Flange Plate A 516 Gr.70 4
15.b WEB PLATE A 516 Gr.70 2
16 Girder Ring A 516 Gr.70 7 H
16.a Flange Plate A 516 Gr.70 18
16.b WEB PLATE A 516 Gr.70 7
17 Girder Ring A 516 Gr.70 2 H
17.a Flange Plate A 516 Gr.70 4
17.b WEB PLATE A 516 Gr.70 2
18 Girder Ring A 516 Gr.70 7 H
18.a Flange Plate A 516 Gr.70 14
18.b WEB PLATE A 516 Gr.70 7
19 SETTING BOLT SS400 336
20 Tbeam For Hoist A 516 Gr.70 15 T
21a Flange Plate A 516 Gr.70 15
21b WEB PLATE A 516 Gr.70 15

Total Weight D4 1833


HB 250x12,5x3x3
PL.9x125x17683
PL.9x232x17678
PL.9x125x17683
PL.15x232x163
PL.15x263x232
HB.250x125x9x9
PL.9x125x5864
PL.9x232x5862
HB.200x100x12x12
PL.12x100x5517
PL.12x184x5515
HB.200x200x8x12
PL.12x200x2291
PL.12x184x5515
HB.200x100x12x12
PL.12x100x3700
PL.12x184x3670
HB.200x100x12x12
PL.12x100x3760
PL.12x184x3730
HB.200x100x12x12
PL.12x100x1245
PL.12x184x1229
HB.200x100x12x12
PL.12x100x1090
PL.12x184x1090

PL.14x255x17683
PL.14x222x17678
PL.15x326x222

PL.14x256x5864
PL.14x222x5862
PL.15x226x222
HB.250x250x9x14
PL.14x250x2495
PL.14x250x2495
PL.15x326x222
PL.15x326x222
HB.250x250x9x14
PL.14x250x1619
PL.9x222x1599
PL.15x326x222
HB.300x300x10x15
PL.15x303x4974
PL.10x269x4817
PL.15x300x4974
PL.15x376x319
PL.15x344x298
HB.200x100x12x12
PL.12x100x3220
PL.12x176x3142
PL.15x151x184
PL.15x162x184
HB.200x200x8x12
PL.12x200x1392
PL.8x176x1384
HB.200x200x8x12
PL.12x200x1313
PL.8x176x1324
HB.200x200x8x12
PL.12x200x1251
PL.8x176x1243
HB.250x250x9x14
PL.14x250x1557
PL.9x222x1535
HB.250x250x9x14
PL.14x250x1494
PL.9x222x1473
HB.250x250x9x14
PL.14x250x2442
PL.9x222x2421
HB.250x250x9x14
PL.14x250x2382
PL.9x222x2361
M 16x60 LG
TB 250x250x9x14
PL.14x250x8482