Professional Documents
Culture Documents
Sheild Calculation
Sheild Calculation
Dated
Approved by 110/20KV SUBSTATION TAPA AHMAD BEG, Afghanistan
Contents:
1. Notes
2. References
3. Designations and Units
Checked by
Revisions
model or design, Copyright reserved for Energy &
communication of contents thereof, is forbidden
Prepared By
FOR APPROVAL
- - - - - - - - - - - - -- -
1. Notes:
2. References:
Height of Building A m
Height of shielding rod with respect to Earth (at the edge of building) P m
Height of shielding rod with respect to Earth (at the center of building roof) p m
Radius of Sphere S m
C = 12.000
4.2 Calculations:
= 3
d = 19.313
=2
r = 22.300
4.2.2 Minimum distance protected by Shield wire at a height of 6.7m (110kV Circuit Breaker height)
6.7 = 2 ( )2 2 ( 6.7)2
Rpr6.7 = 3.377
0 = 2 ( )2
Rpr0 = 19.313
4.2.4 Minimum distance protected by Shield wire at a height of 4m (Neutral Current Transformer height)
4 = 2 ( )2 2 ( 4)2
Rpr4 = 6.569
Project Title Description Project No. Date Sheet
P1402 Oct 31, 2014 6
110/20KV Substation Tapa Ahmed Beg, Shielding Calculations
Afghanistan Document No. Rev Count
P1402-EAJA 0 9
RB/W12 = ( 2)
RB/W12 = 12.662
RprBB = 2H - RB/W12
RprBB = 9.638
4.3 Diagram:
Protected through fixing shielding rods (1m spikes) using Rolling Sphere Method.
k = 1.200
A = 4.200
q = 0.300
p = 5.200
P = 5.500
T1 = 12.00
T2 = 13.50
Project Title Description Project No. Date Sheet
P1402 Oct 31, 2014 7
110/20KV Substation Tapa Ahmed Beg, Shielding Calculations
Afghanistan Document No. Rev Count
P1402-EAJA 0 9
E = 1.300
5.2 Calculations:
= 8 0.65
S = 42.882
2 2
=2 2 ( )2 2 ( ( ))2
T = 17.401
S
S
X1 S
X2
P A+q
X
X1 = 21.011
X2 = 19.123
X = 1.888
2 2
= 2 ( )2 2 ( )2
Z = 10.532
Project Title Description Project No. Date Sheet
P1402 Oct 31, 2014 8
110/20KV Substation Tapa Ahmed Beg, Shielding Calculations
Afghanistan Document No. Rev Count
P1402-EAJA 0 9
S
S
J1 S
P-A J2
p-A
1 = 2 ( ( ))2 2 = 2 ( ( )2
= 10.479 =9.207
1 2
=
2
R=9.843
2
1 2 = 21
1 = 21 2
2
1 2
3 = 2
2
Project Title Description Project No. Date Sheet
P1402 Oct 31, 2014 9
110/20KV Substation Tapa Ahmed Beg, Shielding Calculations
Afghanistan Document No. Rev Count
P1402-EAJA 0 9
T3=19.439
5.3 Diagram:
SECTION C-C