Professional Documents
Culture Documents
1 Comp
1 Comp
HUAWEI
Mobilink Lambda-9 Segregation Project
Engineering Service Acceptence Certificate
Completed
NO. POUNo. Site 10 I Route from Site Name I Route to Description UOM PO Qty. Pass I Not
Qty.
.-
Opt ix_Software Commissioning_DWDM OLA
Documents
Checked:
Remark: 1. The issuance of this Acceptance Certificate shall not relieve the subcontractor from his obligation, and subcontractor shall remove all
defects/deficiencies in accordance with specifications, construction drawings etc. until the issuance of FAC
Notes:
Subcontractor
Sll/)HZ'~
Sao7a7280
HUAWEI TE Engineer HUAWEI TE Manager
~~f HUAW ~/
i&J.J~
HUAWEI PM