Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

HUAWEI TECHNOLOGIES (Pakistan) CO., LTD.

HUAWEI
Mobilink Lambda-9 Segregation Project
Engineering Service Acceptence Certificate

Project Code 5506866 Subcontractor Name NETKOM

Subcontrac No. PACPAK271001050100A PO No. 10210027107_1

Acceptance Type COMPLETION Scope of Work HWI & SOFT COM

Start Date on PO 29-0ct-10 Completion Date on PO 29-Dec-10

Actual Start Date 29-0ct-10 Actual Completion Date 29-Dec-10

Completed
NO. POUNo. Site 10 I Route from Site Name I Route to Description UOM PO Qty. Pass I Not
Qty.

Optix_Hardware Installation_OWDM OLA

1 4224686<!>Site 7<I>Kalari OSN6800/1GOOG/Metro6100/320G3vpe 1: 1 NE 7 7 PASS


Rack_(NE:O.7]50%_Normal Work Areas (A Type)

.-
Opt ix_Software Commissioning_DWDM OLA

2 4224686<!>Site 7<!>Kalari OSN6800/1600G/Metro6100/320G_Tvpe 1: 1 NE 8 8 PASS


Rack_{NE:O.71SO%_Normal Work Areas (A Type)

Documents
Checked:

Remark: 1. The issuance of this Acceptance Certificate shall not relieve the subcontractor from his obligation, and subcontractor shall remove all
defects/deficiencies in accordance with specifications, construction drawings etc. until the issuance of FAC

Notes:

Authorised Authorised Authorised


Signature Signature Signature

Subcontractor
Sll/)HZ'~
Sao7a7280
HUAWEI TE Engineer HUAWEI TE Manager
~~f HUAW ~/
i&J.J~
HUAWEI PM

Name Syed Naveed Ahmed NameJ'fI /}IIZ/J.J) Name: Name: Name:

Date: 040ct-11 Date:


Date 0 ~-OCI-fl Date: Date:

You might also like