Existing Designs have been checked and understood for earlier
design philosophy Study and site visit of locations carried out and the available drawings correctness were checked with site measurements. Analysis of collected data & preparation of the scheme As per existing distances between technological units, they were segregated for medium velocity water spray system. The locations of hydrants and monitors reviewed and required relocation suggested and marked on the fire protection layout drawing. Capacity of fire water pumps finalised based on single largest fire as per OISD 144. Network analysis carried out for adequacy of Pipeline diameter in light of enhanced capacity of fire water pumps Other measures pertaining to safety, layout suggested for implementation or future provisions. Preliminary System design and approximate Bill of Materials finalised Approximate Capital cost estimates Financial Appraisal