Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

BD+C Rating System Credit Matrix

Rating System Matrix: IP - EA


Prereq Data Warehse. EP Design
Credit Name NC C&S Schools Retail Hospitality Healthcare
Credit Ctr. Dist. Ctr. Available Construction
INTEGRATIVE PROCESS (IP)
P Integrated Project Planning and Design n/a n/a n/a n/a n/a n/a n/a req'd. no D
C Integrative Process 1 1 1 1 1 1 1 1 no D
Possible IP Category Points Per Rating System: 1 1 1 1 1 1 1 1
LOCATION and TRANSPORTATION (LT)
C LEED for Neighborhood Development Location 16 16 15 16 16 16 16 9 no D
C Sensitive Land Protection 1 2 1 1 1 1 1 1 no D
C High Priority Site 2 3 2 2 2 2 2 2 yes D
C Surrounding Density and Diverse Uses 5 6 5 5 5 5 5 1 no D
C Access to Quality Transit 5 6 4 5 5 5 5 2 yes D
C Bicycle Facilities 1 1 1 1 1 1 1 1 no D
C Reduced Parking Footprint 1 1 1 1 1 1 1 1 yes D
C Green Vehicles 1 1 1 1 1 1 1 1 no D
Possible LT Category Points Per Rating System: 16 20 15 16 16 16 16 9
SUSTAINABLE SITES (SS)
P Construction Activity Pollution Prevention req'd req'd req'd req'd req'd req'd req'd req'd no C
P Environmental Site Assessment n/a n/a req'd n/a n/a n/a n/a req'd no D
C Site Assessment 1 1 1 1 1 1 1 1 no D
C Site DevelopmentProtect or Restore Habitat 2 2 2 2 2 2 2 1 yes D
C Open Space 1 1 1 1 1 1 1 1 no D
C Rainwater Management 3 3 3 3 3 3 3 2 yes D
C Heat Island Reduction 2 2 2 2 2 2 2 1 yes D
C Light Pollution Reduction 1 1 1 1 1 1 1 1 no D
C Site Master Plan n/a n/a 1 n/a n/a n/a n/a n/a no D
C Tenant Design and Construction Guidelines n/a 1 n/a n/a n/a n/a n/a n/a no D
C Places of Respite n/a n/a n/a n/a n/a n/a n/a 1 yes D
C Direct Exterior Access n/a n/a n/a n/a n/a n/a n/a 1 no D
C Joint Use of Facilities n/a n/a 1 n/a n/a n/a n/a n/a no D
Possible SS Category Points Per Rating System: 10 11 12 10 10 10 10 9
WATER EFFICIENCY (WE)
P Outdoor Water Use Reduction req'd req'd req'd req'd req'd req'd req'd req'd no D
P Indoor Water Use Reduction req'd req'd req'd req'd req'd req'd req'd req'd no D
P Building-Level Water Metering req'd req'd req'd req'd req'd req'd req'd req'd no D
C Outdoor Water Use Reduction 2 2 2 2 2 2 2 1 no D
C Indoor Water Use Reduction 6 6 7 7 6 6 6 7 yes D
C Cooling Tower Water Use 2 2 2 2 2 2 2 2 no D
C Water Metering 1 1 1 1 1 1 1 1 no D
Possible WE Category Points Per Rating System: 11 11 12 12 11 11 11 11
ENERGY and ATMOSPHERE (EA)
P Fundamental Commissioning and Verification req'd req'd req'd req'd req'd req'd req'd req'd no C
P Minimum Energy Performance req'd req'd req'd req'd req'd req'd req'd req'd no D
P Building-Level Energy Metering req'd req'd req'd req'd req'd req'd req'd req'd no D
P Fundamental Refrigerant Management req'd req'd req'd req'd req'd req'd req'd req'd no D
C Enhanced Commissioning 6 6 6 6 6 6 6 6 no C
C Optimize Energy Performance 18 18 16 18 18 18 18 20 yes D
C Advanced Energy Metering 1 1 1 1 1 1 1 1 no D
C Demand Response 2 2 2 2 2 2 2 2 no C
C Renewable Energy Production 3 3 3 3 3 3 3 3 yes D
C Enhanced Refrigerant Management 1 1 1 1 1 1 1 1 no D
C Green Power and Carbon Offsets 2 2 2 2 2 2 2 2 no C
Possible EA Category Points Per Rating System: 33 33 31 33 33 33 33 35

LEED Green Associate Study Guide


290 | Chapter 15 LEED v4 | 1st Edition | 2014.06.01
BD+C Rating System Credit Matrix
Rating System Matrix: MR - RP
Prereq Data Warehse. EP Design
Credit Name NC C&S Schools Retail Hospitality Healthcare
Credit Ctr. Dist. Ctr. Available Construction
MATERIALS and RESOURCES (MR)
P Storage and Collection of Recyclables req'd req'd req'd req'd req'd req'd req'd req'd no D
Construction and Demolition Waste Management
P req'd req'd req'd req'd req'd req'd req'd req'd no C
Planning
P PBT Source Reduction--Mercury n/a n/a n/a n/a n/a n/a n/a req'd no D
C Building Life Cycle Impact Reduction 5 6 5 5 5 5 5 5 yes C
Building Product Disclosure and Optimization---
C 2 2 2 2 2 2 2 2 yes C
Environmental Product Declarations
Building Product Disclosure and Optimization---Sourcing
C 2 2 2 2 2 2 2 2 yes C
of Raw Materials
Building Product Disclosure and Optimization---Material
C 2 2 2 2 2 2 2 2 yes C
Ingredients
C Construction and Demolition Waste Management 2 2 2 2 2 2 2 2 yes C
C PBT Source Reduction--Mercury n/a n/a n/a n/a n/a n/a n/a 1 no D
C PBT Source Reduction--Lead, Cadmium, & Copper n/a n/a n/a n/a n/a n/a n/a 2 no C
C Furniture and Medical Furnishings n/a n/a n/a n/a n/a n/a n/a 2 yes C
C Design for Flexibility n/a n/a n/a n/a n/a n/a n/a 1 no D
Possible MR Category Points Per Rating System: 13 14 13 13 13 13 13 19
INDOOR ENVIRONMENTAL QUALITY (EQ)
P Minimum Indoor Air Quality Performance req'd req'd req'd req'd req'd req'd req'd req'd no D
P Environmental Tobacco Smoke Control req'd req'd req'd req'd req'd req'd req'd req'd no D
P Minimum Acoustic Performance n/a n/a req'd n/a n/a n/a n/a n/a no D
C Enhanced Indoor Air Quality Strategies 2 2 2 2 2 2 2 2 yes D
C Low-Emitting Materials 3 3 3 3 3 3 3 3 yes C
C Construction Indoor Air Quality Management Plan 1 1 1 1 1 1 1 1 no C
C Indoor Air Quality Assessment 2 n/a 2 2 2 2 2 2 no C
C Thermal Comfort 1 n/a 1 1 1 1 1 1 no D
C Interior Lighting 2 n/a 2 2 2 2 2 1 no D
C Daylight 3 3 3 3 3 3 3 2 no D
C Quality Views 1 1 1 1 1 1 1 2 yes D
C Acoustic Performance 1 n/a 1 n/a 1 1 1 2 no D
Possible EQ Category Points Per Rating System: 16 10 16 15 16 16 16 16
INNOVATION (IN)
C Innovation 1 1 1 1 1 1 1 1 n/a D/C
C Innovation 1 1 1 1 1 1 1 1 n/a D/C
C Innovation 1 1 1 1 1 1 1 1 n/a D/C
C Innovation 1 1 1 1 1 1 1 1 n/a D/C
C Innovation 1 1 1 1 1 1 1 1 n/a D/C
C LEED Accredited Professional 1 1 1 1 1 1 1 1 n/a D/C
Possible IN Category Points Per Rating System: 6 6 6 6 6 6 6 6
REGIONAL PRIORITY (RP)
C Regional Priority 1 1 1 1 1 1 1 1 n/a D/C
C Regional Priority 1 1 1 1 1 1 1 1 n/a D/C
C Regional Priority 1 1 1 1 1 1 1 1 n/a D/C
C Regional Priority 1 1 1 1 1 1 1 1 n/a D/C
Possible RP Category Points Per Rating System: 4 4 4 4 4 4 4 4
Possible Total Points Per Rating System: 110 110 110 110 110 110 110 110
Certified: 40-49 points Silver: 50-59 points Gold: 60-79 points Platinum: 80-110 points

LEED Green Associate Study Guide


LEED v4 | 1st Edition | 2014.06.01
Chapter 15 | 291

You might also like