ML P1 4003 CO 7 000 T SAM 0081 Paving Tiles at Zone 13 Comments 18-9-2016

You might also like

Download as pdf
Download as pdf
You are on page 1of 9
wontanenelt ESP went Hin international GSS Meuse BBollywood i PROJECT: : BOLLYWOOD PARK AREA DEVELOPMENT Reference No, client 7 Dubai Parke & Resorts PSC Micbtanoe 7 erent: client Rep. : Samsung C&T Project Consultant + DEC Dynamic Engineering Consultants for C&> Contractor : Al Ryum Cont. & Gen. Transp. Est. - Date 11.09.2016 MATERIAL SAMPLE TRANSMITTAL SHEET F-DOCUNEN MATERIAL SAMPLE FOR PAVING TILES AT ZONE-13 NEAR BOLLYWOOD BOI Tivos Sotonen Tite cao Tite Des ges soot | © Peace fz. DOCUMENT DETAILS Item No. | Transmittal Ret. Document No. Description [Sppies 1 | mePts00s.c0-.000-7-Same MATERIAL SAMPLE FOR PAVING TILES AT ZONE-"8 NEAR Park, 00st lBouLevanO EAST Projpet are tanemitted for Tier Tlasrewa coment Peron 8 Sirwire Tasteansel Cromton record —— CJacenince | 2% Caercartionnesz | CO Forvou se Cowes Qh es ore PRouecr VELOPMENT WORK psn ob esis —t [Contractor Project Manager : NEIL JOHNSTON, fr |stonature: DEC Comments: Myra veel 0) Noa (fe feted snipe Lex se bil Blake Carte be « pues x4 Sadek 1S mint ysis » _ an 1S put saute ye M L de en rmban few Approved As Noted D— Revise and Resubmit —O._Rejected DEC Resident Engineer pate: AV 9 Qe, [Feet otros Coast os atten une a Ona ato ay Saas Coteaa Bosses Construction Submittal HEE GA sawsunc car From ALRYUM Material Sampo for Paving DEC Dynamic Engineering Description Construction & Constants ‘os at Zone-13 near Bohywood Seneral Transport Boulevard Eat, Estaisnment Submited Date 11-Sep-16 Rajeov Pazhoot Attention Fac Haddad Submitatt ML 4009.7-cSM.00747 ConiractoriConautont Salus Recipient Remarks TI Forinformaton (__Ackrowedged Joate T1__ForAecopiance T__Aecepiea ic (__ForRevew and Comments | __[] Accepted as Noted [seston T__ Feracion T___ Revise and Resubmit [contact Rejected Rocepient’s Comment: {Latest Workflow Comment: Issued via wort on: tsepts [Recieved by : Please sign and return a copy to the sendor Iva [signature soft Penta on 8112046 2:10:60 PM Pitne gure nanats 2 GD ww: Hill International gec see BBollyusood Ye |PROJECT: : BOLLYWOOD PARK AREA DEVELOPMENT Reference No. lee Dabat Parke & Rewors PISC MUPr somo anoTsaM. Ictient Rep. Samsung C&T Project Consultant DEC Dynamic Engineering Consultants noe on contractor ‘AL Ryum Cont. & Gen. Transp. Est. Date 04.00.2016 MATERIAL SAMPLE TRANSMITTAL SHEET MATERIAL SAMPLE FOR] inet atone Ti tet contane Titeror ~ oes Tomes / Sect Material Sample lz. DOCUMENT DETAILS Item No. | Transmittal Ref. / Document No. Description Copies MLP1-4008.00.7-0001r-SAM- MATERIAL SAMPLE FOR PAVING TILEG)AT ZONE-ISNEAR BOLLYWOOD] 1 ‘00081 IBOULEVARD EAST 1050 are transmitted for Trevor & Comment Tropoale Seratre Titstonmnes | Ghntrmation 8 Record “ial 04 SEP 2016 \ No J he Le cpporrd) poh =.= Clo Clk oot hey be provield Sem - 4 f ewan shpdtara. 6 woe Va status Approved -pproved As Noted JY Pevioe and Resubmit, Rejected DEC Resident Engineer:- vate: T9 2w\, Lunn ne oy ea -| Construction Submittal rom ALRYUM Te: DEC Dynamic Enginesring Description ‘SAN-00081_Matoral Sample for Paving ‘Construction & Consultants Tiles at Zoné-13 near Bollywood Boulevard East Establishment Submitted Date 04-S0p-18. Rejoew Pazhoor Attention Fai Haddad ‘Submittals ML.P1.4003.1-CSM-00747 ContractoriConsultant Status Recipient Remarks For information Tl _ Acknowiedged bate T_ For Acceptance T__Aecopted [rine 1 ForReview and Comments Accepted as Noted Location T__ ForAction Revise and Resubmit [Contact| Rejected TML-PY-4008-C0-7-0001-SAN-00085 Mataral Semple or Paving Ties at Zanest3 naar Bolywood Bolovard East [Submitters Comment: Recepient’s Comment: Latest Workflow Comment: Response isued vawersfow on: 04 p46 Please sign and return a copy tothe sender [Recieved by : [signature : ‘Brom bs tnd ted re | emma | eeepc hd Dec cae dy i cnnsererite petites 4 mamane [rmumacaintin | cgay wea | Mroetemmnton | caxnaseneoniin en ed a states wo | Meet [snarene | eRe | oomnuerim | soweaaieraoe | apacae entra tn poxmiriowine maetestrettan | seme nten ow tee | eran mie | ena Tom] No ome meen wm | Sieact aie” | MPI em Some Tone xe on [eee [exnreuenn | sitcom | emeiiainonn | amwentsciinro | oeaecrany van | momsreron | exnaneseenais | tM oRreRc a fectmancnmi of ouinanccata wen | — eng “oan mi ‘eee om ‘tm _ ra | Mroeatmeton | cpaneaaenany peulsettetaacs | womans | smawtccade tow |r meamaeg vs emtrcton [annamenance pancegta — sretnattcnnts | aetna | asta rae | rometenton | evnsessonseo | MERINO | sortsnouna in [aroma tion | ace vo | Preonnion leprarcanscm | sansa mmacpwint of sorwmacitn tor | open ‘nd ‘tte ‘son cm “Beant tng acto, ‘ein fovo-smecracume] "omeeenttndpance? | PatAnoienon tec died Seni fen ten et Tocinrtspeet | "Sectarcanhpasnerwahnosaona sara wanes obese (820) OLLYWOdD BOULEVARD WEST (AER TDFACUGE DNS (@-102) OLLYW000 BOULEVARD EAST TFT sO, ayant tot he Setopent- HC ANCL wARVOLUME: EADY A.O-2ND LIE TON S417 MA om LDN swnsunc cer TRANSMITTAL FORM STRICTLY CONFIDENTIAL Project Ref: 4003 ~ Bollywood Date; ii” May 2016 | Contract: DPDP-LE-4003/CW-Mc-12 Trans Ref; Ml-P1-4003-CO-7-000-J-TRA-01492 To: ‘Al Ryum Construction & General Attention: Mr. Neil Johnston Trpt. Establishment Subject: _AD-BLWD- Paving Color Aggregates (BLWD BLVRD) Issued ‘Type of Docume: CO original BZ For information OO tetters OO copy (1 For Review and comment Ba brewing / sketch O ara LZ For coordination report / Manuals Soft CO other Qty | Document Number | Rev | Description POF | N/A 00. | A0-Buwo- Paving Color Aggregates (BLWD BLVRD) Comments / Remarks Please find attached BW ZONE 110-17 map and a cleaned up excel spread sheet of paste & seed formulations as per zone to clear up any confusion. ‘This is final P-09 & P-10 call outs for your coordination purpose. ‘On behalf of Samsung C&T: (Fundelvered, please return te Samsung C&T Name: Nicholas Ferrante, Delivery Manager err ar Ur fe P.O.Box. 214852 Signature: ace Gates | Babel UAE Copies to: Mr. Fadi Haddad - DEC Please sign and return a copy to the sender Received by Name: Signature: PRC-100-01-4 CENT PROJECT MANAGEMENT | CONSULTANT ‘CONTRACTOR PROJECT NAME: Bollywood Park - Area Development, Dubai Parks and Resorts 2 Cet ne Ge et ‘SUPPORTING DOCUMENT REFERENCE: Date: 04-09-2016 usa ates esonts itt ant DYNAMIC ITEM REFERENCE No LOCATION TTEM DESCRIPTION ‘QUANTITY | _COLOUR DRAWING REF REVISION “APPPROVAL MATERIAL SAMPLE FOF PAVING TILES AT BOLLYWOOD AREA ‘ omen _— wast _ _ FUT COMMENTS "APPROVAL,

You might also like