GVQ Level 3 Unit 011 Questions

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Unit 011 Clean and Prepare Complex Items of

Plant/Equipment for Production in Processing Industries


Operations
K1. What is the importance of having the necessary authority to
complete the work:

K2. What is the meaning of terms used in the specification


concerned with cleaning:

K3. What are the methods of shutdown for the operation:

K4. What is the importance of shutting down services not


required by SOPs:

K5. What is the importance of keeping relevant personnel


informed:

K6. Why it is important to minimise any loss/damage during


shutdown

K7. What are the methods of dealing with waste and /or residual
materials:

K8. How to handle equipment safely in ways that protect yourself


and others from risk:

K9. What is the importance of checking you have the right


documentation:

K10. What is the importance of confirming status of


plant/equipment:

K11. What documentation needs to be obtained:

K12. Why it is important to check that plant and equipment is


clean and operational:

K13. What is the importance of checking the status of the plant


and equipment:

K14. Why it is important to identify any `areas of concern':

K15. Why it is important to record all information accurately:

K16. Why it is important to confirm and record the status of the


plant and equipment:

K17. Why it is important to communicate with relevant personnel:


K18. What are your personal responsibilities with regard to
health, safety and
environment:

K19. What personal protective equipment to use and why:

K20. What are the types of problems that can occur and how to
recognise and deal with
them:

K21. Who to contact if there is an unsolvable problem and/or it is


not your responsibility:

K22. What are the methods of documentation that are used:

K23. Why it is important to complete documentation accurately