Public Works Department — Infrastructure Development Works as part of
Special Investment Scheme — Sanctioning of Investigation Estimates of works
under KIIFB — Guidelines - Orders Issued.
PUBLIC WORKS (G) ao
G.O.(Rt) No. 1619/2016/PWD. Dated, Thinuvananthapuram, 23.11.2016
Read:- 1) GO(RI) No.241/2014/PWD dated, 17.02.2014 :
2) GO(Rt) No. 1192/2016/PWD dated, 20.08.2016.
3) GO(Rt) No. 1496/2016/PWD dated, 31.10.2016.
4) GO(Rt) No. 1502/2016/PWD dated, 01.11.2016.
5) Lt.No.CE/R&BINC/Investigation/2016 Hated, 01.10.2016 from Chief
Engineer (R&B).
6) LrNo. CE/R&B/GL/KIFB/INvi2016-17. dated, 28.10.2016 from
Chief Engineer (R&B).
As per the Government Order read| as second paper above
Administrative Sanction. was accorded for the 76 road works for a total
amount of % 1271.00 Crore, as per the Government Order read as third paper
above Administrative Sanction was accorded for 75 bridge works for a total
amount of % 1435.00 Crore, and as per Government Order read as fourth
paper above Administrative Sanction was a Sok for 100 road works for a
total amount of & 1815.00 Crore, as part of Special Investment Scheme for
availing funds under Kerala Infrastructure Invastment Fund Board (KIIFB)
Kerala Road Fund Board is the Special Purpose Vehicle for executing the
above works.
It has been decided that all works under KIIFB Scheme shall have a
Detailed Project Report, based on proper and required investigation data as
the works under this scheme will have technical audit at higher level. Hence
it is proposed that all projects under KIIFB scheme will be covered by
required investigation for preparation of DPR. |
‘As per the letters read as 5” and 6” paper above, Chief Engineer
(R&B) has requested to sanction the investigation estimates of works
sanctioned vide letters read above.
Government have examined the matter in detail and are pleased to
issue the following guidelines with respect to the sanctioning of the
investigation estimates for the preparation of DPR for the works sanctionedfe ru eax 3390898 BMC
1, Items appt
preparation of DPR of roads/bridges are givel
i, Provision for Benkelman beam deflectio
proposals of roads.
ii, Provisions for Total Station Survey
proposals of roads.
iti. a for Califormia bearing ratio
|
jorks for investigation/Survey
proposals of roads.
iv. Provisions for detailed soil investigation
for Bridge projects.
2. The cost of the investigation will be met at the
GO read gs 1"
aper above.
3. The items in which investigation is needed ant
the prevailing rate followed by Kerala Highwa
adopted.
4. The cost of all in
viz. the admi
Executive Ste
5. The Chief ngineer concerned will ensure thal
conduct abpve investigation are fully utilised f
spareable for conducting investigation for KI!
f
|
vestigations will be met from
inistrative and project cost alloted
To |
The Chi
The Chief Executive Officer, Kerala Road
Mayooram, Belhaven
The Joint Fund Manager, Kerala Infrastruc’
Bpard,|4" Floor, India Heights, Govt
zhuthacaud, Thycaud P.O, Thit
Vi
The et General (A&E)(Audit),
DEPUTY secR
Kowdiar Post, Thiruvananthapuram
@oooz
foved| by Finance Department admissible for investigation for
,
below:-
test for investigation/Survey
test for investigation/Survey
orks in the case of proposals
approved rates issued vide
id for which there is no rate,
ty Research Institute will be
the admissible fund of KRFB
lo KRFB operated by Chief
the in — house capability to
r other works and are not
iB works,
By Order of the Governor),
T.R.JAYAPAL
ETARY TO GOVERNMENT
ws Engineer, PWD (Roads & Bridges), Thiruvananthapuram,
und Board,TC 4/1654,
ardens,
~ 695003.
lure Investment Fund
\Women's College Road,
nanthapuram - 695014.
Kec Thiruvananthapuram.
‘The Finance Department. (Vide UO.No.326202/Ind &PW83/16/Fin
dated, 17.11.201:
The Public Works (H)/D Department
Stock File/Office Copy/Website.
Copy to : PS to Minister (Works)
PS to Addl.Chief Secretary, PWD
6 and 23.11.2016)
Forwarded / By Order