Detail of Lift Handle: Department of Public Works and Highways
Detail of Lift Handle: Department of Public Works and Highways
50
3.05 m
1.50 3.05 1.50
+ WIDENING
s% e% e% e%
SPACED @ 2.0m HOR.
& 1.0m VERT., STAGGERED
H
NATURAL GROUND
NOTE :
ITEM 300 AGGREGATE SURFACE COURSE, t = 0.15m. B=0.57H PROVIDE LIFT
ITEM 311(1a) PCCP (PLAIN), t = 0.23m. 0.60 min. 250 HANDLE AT
EVERY 15m.
ITEM 200 AGGREGATE SUBBASE COURSE, t = 0.35m.
ITEM 311(1b) PCCP (PLAIN), t = 0.15m. REQUIRED MINIMUM DESIGN THICKNESS OF PCCP = 198.50mm
100 ADOPT THICKNESS OF PCCP = 230.00mm
150
730
65 80
150
3.05 m
GROUT
1.50 3.05 1.50
5mm
+ WIDENING
4
s% e% e% s%
NATURAL GROUND 1000
5
ITEM 103-3 FOUNDATION FILL, t = 0.10m 1300 BAR BENDING DIAGRAM OF CONCRETE U-DITCH
ITEM 103-3 FOUNDATION FILL, t = 0.10m
100
REINFORCING STEEL BAR = 52.15 KGS./LN.M.
1200
CONCRETE = 0.67 CU.M/LN.M
420 370
630 1000
SCALE NTS 1 2 3 4 5
1150
EDGE OF PAVEMENT
width = 0.10 m.
ROADWAY
Width = 0.15 m. BAR SUPPORT
0.30m
6.10 m 0.30m
LONGITUDINAL JOINT
0.30m
Width = 0.15 m.
Width = 0.15 m. 0.30m
Length = 3.0m.
0.30m
0.60m
0.75m 0.75m 0.75m 0.75m 0.75m 0.75m 0.75m 0.75m 0.75m 0.75m 0.75m
0.60m
0.375m
width = 0.10 m.
0.60m
3.05m TRANSVERSE CONST. JT.
GENERAL NOTES:
700
1. MATERIALS AND WORKMANSHIP SHALL COMPLY WITH
NUTS & WASHER
SHOULDER SURFACE STANDARD SPECIFICATIONS FOR HIGHWAYS AND
BRIDGES REVISED 2013. 1 21 ' x 61 ' G.I. FLAT BAR
300mm x 300mm CONC. POST
600
PLAN LO = 1800m
MINIMUM
MACHINE BOLT.
MINIMUM
PAINTED W/
1500
REFLECTORIZED
SUNSHINE YELLOW
W/ RED LEAD
BASE PAINT
NOTE: THE DISTANCE "d" BETWEEN GUARDRAIL POST AND EDGE SHOULDER
OF SHOULDER WILL DEPEND ON THE THICKNESS OF THE
PRE-FAB STEEL FLEX BEAM
SHOULDER PAVEMENT AND THE SLOPE AT WHICH IT WILL
INTERSECT AT THE TIP.
d CONCRETE POST
PRE-FAB STEEL
FLEX-BEAM 200
10
10
230
230
500
CONCRETE CLASS "A"
25
300
230
BOLT HOLE BOLT HOLE
SEE DETAIL
200 X 200 ELEVATION
131
CONC. POST
t
SEE DETAIL
312
DETAIL OF INSTALLATION OF CHEVRON
1700
1700
SCALE NTS
131
1470
1470
NOTE :
TIES SPACED
25
EQUALLY
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED.
2. LATERAL OFFSET (LO).
3. TWO (2) ADJACENT CHEVRON ALIGNMENT ON ONE (1) G.I. PIPE POST.
FLEX-BEAM DETAIL
TYPE "GR-A"
SECTION ELEVATION POST
159 540
200
200
131
200
200
254
SPACED EQUALLY
131
76
SECTION POST
25
SINGLE b 1.51
A
A'
DOUBLE b 3.21
t
0.50
SCALE NTS
b
2000
1000 1000
t I.D. t
SCALE NTS c c
c
t
3.66m
500
0.50
1000
500
3.05 m
1.50 3.05 1.50
0.50 + WIDENING
I.D.
300 500
NATURAL GROUND
e% e% e% s%
FILTER CLOTH
SPACED @ 2.0m HOR.
H & 1.0m VERT., STAGGERED
H
t
c
s%
1.26m 1.26m
0.60 min. B=0.57H 0.60 min.
B=0.57H
SCALE NTS
ITEM 311(1a) PCCP (PLAIN), t = 0.15m
SCALE NTS
ITEM 103-3 FOUNDATION FILL, t = 0.10m
ITEM 311(1a) PCCP (PLAIN), t = 0.23m.
ITEM 200 AGGREGATE SUBBASE COURSE, t = 0.35m.
ITEM 311(1b) PCCP (PLAIN), t = 0.15m
Top
3.05 m of O
1.50 3.05 1.50 0.50 rigin C+0.30m.
+ WIDENING al G
roun
NATURAL GROUND
d
e% e% s% 0.15 0.20
e% 0.30
SPACED @ 2.0m HOR. 0.30
& 1.0m VERT., STAGGERED
C
H 1.80
SEE DETAIL OF CATCH BASIN
LINED CANAL FLOW LINE D/3 LINED CANAL D/3 LINED CANAL 1.30
FLOW LINE FLOW LINE
s% CONCRETE CATCH BASIN DIMENSION FOR RCP/CSP
C C+0.30 C+0.30
SCALE NTS
e% s%
e%
e%
NATURAL GROUND
0.50
-3.00 % -1.50 % -1.50 % -3.00 % -3.00 % -1.50 % -1.50 % -3.00 % NATURAL GROUND
e% e% s%
e%