Name of stakeholders: following are the stakeholders that I have consideration

in design

Name of Role in project Type of Interests and Expectatio


stakeholder stakeholder interest rate(1-5) ns
s
M.I.T Providing Primary Interest in project Reliable
managemen detailed Stakeholder( output.so that and
t (client) requirements As they are they can provide quality
of desired directly better product
product affected by accessibility to
manager. the project students and staff
Get in touch outcome) members in
with faculty classrooms.
and students
to listen their Interest rate: 5
problems
regarding
space and
furniture
availability in
classrooms
students Explaining the Primary They have higher Actual
and problem to stakeholder interest in the product
teachers(pri M.I.T project outcome should be
mary users) management because they are better
that they are the one who will than
facing with use the product current
current on daily basis. one.
available Interest rate: 4
furniture in
classrooms
Project Identify and Direct Has higher Satisfying
manager resolving any stakeholder interest because the
project issue. (they assist after successfully customer
To make sure with day to completions of s
successful day activities project requireme
delivery of of project) Might get nts. And
product on some deliver the
time and on incentivise product on
budget. at the end time and
Understandin of project. on budget.
g the end user Improves
concerns their work
history and
self-
satisfaction
.
Can get
more and
better
opportuniti
es in future.
Interest rate: 5
Skilled Follow the Secondary Have higher To get
workers instructions of stakeholder interest because:- proper
project ( As they As they do and
manager/supe assist with well in detailed
rvisor. administrativ product plan.so
Commitment e process and manufactur that they
to health and responsible ing. They can work
safety. for could get continuou
Follow the beneficiaries) long term sly on
project plan in job security project to
fabrication of and pay meet the
product. rise. project
Interest rate: 3 requireme
nt.

End Not directly Indirect Have little Product


user/market involved in stakeholder interest in should run
stuff project. project longer.
One who will outcome
promote our because
design they are
product not primary
user of
product.
Interest rate: 3
Project contract

PROJECT AGREEMENT
BETWEEN: - M.I.T management and Rohit Harchand (NZDE MECHANICAL)
PROJECT: - Space saving study desks.
LOCATION: - P Block at M.I.T otara campus, Manukau, Auckland
SCOPE AND NATURE OF SERVICES:- To design and fabricate a space saving
study desks for the room P209 which is square in shape and has
dimensions 275W and 190D.
The desk should be light weight (no more than 5 kgs), durable (staying in
good condition for at least 6 years), should be strong (can hold up to 150
kgs of weight)
Currently only 20 students can sit in classroom because according to
current scenario the Existing desks occupy most of the space in
classroom.so its difficult to fit another desk in the classroom.
Nature of services:-To build and fabricate such space saving desks for
students so that 25 30 students can sit comfortably in the proposed
classroom. The desk design will be multipurpose portable desk that can be
adjusted to different height, angle and fold. We fabricate the desk with
minimize the manufacturing cost

Selection criteria