Solutions available in context of high rise buildings
Climbing formwork for wall
IIT Delhi
K N JHA Department of Civil Engineering
Formwork needs to be designed & built accurately so that the desired size,
shape position, correct location, quality and finish of acceptable quality of
the cast concrete are attained.
Quality
Common defects due to poor formwork quality
2. Poor Construction Joint /Offsets in Concrete Joint
IIT Delhi
K N JHA Department of Civil Engineering
Quality
Common defects due to poor formwork quality
3. Plywood Grains Stuck on the Concrete Surface
IIT Delhi
K N JHA Department of Civil Engineering
Safety
7
In Building Construction
60% Failure due to Formwork Collapse, Shoring
Collapse, Inadequate Shoring & Lateral Bracing
IIT Delhi
8% due to premature removal of shore.
18% Failure is due to faulty materials.
IIT Delhi
K N JHA Department of Civil Engineering
Another view of the portion of the slab which failed
due to concrete overloading (note the buckled props)
11
IIT Delhi
K N JHA Department of Civil Engineering
Another view of the portion of the slab which failed
due to concrete overloading
12
IIT Delhi
K N JHA Department of Civil Engineering
View of portion of slab and beam formwork which
collapsed
13
IIT Delhi
K N JHA Department of Civil Engineering
Another view of portion of slab and beam formwork
which collapsed
14
IIT Delhi
K N JHA Department of Civil Engineering
Wall Formwork
IIT Delhi
K N JHA Department of Civil Engineering
Fig__Traveling Climbing Formwork System
IIT Delhi
K N JHA Department of Civil Engineering
Fig__L&T-Doka Wall Formwork with Traveling Climbing System in
Use for the Construction of LNG Tank for M/s Punj Lloyd Ltd. Site
ate Dabhol (Diameter of the Tank 80 m, Shutter Panel Size 4m x
3.8m, Height of Tank = 40m.
Fig_____L&T WALL FORMWORK WITH TRAVELING CLIMBING
SYSTEM IN USE FOR THE CONSTRUCTION OF LNG TANK
IIT Delhi
K N JHA Department of Civil Engineering
FOR M/S. PUNJ LLOYD LTD., SITE AT DABHOL. (DIAMETER OF THE
TANK 80M, SHUTTER PANEL SIZE 4M x 3.8M HEIGHT OF TANK 40M)
CB 240 and CB 160 System
18
In CB 240
system, the
formwork is
IIT Delhi
mounted on a
carriage and
can be moved
In both the
IIT Delhi
systems, the
formwork is
moved to the next
formwork is supported on a
mobile carriage which can be
retracted up to a distance of
IIT Delhi
900 mm. system can be
climbed either with the crane
or lifted by means of mobile
IIT Delhi
This system has
climbing mechanism
IIT Delhi
K N JHA Department of Civil Engineering
L&T Doka at RCC slab casting Doka Flex for Waffle slab at Bangalore
Source: L&T
Gridflex Aluminum Grid Slab by PERI
23
IIT Delhi
K N JHA Department of Civil Engineering
Skydeck aluminum panels Detail view of Skydeck panel slab formwork
Source: PERI
Multiflex Girder Slab by PERI
24
IIT Delhi
K N JHA Department of Civil Engineering
Multiflex girder slab Detail view of Multiflex girder formwork
Source: PERI
Beam & Slab system by MIVAN
25
IIT Delhi
K N JHA Department of Civil Engineering
MIVAN formwork is the lightweight panel made of extruded aluminum rail
section and welded to aluminum sheet.
Good stiffness to weight ratio and ensures minimal deflection.
Beam & Slab system by MIVAN
26
IIT Delhi
Delivers total quality work increases concrete durability.
4 to 5 day cycle for floor-to-floor construction- Profitable.
IIT Delhi
setting out line
IIT Delhi
Wall form >
IIT Delhi
K N JHA Department of Civil Engineering
Top of deck Details of deck erection
Construction steps for MIVAN
30
IIT Delhi
K N JHA Department of Civil Engineering
Construction steps for MIVAN
31
IIT Delhi
spacer and vertical soldier. The vertical soldier is used to
maintain the verticality of beam side by using tie rod and wing
IIT Delhi
K N JHA Department of Civil Engineering
Step 9: Striking of wall
formwork
Flying formwork
33
IIT Delhi
further relocated at new location with virtually no disassembly
of parts to form concrete elements.
IIT Delhi
A typical flying formwork consists of sheathing member
Step-1
Forms are preassembled at ground level
Entire assembly is lifted and placed on existing floor or at
IIT Delhi
desired level by crane and hoist line.
Step-2
Form assembly Is then moved and placed into exact
position by movable dollies.
IIT Delhi
K N JHA Department of Civil Engineering
Flying Formwork Cycle
Step-3
Form assembly is adjusted to correct height and attached
firmly with other modules.
IIT Delhi
Reinforcement steel is fixed and electrical, mechanical and
plumbing work is done.
Step-4
Form assembly support systems are lowered to bring the
form down.
IIT Delhi
This process is done by the hydraulic jacks places under the
formwork.
Step-5
Then the form assembly is moved to the edge of the
support system by dollies.
IIT Delhi
Special attention on its movement has to be given.
Step-6
Form assembly tilts when about half of assembly is out of
the floor slab.
IIT Delhi
Again the formwork is hoisted to the upper level fot the
next cast.
IIT Delhi
construction.
Used primarily for multi- storey building (such as
Table
formwork
being flown to
IIT Delhi
its new
location
Table
being
formwork
positioned
Table formwork
Transportation
arrangement
for table
IIT Delhi
formwork
Extensive use
of Table form
at Oberoi
IIT Delhi
Mall Project
Site Mumbai
(Courtesy
Table module
being shifted
to new
IIT Delhi
location (Note
the props in
folded
Table module
being
transported
IIT Delhi
using crane
(note the
lifting fork)
Table form
being shifted
on trolley to
IIT Delhi
the desired
location
IIT Delhi
The modules are available in four standard sizes
which allow optimal adjustment to the building. The
PERI Uniportal
Table form
IIT Delhi
K N JHA Department of Civil Engineering
Table swivel head
51
Table swivel
head used in
props
IIT Delhi
K N JHA Department of Civil Engineering
Skytable form -PERI
52
Skytable form
(see the
trusses)
IIT Delhi
K N JHA Department of Civil Engineering
Tunnel form
Fixed bracing.
Need to dismantle into smaller modules before reuse.
IIT Delhi
K N JHA Department of Civil Engineering
Tunnel form
IIT Delhi
K N JHA Department of Civil Engineering
55
Tunnel
system
formwork
Tunnel formwork system
Construction
of starter wall
for the tunnel
IIT Delhi
formwork
system
Placement of
tunnel form in
progress
IIT Delhi
K N JHA Department of Civil Engineering
Construction steps-Tunnel formcontd.
58
Tunnel form
(window)
IIT Delhi
K N JHA Department of Civil Engineering
Construction steps-Tunnel formcontd.
59
Heating
equipment in
position for
IIT Delhi
the tunnel
form work
Column
mounted
shoring system
IIT Delhi
(Courtesy
Formwork
Shoreall
Column
mounted
shoring system
IIT Delhi
(Courtesy
Formwork
Shoreall
IIT Delhi
K N JHA Department of Civil Engineering
64
Shoring and reshoring explained
IIT Delhi
removed from a small area without allowing the
Assumptions
Shores and reshores are infinitely stiff relative
made in the to the slabs.
simplified
Slabs interconnected by shores therefore all
IIT Delhi
analysis
deflect equally when a new load is added, and
carry a share of the added load in proportion
IIT Delhi
K N JHA Department of Civil Engineering
live load, and self weight of formwork, shores,
and reshores considered
Computation of strength of concrete slab at a
given point of time
69
IIT Delhi
K N JHA Department of Civil Engineering
Modification factor
Strength Calculation 1
t
f ct = f ck
(a + b t )
Source: ACI209R-92
IIT Delhi
Where,
f ct is compressive strength at time t ( days elapsed) after casting
Type of Type of a b
Curing Cement
Moist Curing Type I 4.0 0.85
Type III 2.3 0.92
Steam Type I 1.0 0.95
Curing Type III 0.7 0.98
Solution steps
IIT Delhi
Step 2: Allowable loads on the slabs
Step 3: Comparison between the values obtained
71
Comparing allowable v estimated load
72
IIT Delhi
the latter is always less than the former.
IIT Delhi