NAME OF PROJECT : 17HH0010 - Construction / Maintenance of Flood Control Mitigation Structures

(SWIMP), Brgy. Sirao and Brgy. Malubog, Cebu City

SCOPE OF WORK

ESTIMATED DESCRIPTION UNIT TOTAL COST PER


ITEM NO. UNIT
QUANTITY W/ UNIT PRICE IN PESOS COST ITEM
FACILITIES FOR THE ENGINEER
A.
Provision of Combined Field Office,
A.1.1(6) 3.00 mos Laboratory and Living Quarters Building
for the Engineer (Rental Basis)
OTHER GENERAL REQUIREMENTS
B.

B.3 1 L.S. Permits and Clearance

Occupational Safety and Health Program


B.7 3.00 mos

Mobilization / Demobilization
B.9 1 L.S.
EARTHWORKS
C.
Structure Excavation, Common Soil
103(1)a 672 cu.m.

DRAINAGE AND SLOPE PROTECTION


G.
STRUCTURES
404(1)a 1,102 kgs Reinforcing Steel, Grade 40

Structural concrete, Class A


405(1)a3 32 cu.m.

Stone Masonry
506(1) 1,223 cu.m.

TOTAL IN FIGURES :

TOTAL IN WORDS :

DURATION OF PROJECT :

SIGNATURE :
NAME & TITLE OF SIGNATORY :

SIGNATURE OF WITNESS :
NAME OF WITNESS :

SUBSCRIBE TO AND SWORN before me this _______ day of ________________ 2017.

Affiant exhibited to me his/her Community Tax Receipt No. __________________ issued


on ________________ 2017, at ________________, Philippines.

Doc. No. ,

Page No. ,

Book No. ,

Series of 2017