Beton IVAN Model

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

IZGLED MOSTA 6100 PRESEK U POLJU PRESEK NAD OSLONCEM

68.00 mnm

475
800 800 2900 800 800

60.00 mnm

690
125 440 125

1200 3000 1200


5400
270
63.25 143.5 63.25
600 600 800 700 700 800 600 600
PODUZNI PRESEK MOSTA

110

110
68.80 mnm

35
40

40
2.5% 2.5%

22 27

22 27
185
50 50 50 50 50 50 50

100 64.75 mnm 100

100
200 200

180

180
1150 300 1150

615

150
100 100 100 100
150

150
60.00 mnm

400 400
150

150
60 145 115 90
30 350 30
300 300 410

300
100100100
300
POGLED ODOZDO OSNOVA STUBOVA
30

100
40
430
510

500
700
40

BETONSKI MOSTOVI

100
30

PREDMETNI NASTAVNIK: KANDIDAT:

DR. SNE ANA R. MA OVIC

KVALITET MATERIJALA DATUM: OVERA:

MB 40 R 1:200/50 297x735 18.03.2017.

You might also like