NRI SLAG LINE No.

3 PROJECT

BILL OF QUANTITY
SLAG LINE No. 3
(PT. OTSUKA-TEC INTI PRIMA)

DOCUMENT NO. :
CONTRACT NO. :
CONTRACT DESCRIPTION : SLAG LINE No. 3
DRAWING REFERENCE :
MATERIAL CLASSIFICATION : N/A

0 21-Mar-2017 Issue For Reference IVN


Rev Rev Date Description Prepared By. Reviewed
NE No. 3 PROJECT

OF QUANTITY
G LINE No. 3
A-TEC INTI PRIMA)

Reviewed By. Approved By.


5 of 25 .

CA

CLIENT PT. NICHIAS ROCKWOOL INDONESIA


NRI SLAG LINE No. 3
STRUCTURE NRI SLAG LINE No.3

A REKAP VOLUME NRI SLAG LINE No.3

NO. DESCRIPTION
Steel Structure Job (ST01)

1 Primary Main Frame (FR 01-01)


2 Secondary Main Frame (FR 02-02)
3 Conveyor 1 (BC 01-03)
4 Conveyor 2 (BC 02-04)
5 Conveyor 3 (BC 03-05)
6 Support Conveyor (SP 01-06)
7 Magnet Separator Bulding (BL 01-07)
6 of 25 .

CA

CLIENT PT. NICHIAS ROCKWOOL INDONESIA


NRI SLAG LINE No. 3
STRUCTURE NRI SLAG LINE No.3

JUMLAH
JUMLAH
7 of 25 .

CA

CLIENT PT. NICHIAS ROCKWOOL INDONESIA


NRI SLAG LINE No. 3
STRUCTURE NRI SLAG LINE No.3
8 of 25 .

CALCULATION SHEET BY PT.OTSUKA-TEC INTI PRIMA

Dibuat Diperiksa Disetujui


NRI SLAG LINE No.3

UNIT QUANTITY KET.

KG 3,926.688
KG 1,920.912
KG 386.363
KG 2,126.238
KG 1,185.330
KG 1,315.527
KG -
9 of 25 .

CALCULATION SHEET BY PT.OTSUKA-TEC INTI PRIMA

Dibuat Diperiksa Disetujui


NRI SLAG LINE No.3

KG 10,861.057
M2 -
10 of 25 .

CALCULATION SHEET BY PT.OTSUKA-TEC INTI PRIMA

Dibuat Diperiksa Disetujui


NRI SLAG LINE No.3
11 of 25 .

PAGE

PRINTED

21-Mar-2017
12 of 25 .

PAGE

PRINTED

21-Mar-2017
13 of 25 .

PAGE

PRINTED

21-Mar-2017
CALCULATION SHEET BY
14 of 25 PT.. SW

NRI SLAG LINE No.3

GAS METERING STATION (MADURA BD CLIENT PT. SAPTA REKSA UTAMA


FIELD DEFELOPMENT-EPCI) STRUCTURE NRI SLAG LINE No.3

NRI SLAG LINE No.3

Project Name : Slag Line Crushig Plan Project


Client : PT. Nichias Rockwool Indonesia

NO. Description
DIA.
QTY

Steel Structure Job (ST01)

1 Primary Main Frame (FR 01-01) 1


Column 1 HB 300 x 300 x 10 x 15 4
Diagonal Column HB 300 x 300 x 10 x 15 2
Column 2 HB 300 x 300 x 10 x 15 2
Main Beam HB 300 x 300 x 10 x 15 2
Bracing HB 300 x 300 x 10 x 15 5
UNP 150 x 75 x 7.5 16
Platform
LNP 60 x 60 x 6 8
UNP 200 x 80 x 7.5 2
Stairway
LNP 60 x 60 x 6 12
PIPE SCH.40 1.1/4" 2
file:///var/www/apps/conversion/tmp/scratch_4/348949449.xlsx Page 14
15 of 25 .
NRI SLAG LINE No.3

Project Name : Slag Line Crushig Plan Project


Client : PT. Nichias Rockwool Indonesia

NO. Description
DIA.
QTY

PIPE SCH.40 1.1/4" 1
PIPE SCH.40 1.1/4" 2
FB 6 x 50 4
FB 6 x 50 2
Handrail
FB 6 x 50 4
FB 6 x 100 2
FB 6 x 100 1
FB 6 x 100 2
LNP 60 x 60 x 6 18

JUMLAH

2 Secondary Main Frame (FR 02-02)


Column 1 HB 200 x 200 x 8 x 12 2
Column 2 HB 200 x 200 x 8 x 12 2
Column 3 HB 200 x 200 x 8 x 12 1
Bracing HB 200 x 200 x 8 x 12 5
Beam HB 200 x 200 x 8 x 12 6
UNP 150 x 75 x 7.5 8
Platform

file:///var/www/apps/conversion/tmp/scratch_4/348949449.xlsx Page 15
16 of 25 .
NRI SLAG LINE No.3

Project Name : Slag Line Crushig Plan Project


Client : PT. Nichias Rockwool Indonesia

NO. Description
DIA.
QTY

Platform
LNP 60 x 60 x 6 4
PIPE SCH.40 1.1/4" 2
PIPE SCH.40 1.1/4" 1
PIPE SCH.40 1.1/4" 3
FB 6 x 50 4
FB 6 x 50 2
Handrail
FB 6 x 50 6
FB 6 x 100 2
FB 6 x 100 1
FB 6 x 100 3
LNP 60 x 60 x 6 14

JUMLAH

3 Conveyor 1 (BC 01-03)


Frame UNP 200 x 80 x 7.5 2
Bracing LNP 60 x 60 x 6 10
Bracing LNP 60 x 60 x 6 6
Motor Support LNP 60 x 60 x 6 1

file:///var/www/apps/conversion/tmp/scratch_4/348949449.xlsx Page 16
17 of 25 .
NRI SLAG LINE No.3

Project Name : Slag Line Crushig Plan Project


Client : PT. Nichias Rockwool Indonesia

NO. Description
DIA.
QTY

Tail Support UNP 150 x 75 x 7.5 2

JUMLAH
4 Conveyor 2 (BC 02-04)
Frame UNP 200 x 80 x 7.5 2
Bracing LNP 60 x 60 x 6 28
Bracing LNP 60 x 60 x 6 52
Motor Support LNP 60 x 60 x 6 1
Tail Support UNP 150 x 75 x 7.5 2
WF 200 x 100 x 5.5 x 8 2
Walkway UNP 200 x 80 x 7.5 28
LNP 60 x 60 x 6 28
PIPE SCH.40 1.1/4" 1
FB 6 x 50 2
Handrail
FB 6 x 100 1
LNP 60 x 60 x 6 16

JUMLAH

file:///var/www/apps/conversion/tmp/scratch_4/348949449.xlsx Page 17
18 of 25 .
NRI SLAG LINE No.3

Project Name : Slag Line Crushig Plan Project


Client : PT. Nichias Rockwool Indonesia

NO. Description
DIA.
QTY

5 Conveyor 3 (BC 03-05)


Frame UNP 200 x 80 x 7.5 2
Bracing LNP 60 x 60 x 6 9
Bracing LNP 60 x 60 x 6 8
Motor Support LNP 60 x 60 x 6 1
Tail Support UNP 150 x 75 x 7.5 2
WF 200 x 100 x 5.5 x 8 2
Walkway UNP 200 x 80 x 7.5 16
LNP 60 x 60 x 6 16
PIPE SCH.40 1.1/4" 1
FB 6 x 50 2
Handrail
FB 6 x 100 1
LNP 60 x 60 x 6 9

JUMLAH

6 Support Conveyor (SP 01-06)


HB 200 x 200 x 8 x 12 Column 2
Support BC 02
file:///var/www/apps/conversion/tmp/scratch_4/348949449.xlsx Page 18
19 of 25 .
NRI SLAG LINE No.3

Project Name : Slag Line Crushig Plan Project


Client : PT. Nichias Rockwool Indonesia

NO. Description
DIA.
QTY

Support BC 02 HB 200 x 200 x 8 x 12 Bracing 4
LNP 75 x 75 x 7 Bracing 1
HB 200 x 200 x 8 x 12 Column 2
Support BC 03 HB 200 x 200 x 8 x 12 Bracing 2
LNP 75 x 75 x 7 Bracing 1

JUMLAH

7 Magnet Separator Bulding (BL 01-07)

JUMLAH

file:///var/www/apps/conversion/tmp/scratch_4/348949449.xlsx Page 19
T BY PT. SWG PT.SWADAYA GRAHA PAGE 20 of 25 .
Dibuat Diperiksa Disetujui 4
E No.3
PRINTED

AGS AGS CSN 21-Mar-2017

UKURAN (M) TOTAL REAL


TINGGI /
SAT Remarks
PANJANG LEBAR TEBAL LUAS BERAT VOLUME VOLUME
n1 n2
L B H m2 Kumulatif

1.700 639.200 Kg
4.547 854.836 Kg
0.400 75.200 Kg
4.700 883.600 Kg
1.700 799.000 Kg
0.700 209.067 Kg
0.600 26.016 Kg
2.000 103.333 Kg
0.600 39.024 Kg
3.500 24.290 Kg
file:///var/www/apps/conversion/tmp/scratch_4/348949449.xlsx Page 20
21 of 25 .

UKURAN (M) TOTAL REAL


TINGGI /
SAT Remarks
PANJANG LEBAR TEBAL LUAS BERAT VOLUME VOLUME
n1 n2
L B H m2 Kumulatif
3.900 13.533 Kg
2.000 13.880 Kg
3.500 27.463 Kg
3.900 15.301 Kg
2.000 15.693 Kg
3.500 32.970 Kg
3.900 18.369 Kg
2.000 18.840 Kg
1.200 117.072 Kg

3,926.688 Kg

4.000 399.333 Kg
2.500 249.583 Kg
2.500 124.792 Kg
1.500 374.375 Kg
1.500 449.250 Kg
0.700 104.533 Kg

file:///var/www/apps/conversion/tmp/scratch_4/348949449.xlsx Page 21
22 of 25 .

UKURAN (M) TOTAL REAL


TINGGI /
SAT Remarks
PANJANG LEBAR TEBAL LUAS BERAT VOLUME VOLUME
n1 n2
L B H m2 Kumulatif
0.600 13.008 Kg
2.000 13.880 Kg
1.000 3.470 Kg
1.500 15.615 Kg
2.000 15.693 Kg
1.000 3.923 Kg
1.500 17.655 Kg
2.000 18.840 Kg
1.000 4.710 Kg
1.500 21.195 Kg
1.200 91.056 Kg

1,920.912 -

5.000 258.333 Kg
0.700 37.940 Kg
1.300 42.276 Kg
4.000 21.680 Kg

file:///var/www/apps/conversion/tmp/scratch_4/348949449.xlsx Page 22
23 of 25 .

UKURAN (M) TOTAL REAL


TINGGI /
SAT Remarks
PANJANG LEBAR TEBAL LUAS BERAT VOLUME VOLUME
n1 n2
L B H m2 Kumulatif
0.700 26.133 Kg

386.363 -

14.000 723.333 Kg
0.690 104.714 Kg
1.000 281.840 Kg
4.000 21.680 Kg
0.700 26.133 Kg
3.700 157.867 Kg
0.600 434.000 Kg
0.600 91.056 Kg
15.000 52.050 Kg
15.000 58.850 Kg
15.000 70.650 Kg
1.200 104.064 Kg

2,126.238 - Kg

file:///var/www/apps/conversion/tmp/scratch_4/348949449.xlsx Page 23
24 of 25 .

UKURAN (M) TOTAL REAL


TINGGI /
SAT Remarks
PANJANG LEBAR TEBAL LUAS BERAT VOLUME VOLUME
n1 n2
L B H m2 Kumulatif

9.000 465.000 Kg
0.690 33.658 Kg
1.000 43.360 Kg
4.000 21.680 Kg
0.700 26.133 Kg
3.000 128.000 Kg
0.600 248.000 Kg
0.600 52.032 Kg
9.000 31.230 Kg
9.000 35.310 Kg
9.000 42.390 Kg
1.200 58.536 Kg

1,185.330 -

4.200 419.300 Kg

file:///var/www/apps/conversion/tmp/scratch_4/348949449.xlsx Page 24
25 of 25 .

UKURAN (M) TOTAL REAL


TINGGI /
SAT Remarks
PANJANG LEBAR TEBAL LUAS BERAT VOLUME VOLUME
n1 n2
L B H m2 Kumulatif
2.000 399.333 Kg
12.000 65.040 Kg
2.000 199.667 Kg
2.000 199.667 Kg
6.000 32.520 Kg

1,315.527 -