FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE DESCRIPTION
PROJECT/JOB NO. S-005
PROJECT/JOB NAME ISTANA HOTEL
CLIENT NAME Tauch Botitya
SITE NAME POIPET
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME F1
LOAD COMBINATION GROUP

REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
COMB-F1 1 F1

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318) [SI]
Horizontal Force for Wind AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-05]
Horizontal Force for Seismic AMERICAN SOCIETY CIVIL ENGINEERS [ASCE 7-05]
Unit System Input : SI, Output : SI, Calculation Unit : SI

1.2 MATERIALS & UNIT WEIGHT


Items Value
2
Concrete (f'c : compressive strength) 35.000 N/mm
2
Lean Concrete (Lf'c : compressive strength) 15.000 N/mm
2
Reinforcement (10M ~ 16M , yield strength) 390.000 N/mm
2
Reinforcement (19M ~ , yield strength) 390.000 N/mm
3
Rs (Soil unit weight) 20.000 kN/m
3
Rc (Concrete unit weight) 24.000 kN/m
2
Es (Steel Modulus of Elasticity) 200.000 kN/mm
2
Ec (Concrete Modulus of Elasticity) 25.600 kN/mm

- Pile Capacity
Items Value
Pile Name PHC-12
Footing List F1
Diameter 1200 mm
Length 12 m
Thick 20 mm
Shape Circle
Capacity ( Ha , Ua , Va ) 135 , 85 , 10650 kN

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items Description
Allowable Increase of Soil (Wind) 33.33 %
Allowable Increase of Soil (Seismic) 33.33 %
Allowable Increase of Soil (Test) 20 %
Allowable Increase of Pile Horizontal (Wind) 33.33 %
Allowable Increase of Pile Horizontal (Seismic) 33.33 %
Allowable Increase of Pile Horizontal (Test) 20 %
Allowable Increase of Pile Vertical (Wind) 33.33 %
Allowable Increase of Pile Vertical (Seismic) 33.33 %
Allowable Increase of Pile Vertical (Test) 20 %
Allowable Increase of Pile Uplift (Wind) 33.33 %
Allowable Increase of Pile Uplift (Seismic) 33.33 %
Allowable Increase of Pile Uplift (Test) 20 %

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 4

Safety factor against overturning for OVM1(FO1) 1.5


Safety factor against overturning for OVM2(FO2) 1.7
Safety factor against overturning for OVM3(FO3) 1.8
Safety factor against overturning for OVM4(FO4) 2.1
Safety factor against sliding for the SL1(FS1) 1.5
Safety factor against sliding for the SL2(FS2) 1.6
Safety factor against sliding for the SL3(FS3) 1.7
Safety factor against sliding for the SL4(FS4) 1.8
Friction factor (m) 0.35

1.4 LOAD COMBINATION


Index Load Case Name Load Case Description
1 SW SELF WEIGHT
2 DL DEAD LOAD
3 LL LIVE LOAD

Comb . ID Load Combination for stability


1 1.0 Backfill + 1.0 SW + 1.0 DL + 1.0 LL
2 1.0 Backfill + 1.2 SW + 1.2 DL + 1.6 LL
Comb . ID Load Combination for Reinforcement
3 1.0 Backfill + 1.0 SW + 1.0 DL + 1.0 LL
4 1.0 Backfill + 1.2 SW + 1.2 DL + 1.6 LL

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017 Page 5

2. DRAWING REFERENCE DWGS


NO. DWG NO. DWG TITLE

A01

NOTES
* OUTPUT UNIT : mm

01

ISTANA HOTEL PROJECT


1

F1
FOUNDATION LOCATION PLAN
F1

SQUAD CHECK
Y
PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN S-005

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017 Page 6

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017 Page 7

REFERENCE DWGS
NO. DWG NO. DWG TITLE
2400 CL FOOTING
1200 TOP BOTTOM

TYP.
75
1200

19M@200

25M@200
1200x2
2400

NOTES
* PILE
1-1200 PHC-12
* OUTPUT UNIT : mm

1200x2 19M@200
25M@200

FOUNDATION PLAN FOOTING REINF. PLAN

ISTANA HOTEL PROJECT


700
50 75

TOC EL. + 500

20
TYP.
1500

@150
10M
1000

25M 700
FOUNDATION DETAIL FOR
10M
F1
75
75

SQUAD CHECK
1100

24-25M
PEDESTAL
150

PROCESS PIPING VESSELS STRUCT. ELEC. INST.


LEAN CONC. 50 THK

SECTION
SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKD APPD APPD APPD


AS SHOWN S-005

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 8

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name F1
Ft. Type ISO
2
2400 Area 5.760 m
Ft. Thickness 1100.00 mm
3
Ft. Volume 6.336 m
Ft. Weight 152.064 kN
Soil Height 1000.00 mm
3
700 700 Soil Volume 5.270 m
Soil Weight 105.400 kN
2400

Buoyancy Not Consider


Self Weight (except Pr.SW) 257.464 kN

1500
1000

1100

The Origin coordinate


The Center of Gravity & Pile (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F1 All Direct 6.336 m 5.270 m 17.640 kN

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


2
S1 5.760 m 152.064 kN 105.400 kN 275.104 kN

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : mm , Weight : kN , Area : m )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
F1 1 Rectangle 700.000 700.000 1500.000 0.490 17.640 0.000 0.000

3.3 LOAD CASE


Fz
Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch)
My are based on the right hand rule.
Fx
Mx

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 9

Index Load Case Name Load Case Description


1 SW SELF WEIGHT
2 DL DEAD LOAD
3 LL LIVE LOAD

Unit( kN , kN-m )
Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0 0 -17.64 0 0
1 2 -3.5 -98.02 -4997.02 49.33 3.75
F1 3 0.73 -32.75 -1679.65 20.96 2.45
Footing Backfill 0.000 0.000 -115.200 0.000 0.000
Footing SW 0.000 0.000 -257.464 0.000 0.000

3.4 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.4.1 Load Combination in Pier Top (Without SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
1 -2.770 -130.770 -6676.670 70.290 6.200
2 -3.032 -170.024 -8683.864 92.732 8.420
F1 1
3 -2.770 -130.770 -6676.670 70.290 6.200
4 -3.032 -170.024 -8683.864 92.732 8.420

3.4.2 Load Combination in Footing Bottom (With Pier SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
1 -2.770 -130.770 -6694.310 410.292 -1.002
2 -3.032 -170.024 -8705.032 534.794 0.537
F1 1
3 -2.770 -130.770 -6694.310 410.292 -1.002
4 -3.032 -170.024 -8705.032 534.794 0.537

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
1 -2.770 -130.770 -7066.974 410.292 -1.002 1200.0 , 1200.0
F1 p
2 -3.032 -170.024 -9129.189 534.794 0.537 1200.0 , 1200.0

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 10

Load Combination of Ultimate Condition


p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name Sec.Na L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
3 -2.770 -130.770 -7066.974 410.292 -1.002 1200.0 , 1200.0
F1 p S1
4 -3.032 -170.024 -9129.189 534.794 0.537 1200.0 , 1200.0

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 11

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Uni-Axial)
4.1.1 Formula
if footing is checked in Buoyancy SFz means SFz - Fb
SFz SMy X SFz SMx Y
- Uni Axial : Rx = , Ry =
Np S Xi2 Np S Yi2
- Ru = Max[ Rxmax , Ry max ]
- Uf = Min[ 0 , Rxmin , Ry min ]
- Ru < Va -> OK
Max(SHxi , SHyi)
b. Horizontal - Hmax = < Ha -> OK
Np
c. Uplift - Uf < Ua -> OK
Ver. / Uf. = Vertical / Uplift

4.1.2 Check of Vertical & Uplift Reaction


SXi (m ) SYi (m )
2 2 2 2
Ft.Name Np(EA) Fl (mm) Fw (mm)
F1 1 2400 2400 0 0

Unit( kN )
Ft.Name L.Comb. Pile R Max R Min Ru Uf Ra Ua Result
X-Dir 9129.189 9129.189
F1 2 PHC-12 9129.189 0 14199.65 113.331 OK
Y-Dir 9129.189 9129.189

4.1.3 Check Of Horizontal Reaction


Ft.Name L.Comb. Pile Hmax (kN) Ha (kN) Result
F1 2 PHC-12 170.024 179.995 OK

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 12

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data Unit( mm , kN , kN-m )


Ft.Name Sec.Na Dir. L.Comb. Fl or Fw Sl or Sw SFz SM SQ
F1 p 3 2400.00 2400.00 7066.974 -1.00 6694.310
S1 X
4 2400.00 2400.00 9129.189 0.54 8705.032
3 2400.00 2400.00 7066.974 410.292 6694.310
S1 Y
4 2400.00 2400.00 9129.189 534.794 8705.032

5.1.2 Design Parameters


Yield Strength - 10M ~ 16M : fy1 , 19M ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
fp_clb : Clear Cover for bottom of footing reinforcement (Pile Foundation)
Loc. : Location of Critical Point from left side of footing

2
Unit(N/mm ,mm)
f(Flexure) f(Shear) f'c fy1 fy2 f_cl f_clt fp_clb
0.9 0.75 35.00 390.00 390.00 75.0 75.0 150.0

5.2 REQUIRED REINFORCEMENT


5.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement
As = fac b h , fac = 0.002 ---- USD99 CODE 5.7.2(1)
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
As As5
As As4
- The requirements of Eq (6.3.2) need not be applied, if every section As provided is
at least one -third greater than that required by analysis
As2 = r.req b d
As3 = 1.333 r.req b d
1.4
As4 = bd
fy
0.25 fck
As5 = bd
fy
Asmax = 0.75 rb b d
fck 0.003 Es
rb = 0.85 b1
fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 13

But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
fbd2
, f = 0.9 , r.req =
fy ( 1- 1-
0.85fck )
5.2.2 Check of Footing Reinforcement
Footing Name : F1 GroupType : Isolated
- X direction (All Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

4 top 13 - 19M @ 200 0.600 2.400 1015.500 3685.874


S1
4 botom 13 - 25M @ 200 1.550 2.400 937.500 6381.361

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


4 top 8.640 0.004 0.0000
S1
4 bottom 220.399 0.116 0.0003

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2
As4(mm )
2
As5(mm )
2
Asmax(mm )
2

4 top 2376.000 24.242 32.315 8748.924 9242.737 67689.830


S1
4 bottom 2376.000 671.090 894.562 8076.923 8532.808 62490.610

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
4 top 3685.874 2376.000 OK
S1
4 bottom 6381.361 2376.000 OK

- Y direction (All Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

4 top 13 - 19M @ 200 0.600 2.400 990.500 3685.874


S1
4 botom 13 - 25M @ 200 1.550 2.400 912.500 6381.361

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


4 top 8.640 0.004 0.0000
S1
4 bottom 220.399 0.123 0.0003

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2
As4(mm )
2
As5(mm )
2
Asmax(mm )
2

4 top 2376.000 24.851 33.126 8533.539 9015.196 66023.410


S1
4 bottom 2376.000 689.550 919.170 7861.539 8305.267 60824.200

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
4 top 3685.874 2376.000 OK
S1
4 bottom 6381.361 2376.000 OK

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 14

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
2400

F1 S1 X 3
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMy Moment intia 4
-7066.974 kN -1.002 kN-m 2.7648 m 1
Area 2 Contact Area Critical Point Method
5.760 m Critical Max Point
Critical Value
Mubottom = 166.696 kN-m , Mutop = -8.64 kN-m

50

00
0

0
60

85

15

24
0

[ mm ]

[Loading]

-48 -48
[ kN , kN/m ]

5889.15

[B.M.D] [ kN-m ]

-166.7
-125
-83.3
-41.7
-8.64
0
41.7
83.3
125
166.7
166.7

[B/L.M.D] [ kN-m / m ]

-69.5
-52.1
-34.7
-17.4
-3.6
0
17.4
34.7
52.1
69.46
69.5

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 15

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
2400

F1 S1 X 4
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMy Moment intia 4
-9129.189 kN 0.537 kN-m 2.7648 m 1
Area 2 Contact Area Critical Point Method
5.760 m Critical Max Point
Critical Value
Mubottom = 220.399 kN-m , Mutop = -8.64 kN-m

50

00
0

0
60

85

15

24
0

[ mm ]

[Loading]

-48 -48
[ kN , kN/m ]

7607.66

[B.M.D] [ kN-m ]

-220.4
-165.3
-110.2
-55.1
-8.64
0
55.1
110.2
165.3
220.4
220.4

[B/L.M.D] [ kN-m / m ]

-91.8
-68.9
-45.9
-23
-3.6
0
23
45.9
68.9
91.83
91.8

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 16

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
2400

F1 S1 Y 3
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMx Moment intia 4
-7066.974 kN 410.292 kN-m 2.7648 m 1
Area 2 Contact Area Critical Point Method
5.760 m Critical Max Point
Critical Value
Mubottom = 166.696 kN-m , Mutop = -8.64 kN-m

50

00
0

0
60

85

15

24
0

[ mm ]

[Loading]

-48 -48
[ kN , kN/m ]

5889.15

[B.M.D] [ kN-m ]

-166.7
-125
-83.3
-41.7
-8.64
0
41.7
83.3
125
166.7
166.7

[B/L.M.D] [ kN-m / m ]

-69.5
-52.1
-34.7
-17.4
-3.6
0
17.4
34.7
52.1
69.46
69.5

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 17

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
2400

F1 S1 Y 4
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMx Moment intia 4
-9129.189 kN 534.794 kN-m 2.7648 m 1
Area 2 Contact Area Critical Point Method
5.760 m Critical Max Point
Critical Value
Mubottom = 220.399 kN-m , Mutop = -8.64 kN-m

50

00
0

0
60

85

15

24
0

[ mm ]

[Loading]

-48 -48
[ kN , kN/m ]

7607.66

[B.M.D] [ kN-m ]

-220.4
-165.3
-110.2
-55.1
-8.64
0
55.1
110.2
165.3
220.4
220.4

[B/L.M.D] [ kN-m / m ]

-91.8
-68.9
-45.9
-23
-3.6
0
23
45.9
68.9
91.83
91.8

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 18

5.3 ONE WAY SHEAR FORCE


5.3.1 One-Way Shear Formula
- f Vc = 0.75 1/6 fck B'w d
- Vu <= f Vc , then OK!!

5.3.2 Check of One-Way Shear


Footing Name : F1 GroupType : Isolated PileType : True

Unit : mm
2400
2400

- X direction One-Way Shear (All Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 3 0 937.5 2400 1663.897 0 OK
- Y direction One-Way Shear (All Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 3 0 912.5 2400 1619.527 0 OK

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 19

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
2400

F1 S1 X 3
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMy Moment intia 4
-7066.974 kN -1.002 kN-m 2.7648 m 1
Area 2 Contact Area Critical Point Method
5.760 m Critical Max Point
Critical Value
Vu = 0 kN

50

00
0
85

15

24
0

[ mm ]

[Loading]

-48 -48
[ kN , kN/m ]

5889.15

[S.F.D] [ kN ]
1431.49
1431.5
1073.6
715.7
357.9
0
-357.9
-715.7
-1073.6
-1431.5

[S/L.F.D] [ kN / m ]
596.45
596.5
447.3
298.2
149.1
0
-149.1
-298.2
-447.3
-596.5

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 20

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
2400

F1 S1 X 4
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMy Moment intia 4
-9129.189 kN 0.537 kN-m 2.7648 m 1
Area 2 Contact Area Critical Point Method
5.760 m Critical Max Point
Critical Value
Vu = 0 kN

50

00
0
85

15

24
0

[ mm ]

[Loading]

-48 -48
[ kN , kN/m ]

7607.66

[S.F.D] [ kN ]
1861.11
1861.1
1395.8
930.6
465.3
0
-465.3
-930.6
-1395.8
-1861.1

[S/L.F.D] [ kN / m ]
775.47
775.5
581.6
387.7
193.9
0
-193.9
-387.7
-581.6
-775.5

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 21

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
2400

F1 S1 Y 3
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMx Moment intia 4
-7066.974 kN 410.292 kN-m 2.7648 m 1
Area 2 Contact Area Critical Point Method
5.760 m Critical Max Point
Critical Value
Vu = 0 kN

50

00
0
85

15

24
0

[ mm ]

[Loading]

-48 -48
[ kN , kN/m ]

5889.15

[S.F.D] [ kN ]
1431.49
1431.5
1073.6
715.7
357.9
0
-357.9
-715.7
-1073.6
-1431.5

[S/L.F.D] [ kN / m ]
596.45
596.5
447.3
298.2
149.1
0
-149.1
-298.2
-447.3
-596.5

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 22

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
2400

F1 S1 Y 4
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMx Moment intia 4
-9129.189 kN 534.794 kN-m 2.7648 m 1
Area 2 Contact Area Critical Point Method
5.760 m Critical Max Point
Critical Value
Vu = 0 kN

50

00
0
85

15

24
0

[ mm ]

[Loading]

-48 -48
[ kN , kN/m ]

7607.66

[S.F.D] [ kN ]
1861.11
1861.1
1395.8
930.6
465.3
0
-465.3
-930.6
-1395.8
-1861.1

[S/L.F.D] [ kN / m ]
775.47
775.5
581.6
387.7
193.9
0
-193.9
-387.7
-581.6
-775.5

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 23

5.4 TWO WAY SHEAR FORCE


5.4.1 Two-Way Shear Formula
Vu = SFz Shade Ratio
f Vc1 = 0.75 1/6 (1 + 2/ bc) fck bo d
f Vc2 = 0.75 1/6 (1 + as d / 2 bo) fck bo d
f Vc3 = 0.75 1/3 fck bo d
f Vc = Min(f Vc1 , f Vc2 , f Vc3)
Vu f Vc , then OK
where
bc = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.4.2 Check of Two-WayShear

2.681 106 mm
2
Ft.Name F1 Punching Area

2400 Pr.Name 1 Pile effect 0/1

Shape Rectangle f Vc1 13623.160 kN

L.Comb. 4 f Vc2 17540.250 kN


2400

Pl 700 mm f Vc3 9082.107 kN


1
Pw 700 mm f Vc 9082.107 kN

bo / d 6550 / 937.5 mm Vu 0.000 kN

bc / as 1 / 40 Result OK

5.5 PILE PUNCHING SHEAR FORCE


5.5.1 Pile Punching Shear Formula
Vu = SFz Shade Ratio
f Vc1 = 0.75 1/6 (1 + 2/ bc) fck bo d
f Vc2 = 0.75 1/6 (1 + as d / 2 bo) fck bo d
f Vc3 = 0.75 1/3 fck bo d
f Vc = Min(f Vc1 , f Vc2 , f Vc3)
Vu f Vc , then OK
where
bc = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
b o = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

Copyright (c) GS E&C. All Rights Reserved


22-Mar-2017

Project Na. : ISTANA HOTEL


Calculation Sheet
of Project No. : S-005

Foundation Client : Tauch Botitya Page 24

5.5.2 Check of Pile Punching Shear

3.588 106 mm
2
Ft.Name F1 Punching Area

2400 Pile No. 1 bc / as 1 / 40

Shape Circle f Vc1 13966.660 kN

L.Comb. 4 f Vc2 17654.750 kN


2400

PileName PHC-12 f Vc3 9311.107 kN

1
Diameter 1200mm f Vc 9311.107 kN

bo 6715.15mm Vu 9129.189 kN

d 937.5mm Result OK

Copyright (c) GS E&C. All Rights Reserved