ROOF DECK LIVE LOAD COMPUTATIONS - Frame A Long Span

From NSCP Section 205 Live Loads


Table 205-1 Minimum Uniform and Concentrated Live Loads

Tributary Width = [(1 / 2) x 7.00m] = 3.50m


Span 1-2,2-3,3-4,4-5,5-6 - Deck (Maintenance Access)
1.90kPa (3.50m) = 6.65kN/m
Span 6-7,7-8,8-9,9-10,10-11,11-12 - Roof Live Load
0.75kPa (3.50m) = 2.63kN/m
Span 12-13,13-14,14-15 - Deck (Maintenance Access)
1.90kPa (3.50m) = 6.65kN/m

ISOLATE FRAME A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
6.65kN/m 6.65kN/m
2.63kN/m

5.00 5.00 6.50 5.00 5.00 6.50 5.50 7.50 7.50 5.50 6.50 7.50 7.50 7.50

M1 = -14.81kN.m
M2 = -11.94kN.m
M3 = -20.54kN.m
M4 = -20.34kN.m
M5 = -12.63kN.m
M6 = -12.29kN.m
M7 = -6.56kN.m
M8 = -9.58kN.m
M9 = -13.57kN.m
M10 = -10.13kN.m
M11 = -3.93kN.m
M12 = -21.54kN.m
M13 = -33.76kN.m
M14 = -30.43kN.m
M15 = -31.54kN.m