Professional Documents
Culture Documents
Mubeen Ahmed CV
Mubeen Ahmed CV
CAREER OBJECTIVE:
EMPLOYMENT HISTORY:
COMPANY ACTIVITIES
Projects
Page 2 of 7
2. Name of Project: Louvre Abu Dhabi Museum.
Client Name & Location: Wagner Biro, Abu Dhabi.
Proven ability in preparation of WPS, PQR, WPQ and 3.2 Certification as per International
Standards.
Well Conversant with International Codes/Standards: ASME SEC-I, II, V, VII, VIII DIV. 1,
IX,BS-15614, BS-287 Steel Structure Specification 051200 ETC.
Material verification as per specifications and standards.
Planning, supervising and controlling project works undertaken including installation, re-location
and modification of pipelines, flow lines and piping systems.
Preparation of (ROI) Record of information drawing as per the field modification. And issued to
construction and monitoring the field modification activities.
Identifying and reviewing the tools and test equipment required to assist in doing the work.
Monitoring and supervising the piping fabrication activities carried out by the module fabricator
Ensuring that the piping fabrication and assembly activities are carried out to the schedule and
highest HSE standards.
Preparation and documentation of Inspection reports (Piping & Structural), material reports,
engineering reports, punch lists, NDT reports etc
Participating in project meetings for evaluating project progress and providing technical inputs.
Inspection of Pressure Tests
Inspection of Equipment erection and alignment.
Co-ordinating quality inspection & quality survey programs with owner inspectors and clients.
Managing and maintaining files for a variety of related technical documentation such as
equipment commissioning and test records.
Preparation and assessment of daily progress report and co-ordinating progress review meetings
in-house, with clients and with sub contractors.
Material, Man power and Equipment planning for daily work activities.
Evaluation of joint summary sheet in piping test package with isometric drawings.
Providing technical support to the project on piping fabrication, installation, commissioning and
Hook up
Material re-conciliation after turn-around from contractor.
Page 3 of 7
Familiar with ASME, BIS, AWS etc. codes/standards related to piping, mechanical, steel
structural, welding etc. Also have knowledge in fabrication, inspection and testing requirements
of materials viz. CS, SS, etc. at various stages of construction till pre-commissioning.
Arranging Radiography) and conducting other NDT tests
Co-ordination with Production Planning Department for designing and materials, work schedule
preparation and Schedule monitoring.
To undertake team briefings and inception activities to ensure all aspects of work are understood
by all concerned parties.
To ensure safety standards and procedures are implemented and followed in accordance with
contract requirements and Company guidelines.
Strict follow-up of the implementation of approved Inspection Test Plan (ITP) and the project
specification.
To review the assignment instruction for adequacy and practicality.
Conduct inspections on the items requested for inspection (Raw Material Inspection, Fit Up
Inspection, Welding Inspection, Painting Inspection, Installation Inspection, Torque Inspection,
Fire Proof Coating Inspection).
Ensure inward materials to be from approved venders.
Inspection of Incoming drawing materials such as Beams, Pipes, flange, fittings, Plates, Angles,
Welding Consumables, etc.
Ensure documented quality checks to be done on the inward materials.
Overseeing the Quality Control operations and testing of Engineering Operations, Welding
process, Fabrication, Production, Erection, etc.
Inspection of structural steel fabrication as per client requirements, codes and standards.
Carrying out visual inspection of weld as per International Standards.
Final Inspection and Dispatch of Materials for the supply of goods.
Interpret isometrics and piping plans.
Identify and plan all piping related activities with respect to project requirements and ensure
fixation of responsibility for execution.
Installation of turbine piping along with support, fabrication and erection.
Responsible for the site fabrication, testing, commissioning of on-plot pipe work
Installation of turbine related underground piping and hydro testing.
Pipe welding checking and quality control (visual, fit up, alignment, welding).
Required to coordinate for all NDE works.
Coordinating third party inspections.
To be actively involved in the final hydro-testing prior to commissioning.
Maintaining required documentation of QC as per Customer requirements and ISO Quality
Management System.
Daily login all the observations on the project execution in the logbook.
Calibration controlling of precision measuring instruments.
Issue of Non-conformity reports against non-complying conditions.
Review of final inspection reports.
Data Entry of Companys entire production related records like batch wise production reports
with quality remarks.
Page 4 of 7
QA/QC Engineer
Thomas Bennett Gulf,
Dubai, UAE.
May 2011 to May 2013
COMPANY ACTIVITIES
Projects
Involved in the preparation of Project Quality plan in accordance with ISO 9001:2000.
Also familiar with Project Management, planning and scheduling, preparation of material take-
off, implementation of quality control and quality assurance, project safety, preparation of
QA/QC documents, method statement etc and Internal Quality audits.
Conduct inspections on the items requested for inspection.
To review and evaluate technical submittals and shop drawings prior to submission to
consultants and clients according to required project standards.
Daily login all the observations on the project execution in the logbook.
Co-ordination with Production Planning Department for designing and materials, work
schedule preparation and Schedule monitoring.
Preparing ITP and Quality plans.
Strict follow-up of the implementation of approved Inspection Test Plan (ITP).
To review the assignment instruction for adequacy and practicality.
Issue of Non-conformity reports against non-complying conditions.
Review of final inspection reports.
Page 5 of 7
Data Entry of Companys entire production related records like batch wise production
reports with quality remarks.
To undertake team briefings and inception activities to ensure all aspects of work are
understood by all concerned parties.
To ensure safety standards and procedures are implemented and followed in accordance
with contract requirements and Company guidelines.
To handle procurement activities relating to contracts and sub contracts in accordance
with Company Procedures and Procurement department activities.
Ensure documented quality checks to be done on the inward materials.
Final Inspection and Dispatch of Materials for the supply of goods.
Overseeing the Quality Control operations and testing of Engineering Operations,
Welding process, Fabrication, Production, Erection, etc.
Inspection of structural steel fabrication as per client requirements, codes and standards.
Inspection of Incoming drawing materials such as Beams, Pipes, flange, fittings , Plates,
Angles, Welding Consumables, etc.
Calibration controlling of precision measuring instruments.
Maintaining required documentation of QC as per Customer requirements and ISO
Quality Management System.
Carrying out visual inspection of weld as per International Standards.
Maintaining records for approved suppliers.
Proven ability in preparation of WPS, PQR, and WPQ as per International Standards.
COMPANY ACTIVITIES
Page 6 of 7
Document Control of Quality records.
Site visiting and project coordinator.
Co-ordination with Production Planning Department for designing and materials, work
schedule preparation and Schedule monitoring.
Preparing ITP and Quality plans.
Strict follow-up of the implementation of approved Inspection Test Plan (ITP).
To review the assignment instruction for adequacy and practicality.
Ensure documented quality checks to be done on the inward materials.
Final Inspection and Dispatch of Materials for the supply of goods.
Looking after the Quality Control operations and testing of Engineering Operations,
Welding process, Fabrication, Production, Erection, etc.
Inspection of structural steel fabrication as per client requirements, codes and standards.
Inspection of Incoming drawing materials such as Beams, Pipes, flange, fittings, Plates,
Angles, Welding Consumables, etc.
Issue of Non-conformity reports against non-complying conditions.
PERSONAL TRIVIA:
Page 7 of 7