Professional Documents
Culture Documents
Solutions To Chapter 19 Problems 2014 Structural and Stress Analysis Third Edition
Solutions To Chapter 19 Problems 2014 Structural and Stress Analysis Third Edition
1
2.5
A
1 1
B B 5m
2.5 2.5
A
45
1
2.5
10 m
FIGURE S.19.1
1 1
3 3
45 A 3m 45 A 3m
1 C 1 C
3 3
B 4m B 4m
1 1
4 4
(a) 10 m (b) 7m 3m
FIGURE S.19.2
e368
Solutions to Chapter 19 Problems e369
1 1
The work done by the load 5 14 5 3 5 1535 5 291:7 kN m
2 3
Then
12 m 5 291:7
so that
m 5 24:31 kN m=m:
9:73 m 5 315
i.e.
m 5 32:37 kN m=m
For the slab shown in Fig. S.19.2(b) the work absorbed in the yield lines is:
for panel A,
1
m37 5 2:33 m
3
for panel B,
1
2 m37 5 3:5 m
4
e370 Solutions Manual
for panel C,
1
0:6 m 3 7 5 1:4 m
3
The total work absorbed in the yield
lines
is therefore m.
7.23
1 1 1
The work done by the load 5 10 7 3 3 1734 1333 5 255 kN m:
3 2 2
Therefore
7:23 m 5 255
i.e.
m 5 35:27 kN m=m:
x 1
2.5
B 2.5 m
1
2.5
7m 3m
FIGURE S.19.3
for panel B,
1
2m 1 m 3 10 5 16 m
2:5
The total work absorbed by the yield lines is therefore m[16 1 (2/x)].
Solutions to Chapter 19 Problems e371
2 0 1 0 13 2 0 13
1 1 1
The work done by the load is 5 1245x@ A 1 57 2 x@ A5 1 843 3 5@ A5
3 2 2
5 270 2 10x
Therefore
2
m 16 1 5 270 2 10x
x
i.e.
270 2 10x
m5
2
16 1
x
8x2 1 2x 2 27 5 0
which gives
x 5 1:716 m
Then
m 5 14:73 kN m=m:
x 1
2.5
A 2.5 m
1
B
x
A 2.5 m
1
2.5
8m
FIGURE S.19.4
e372 Solutions Manual
x2 1 1:0417x 2 12:5 5 0
which gives
x 5 3:053 m
Substituting for x in the above expression for w gives
w 5 15:45 kN=m2 :
1
2.5 (4 x) m
1 A A
2.5
C x
1
x
FIGURE S.19.5
for panel C,
1 13:2 m
m 3 6 1 1:2 m 3 6 5
x x
The total work absorbed by the yield lines is then 5 m[13.8 1 (13.2/x)].
2 0 1 0 1
1 1
The work done by the load 5 1542 3 2:5 3 1@ A 1 24 2 x 3 2:5@ A
3 2
0 1 0 1 0 1
1 1 1
1 2 3 2:5x@ A 1 1x@ A 1 14 2 x@ A 5 235 2 20x
3 2 1
Then
13:2
m 13:8 1 5 235 2 20x
x
i.e.
m 5 9:70 kN m=m:
e374 Solutions Manual
2.5 m
1
x
B x
8m 1 A x
2.5
B 1
x 2.5 m
A
1
2.5
8m
FIGURE S.19.6
5 316:67 2 16:67x
Therefore
12
m 10:96 1 0:8x 1 5 316:67 2 16:67x
x
Solutions to Chapter 19 Problems e375
so that
316:67 2 16:67x
m5
12
10:96 1 0:8x 1
x
The maximum value of m is most easily found using the trial and error method. Then,
m 5 24:31 kNm=m:
B B 5m
1/2.5
A
L 10-2L L
FIGURE S.19.7
For each of the panels A the work absorbed by the yield lines is m(10 2 2 L)(1/2.5) and
for each of the panels B the work absorbed by the yield lines is 0.4 m 3 5 3 (1/2.5). Also
the work done by the load is w[5 3 5 3 (1/3) 1 5(5 2 2 L)(1/2)]. Then, equating the work
absorbed by the yield lines to the work done by the load
2 m10 2 2 L1=2:5 1 2 3 0:4 m 3 5 3 1=2:5 5 w5 3 5 3 1=3 1 55 2 2 L1=2
Simplifying and substituting w 5 14 kN/m2 gives
17:5
2 m6 2 L 5 125 2 30 L
6
e376 Solutions Manual
from which
L 5 1:875 m
S.19.8 The yield line pattern for the top half of the slab is shown in Fig. S.19.8(a).
(a) 2m 3m 2m
1/2
A 2m
1/2 C
C
1/2
B 3m
1/3
(b) 1/3.5
1/3.5 1/3.5
E F
A A
45 1/3.5
FIGURE S.19.8
Mb 5 452:5 kNm
S.19.9 Referring to Fig. S.19.9 the work absorbed by the yield lines is as follows.
A 2.2 m
C
1/2.8
B D a a D B 5.6 m
1/2.2
C
1/2.8
I A 2.2 m
1/2.2
5m 4m 5m
FIGURE S.19.9
Work done 5 144 3 2:22 3 1=3 1 2 3 2:8 3 5:6 3 2=3 1 2 3 9:6 3 2:2 3 1=2
12 3 5:6 3 2:2 3 1=2 1 2 3 4 3 2:8 3 1=2 5 1008
e378 Solutions Manual
Note that this is obtained by dividing the slab into a combination of rectangles, squares
and triangles, calculating their areas and multiplying by the displacement of their
centroids.
Therefore
45:71 m 5 1008
so that
m 5 22:05 kNm=m