Project Title: - Air Condition
Project Title: - Air Condition
AIR CONDITION
CONSEQUENCE
RISK RANKING
PROBABILITY
EFFECTS / CURRENT CONTROL PROPOSED CONTROL
NO ACTIVITY /FACILITY HAZARD
CONSEQUENCES MEASURES MEASURES
- Manual handling/lifting
Spine injury - Improper should be carry out with
method of handling correct method (refer to
method statement
Struck/ hit by moving
- Supervised by designated
part of material during
person during lifting of
lifting activity
material.
(by tower crane)
HIRADC Page 1 of 4
CONSEQUENCE
RISK RANKING
PROBABILITY
EFFECTS / CURRENT CONTROL PROPOSED CONTROL
NO ACTIVITY /FACILITY HAZARD
CONSEQUENCES MEASURES MEASURES
- Supervised by designated
person during stacking of
material.
- Routine checking to
Slip/ fall/ collapse of
ensure stability of
material due to poor
material.
material arrangement.
- To ensure material not
obstructing any access
way.
- To provide wedge.
- Manual handling/lifting
should be carry out with
correct method.
- Scaffolding for working
Improper method of
Erection of working platform platform are erecting by
handling activity
experience workers.
- Proper mobile scaffold
i.e. stopper for tyre, G.I
pipe for mobile support.
HIRADC Page 2 of 4
CONSEQUENCE
RISK RANKING
PROBABILITY
EFFECTS / CURRENT CONTROL PROPOSED CONTROL
NO ACTIVITY /FACILITY HAZARD
CONSEQUENCES MEASURES MEASURES
walkway.
Prepared By Reviewed By
Name : Name :
Position : Position :
Date : Date :
GUIDE :
PROBABILITY (P) PRACTICALLLY NOT LIKELY TO COULD OCCUR KNOWN TO OCCUR KNOWN TO BE A
IMPOSSIBLE OCCUR i.e. HEARD OF i.e. HAS HAPPENED COMMON OR
HAPPENING IN THE PAST REPEATING
OCCURANCE
CONSEQUENCE (C) (1) (2) (3) (4) (5)
NEGLIGIBLE
1 2 3 4 5
(1)
MINOR
2 4 6 8 10
(2)
MAJOR
3 6 9 12 15
(3)
CATASTROPHIC
4 8 12 16 20
(4)
Legend :
HIRADC Page 4 of 4