Professional Documents
Culture Documents
Bimo Eko Satrio Resume PDF
Bimo Eko Satrio Resume PDF
Bimo Eko Satrio Resume PDF
PROFILE SUMMARY
Six years experience in diverse scope of oil and gas engineering, including detail
engineering, quotation engineering, R&D, and standardization.
Goal-oriented with proven leadership capabilities.
Work extremely well under pressure and tight deadline, in working conditions with no
or minimum supervision.
Good analytical and interpersonal skills, highly self-motivated and team oriented.
Extensive engineering knowledge in structural steel, wellheads, valves, and sealing
technology, including all relevant industry standards (e.g. API, ANSI, NACE and
DNV).
General exposure to Mudline wellhead, Subsea Wellhead, Christmas Tree and Control
equipments.
Hands-on experience with equipments assemblies and installations.
Six Sigma Green Belt trained.
PROFESSIONAL EXPERIENCE
CAMERON SINGAPORE PTE LTD
Current Position: Engineering Supervisor/ Team Leader October 2010 - Current
Project Highlights: HUSKY LiWan and APACHE Coniston
Key Deliverables/Accomplishments:
Successfully lead a team of Engineer and Drafter for completion of BHPB Macedon
Project (Distribution Assembly Equipments).
Attended various leadership and supervisory training.
Led the effort to develop standard Umbilical Termination Assembly (UTA) for cost-
cutting exercise.
Technical Experts for Frame Calculation, Geotechnical Analysis, Finite Element
Analysis, Hydrodynamic Calculation and Welding Symbols.
Previous Position: Project Design Engineer (Subsea Control) April 2009 October 2010
Project Highlights: BP Taurt Phase II and Chevron Jack & St. Malo
Key Deliverables/Accomplishments:
Successfully designed a Subsea Distribution Unit for BP Taurt Phase 2 below the
budgeted cost.
Completed the three-month intensive training in Cameron Celle for Subsea Control
Products.
Contributed in setting-up the new Subsea Control Plant in Cameron Johor Bahru.
Led the effort to build a self-learning tool for all the newly hired engineers/drafters.
Key Deliverables/Accomplishments:
Successfully reduced the production time for each hard disk drive to be under 30
second
Solving various problems with the production line such as leaked sealing, loose screws
and scratched disk.
Writing a technical manual for one of the new machine used in the production line
ACADEMIC QUALIFICATIONS
NATIONAL UNIVERSITY OF SINGAPORE, Singapore 2008
Master of Science, Industrial and System Engineering
Specialized in Project Management
Well versed in Statistical Analysis, Process Improvement Tools, New Product
Development Process.
ADDITIONAL INFORMATION
Technical Skills: MS Office, AutoCAD, Inventor, ANSYS Workbench, MathCAD, SAP
Language Abilities: English (fluent written/spoken), Malay/Bahasa Indonesia (mother
tongue)
Work Eligibilities: Singapore Permanent Resident and Indonesian National
Availability: One month