Professional Documents
Culture Documents
Alekz System
Alekz System
You can do Multiple Layers for your Gans Cells. Always remember we are in PLASMATIC INTERACTION
The Gans amplifies the Nano Coated Material
rylim 1
Alekz System
Keshe Foundation R&D Group
July 2, 2015
Plasma Transistor Setup (PTS-NPN)
A
L3
(-)
B
S
O = Positive Output
rylim 2
Alekz System
Keshe Foundation R&D Group
July 2, 2015
MAGRAV Beads Setup (MGBS)
Magnetical (Feeds Power)
PTS-NPN (-)
DLGC
(+)
Series Coiling Connection
(-) A
(+) B Number of
DLGC
(-) C is variable
Increasing the
Number of
DLGC increases
current or
Gravitational (Supply)
Series Coiling Connection
voltage
(Further Testing
Required)
rylim 3
Alekz System #Energy System1 (ES1) Schematics
Keshe Foundation R&D Group
July 2, 2015
A1 (-) N
Connect to the
OUT KwH Meter
Electricity Grid
B1
(+) L
C2
B3 C1
(+) MGBS-G
(-) Series Connection
C3
IN
DLGC
KwH Meter (-) (+)
Number of
House Load DLGC
is variable
rylim 4
Alekz System
Keshe Foundation R&D Group
July 2, 2015
#Energy System2 (ES2) Schematics
(-) N
OUT
Connect to the
Electricity Grid Single Dynamic
(+) L Gans Reactor
(SDGR)
PTS-NPN
A MGBS-M
(-)
(+) B
(-) C
Energy System1 (ES1) The Flow of Plasma Fields will be from the Higher Strength to the Lower
Strength hence the Es1 Absorbs the Fields and then converted to Electricity
rylim 5
Alekz System
Keshe Foundation R&D Group
July 2, 2015
#Car Fuel System (CFS) Schematics
Single Dynamic
Gans Reactor (SDGR) (-) N
Co2 (Liquid Gans +Nano P. Connect to the Car Battery
+Dry Gans) Loaded OUT (Cigarette Lighter Outlet)
(+) L
PTS-NPN
A MGBS-M
(-)
(+) B
(-) C
(+) MGBS-G
(-)
IN
Fuel Tank
Take Note:
(1) Initially the Cellular phone must be fully charged before connecting the system
this initialize your PTS-NPN.
(2) Design your system to fit permanently to your DC Device / Cellular Phone (a flat cell design)
(3) You can add Gans Cells with Multiple Layers in your PTS-NPN System.
rylim 7
Alekz System
Keshe Foundation R&D Group
July 2, 2015
#Amp/Volt Booster (AVB) Schematic
A S L2
L1
S
L1
L3
(-) L2
L2
O
S
(+)
L1
S
L1
L2
Refer to Page 2
(-) C L1
L2
S L1 S
L2
L1 L2
rylim 8
Alekz System
Keshe Foundation R&D Group
July 3, 2015
Left Right
Head
rylim 10