PLAN

LEGEND

= POND

= RICE FIELD

= BUSH

= TREES Rumah Warga

= TALL GRASS

= HOUSE

= VILLAGE
Jalan

= SIGN MARKER

= CATHODIC PROTECTION TEST POINT Posisi


WITH NUMBER AND TYPE Pipa

= AERIAL MARKER
Kalimalang

= WARNING SIGN

BV = SECTION VALVE STATION

= FENCE

= ROAD
Section 48-48

= RIVER

= BENCH MARK
Rumah Warga
= RAIL WAYS

= PIPE BASEMENT

= AS BUILT PIPE LINE


Jalan

KEY PLAN

Posisi
Pipa
Kalimalang

Section 49-49

Pekerjaan Indirect Dan direct Assesment Tahun 2012


Jalur Pipa Sub Wilayah Bekasi

+ 100.0

+ 90.0

+ 80.0

+ 70.0 Permukaan Tanah


Posisi Pipa
+ 60.0

+ 50.0

+ 40.0

+ 30.0

+ 20.0

+ 10.0

20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
500.00
SBV1-PNB-DG-49-A3