07.02.2016-TCF&Laydown Area-Daily Report
07.02.2016-TCF&Laydown Area-Daily Report
CONSTRUCTION
FACILITIESREFINERY PLOT DAILY REPORT
Name of Contractor : Nesma&Partners Contracting Co. Ltd.
Name of Client : Saudi Aramco Oil Company
Date : 07-February-2016
Weather Condition : Sunny Temperature :
INDIRECT
1 Site Engineer 1 1 1
2 Foreman ( Earthwork) 1 1 1
4 Safety Personnel 1 1 1
5 Formen Ast. 0 0
Total Indirect 3 0 3 0 3 0
DIRECT
1 Labor 7 7 7
2 Driver(Dump Truck)
3 Driver(Articulated Truck) 6 6 6
4 Oprt.(Loader) 2 1 2
5 Oprt.(Scraper) 0
6 Oprt.(Excavator) 2 2 2
7 Oprt.(Dozer) 2 2 2
8 Oprt. (Roller) 2 2 2
9 Oprt. (Grader) 2 1 1
10 Oprt.(Water Galoon) 1 1 1
11 Driver(Water Tanker) 2 1 1
Total Direct 26 0 23 24 0
TOTAL MANPOWER 29 0 26 27 0
Friday Saturday Sunday
2. EQUIPMENT
Day Night Day Night Day Night
Shift Shift Shift Shift Shift Shift
1 Dozer 2 0 2 0 2 0
JAZAN TEMP. CONSTRUCTION
FACILITIESREFINERY PLOT DAILY REPORT
2 Grader 2 0 1 0 1 0
3 Roller 2 0 2 0 2 0
4 Loader 2 0 1 0 2 0
5 Excavator 2 0 2 0 2 0
6 Scraper 0 0 0 0 0 0
7 Dump Truck 0 0 0 0 0 0
8 Articulated Truck 6 0 6 0 6 0
9 Truck (Water Tanker) 2 0 1 0 1 0
10 Water Galoon 1 0 1 0 1 0
11 Pump 1 1 1
12 Tower Light
13 Generator 1 1 1
TOTAL EQUIPMENT 21 0 18 0 19 0
3. Major Highlight and Notes
1
JAZAN TEMP. CONSTRUCTION
FACILITIESREFINERY PLOT DAILY REPORT
33 C
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
Monday Tuesday Wednesday Thursday
Day Night Day Night Day Night Day Night
Shift Shift Shift Shift Shift Shift Shift Shift
0 0 0 0 0 0 0 0
JAZAN TEMP. CONSTRUCTION
FACILITIESREFINERY PLOT DAILY REPORT
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0
0 0 0
0 0 0 0 0
0
JAZAN TEMP. CONSTRUCTION
FACILITIESREFINERY PLOT DAILY REPORT
Progress
4. Progress Summary
Unit Previous Daily Cumulative
TCF
Marl cu.m. - - -
Laydown
Marl cu.m. -
5. Equipment Status
Breakdown
Equipment Total Worked
/Stand By
Dozer 2 12
Grader 1 12
Roller 2 12
Loader 2 12
Excavator 2 12
Scraper
Dump Truck 6 12
Articulated Truck 0 0
Water Galoon 1 0
Pump 1 12
JAZAN TEMP. CONSTRUCTION
FACILITIESREFINERY PLOT DAILY REPORT
Tower Light 0 0
Generator 1 12
JAZAN TEMP. CONSTRUCTION
FACILITIESREFINERY PLOT DAILY REPORT
Progress
Remarks
Budgeted Percentage (%)
227,259.00 93.51%
81,812.00 89.50%
47,999.00 100.00%
34,088.85 0.00%
247,062.00 45.05%
52,514.00 37.30%
84,861.00 35.73%
37,059.30 0.00%