Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

time pv co level

46 Fig100
4.2 Graph2.9between97Time(Sec) and Process Value(mm)
100 200 2.9 194
412160 300 2.9 295
218 400 2.8 400
367264 415 0 415

322

277

232

187

142

97
46 96 146 196 246

Fig 4.3 Graph Between Time(Sec) and Controller Output (%)

397

347

297

247

197

147

97
0 0.5 1 1.5 2 2.5 3 3.5
Fig 4.4 Graph Between Water level(mm) and Controller
Output(%)
3

2.5

1.5

0.5

0
0 50 100 150 200 250 300

You might also like