Professional Documents
Culture Documents
WHP (Bar) WHP (Bar)
WHP (Bar) WHP (Bar)
B. Test data
Temps Flowline Press en tte fill in start time and pressure readings every 10 minutes
(Heur)
(heur) (bar) (bar)
8:30 31.49 start pressure
8:45 43.66 final pressure after 17 hours
leak 94493 scf/h leak rate must be less than 900 scf/hour
rate
HH-1 0 sec. how many seconds to build full pressure on TRSSSV gauge
(in) ft
D1 13.375 1.110125
D2 9.625 0.798875
m ft
B-Ann_Leng 1526.47 5008.043
ft^3
B-Ann_Vol 2335.893
[m] [ft] [in] [ft^3/ft] [ft3] 2
3.28084 well depth depth tubing ID capacity volume
3
3
2
2
2
In Salah Gas
TRSSSV inflow test
A. Well Info
Well Number: Teg-18
Date: Friday, December 30, 2011
Objective: inflow test TRSSSV according to API 14H
B. Test data
Temps Flowline Press en tte fill in start time and pressure readings every 10 minutes
(Heur)
(heur) (bar) (bar)
8:30 20.21 start pressure
8:45 22.05 final pressure after 17 hours
leak 4983 scf/h leak rate must be less than 900 scf/hour
rate
HH-1 0 sec. how many seconds to build full pressure on TRSSSV gauge
(in) ft
D1 9.625 0.798875
D2 7 0.581
m ft
B-Ann_Leng 1017 3336.574
ft^3
B-Ann_Vol 787.4401