TAN iV PAU
THE LARGEST INTERNATIONAL POWER PLANT 6
CPU: NUUU MAUL P Ne AC TPA
26 = 28% JULY 2017
JI EXP0 KEMAYORAN.. JAKARTA . INDONESIA
“ENCOURAGE INDONESTAN GOVERNMENT 35.000 MEGAWATT PROGRAM”
FEATURING MAJOR INDUSTRIES
- POWERPLANT (GEOTHERMAL, SOLAR ENERGY,
COAL FIRE, HYDROPOWER, ETC)
= MANUFACTURING = AUTOMATION
(MACHINERIES TECHNOLOGIES, EQUIPMENTS,
SERVICES & Bic SUPPORTING INDUSTRIES)
¥
CHAMBER OF COKMERCE a4D HOUSTRY —ypusrey oF rnonesza TENDER al KREAST INDOESTA
MEDIA PARTNERS: ASSOCIATION SUPPORT :
Asasissiaad
EQUIPMENT ASIANPOWER Indotrading.n exsrorasr® a Pe
om A mes) STE GK SNe Nan
FESTINDO Bn Asosiosi Pobrikon Modul
cere ce APAMSI Surya Indonesio
aes siunewsan Tadonesiaf
: Enencyie Sa Oe
indor ck, Elektrik [~2QIe722 GIUESH Asia Power quality Thitiotive
a Asosiosi Pertomb onganBatubara
Dysrpae. donesia P
Tn
C—O
www.myexpo.co.id -aan 2017 HU ean Se RIN Y at
ABOUT THE EVENT
POWERMAX 2017is a unique and attractive international
Cee uted
properly which is focus on advanced. technologies,
DC ee a
DO ee ce ea cad
platform to network business globally and meet up with
Sa Roe Td
ms technologies, machineries, equipment, and services to
spur the manufacturing growth and enhance industry.
Ce aus
“> ~ POWERMAX 2017 dedicated for answering the opportunities and challenges of industry Power Plant and
Dre tL ee a Ea tac
Ore Re Lee reer)
Dene a ee Recast aac Reece)
Megawatt (MW) and supply the energy national throughout blueprint National Energy Supply Agency
(Badan Pengelola Energi Nasional) 2010-2025. POWERMAX 2017 is expected to be an appropriate platform
for accelerate national industry and economic growth.
INTERESTING FACTS
ee
INDONESIA STUMBLES ON MEGAPOWER PROJECT =
Luau athe dur ras Al}
of electricity capacity by 2019 has hit a couple of speed bumps since it
‘was announced last year, prompting President Joko “Jokowi” Widodo to
OR eeu rere eo
eee ei heed Rakes
eC une un teat kta eLl}
Beebe armen meu)
PERTAMINA & PLN AGREEMENT ON DEVELOPMENT
Specifically, in the attempt to achieve the 35.000 megawatt (MW)
Ata mer cee el Coma
Per Rn alas Oa Lag
Peete ccc at can
(tempo.co 12 February, 2016)
SIP ream aur er ear Rrra
Cae eee
ee ae rae rg
Island. Since the program was initiated In 2011, the elsctrifi
‘of Sumba Island has increased significantly from 24.5% in 2010 to
Oe eet nner oat
42.67% in 203
Island will require total investment of US § 428.4 million.
Ce ue Raa te ua cae
ge eu amt mile ry
Re ed cd aes ACC!
ee aa toda tac a Baas etd
Pee Reet i ec ou ceFRAUEN ee aa 2017
TG OL Uae a kena ee
rel assed AL he kau cee rato Ed
in Banten, which is targeted to reach completion in three and a half years.This plant is expected
eee ka oe ie ur kar ec ese
(erence)
eeu age ee ee eed ge) ee
with completion target in 2019 namely PLTGU Jawa-3 with capacity of 800 MW in Gresik, East
Java, PLIGU Peaker Jawa Ball-3 with capacity of 500 MW, and PLTGU Peaker Jawa Bali-4 with
Cee ee
ee ne Rune Roe Ou uO Rao ee LL)
Se ere aman sn
Fee eds see UE Ree ec Re
Crud et Sacer cera
Pertamina Geothermal Energy (PGE) will drill 14 geothermal wells this year to pursue additional
Se a ake kk a ke tl ee id
capacity will be in operating this year comprised of Ulubelu unit 4 with capacity of 55 MW and
Karoha unit 4 with capacity of 30 MW.
Sd ee eee ee Ce
velopment of Renewable Energy. Deputy Minister Arcandra Tahar confirms Indonesian govern-
ait Od ese ee nee ae ere
Pte te ua aa eer are
formed Indonesian-Swedish Initiatives for Sustainable Energy Solutions (INSIST) as a scheme of
cooperation to increase technological innovation.
WHO SHOULD EXHIBITS
ee Cae Cee men nore hte eure Cmca eect Me AES es
ware, Bearing, Conveyor , Belt, Steel, Panel Control, Instrumentotion, Generator, Hydro power, Elec-
er Met ua sae aR ea a eae tea
Pumps, Policy makers and Governments related agencies, Geothermal Developers, Resources Com-
panies, Power Plant EPC, Contractors and Services Companies, Drilling Contractors, & Survey Com-
Ue Tac Mere Rese a Racca OM Cs Mc '
Peta ch tet eee RSet Men cee Rec at nt anne ES cel ce
Pence ase ace ecu a enc De ea A ae arid
ne Ne Mer eee ee eA tea
fer oR a CU uM TRO RSS
ORGANIZER
ee.
Sane ed
eR eee ee
ees eum ras ce Renn ous
eee eeu ad
oa ecco cts aS)
5 (eed eae ead eed
aU ETN a]
and avail support international exhibition
Vor ROR tea]
| industry in Indonesix SEAT ree Oe
Ny tecbereanar cy ces OR Cen eee es ten og
le SCTE TES CUCU UU ues ua led ue (le
Proven with the success|of many events, projects. Located inthe center of
Shell Scheme
——
[eyHBTTOR COMPANYS NAME 168
“Built up to
your liking’
350 )per sam
[iieretiscremerackage includes:
r
BOOKING NOW! es
ee
We are keen to:
Exhibit Indoor Raw Area_sqm (Min. 18sqm)
Exhibit Indoor Shell Scheme Area_sqm (Min. 9sqm)
Visit The Show. Please register me early.
For provisional bookings please email this form to:
info@myexpo.co.id