CTSM-082

WOR ISSUED 12-Feb-14


Workscoping Survey 13-Nov-13
AFE Submission 26-May-14
PO Release 4-Jun-14

PCSB Plan
Start Date 8-Jul-14
Finish Date -
Plan Duration -

Plan
Actual
Current Progress
Varians
*As 10/11/2014

1B
Painting System Blast & 1st Coat
Final Coat

Justification: 1. Scattered workscope


2. Small piping
3. Lot of protection works
4. Massive scaffolding job

CTSM-009 P#2
WOR ISSUED 12-Apr-11
Workscoping Survey 15-Dec-13
1st IFC Submission -
2nd IFC Submission 23-Aug-13
3rd IFC Submission 25-May-14
4th AFE Submission 1-Jul-14
PO Release 9-Jul-14

PCSB Plan
Start Date 27-Aug-14
Finish Date -
Plan Duration -

Plan
Actual
Current Progress
Varians
* As 8/11/2014
PFP
Hacking PFP
1st Coat
Painting System
Apply Chartek
Final Coat

Justification: 1. Urgent I-Air Finding 8 m2 completed by 19/10/2014


CTSM-082

20-Nov-13

CASB Plan
2-Sep-14
30-Jan-15
121 Days

21.34%
20.13%
-1.21%
*As 10/11/2014

3202 m2
530 m2
520 m2

1. 082 OSC
a) Work on-hold due to Train-C Shut-down from 12 13
b) Temporary demob for HRH from 02-Oct-14 to 07-Oct

SM-009 P#2

18-Dec-13 *Resurvey

Albi Clab/Firetex/Pittchar
Chartek
Fire rating 1hrs to 1.5 hrs

CASB Plan
14-Sep-14
28-Nov-14
65 Days

40.78%
44.51%
3.73%
* As 8/11/2014
275 m2
166 m2
148 m2
91 m2
91 m2

nding 8 m2 completed by 19/10/2014 2. 009-P2 OSC


a) Hacking work on-hold due to operation concern from
b) Temporary demob for HRH from 02-Oct-14 to 07-Oct
ain-C Shut-down from 12 13-Sep-14.
RH from 02-Oct-14 to 07-Oct-14.
ue to operation concern from 28 30-Sep-14.
RH from 02-Oct-14 to 07-Oct-14.