Title: Measurement Sheet For "CMU" # 1

Project:
Location: Summary B06+B05+B04+B03+B02+B01
Ref: Statement 01
Date:
Main Contractor: M/s ABNIAH

Summary QTY'S
Full QTY
Total Qty
Code Type % Completion
(m2)

A Hollow Block CMU 8 cm 0.00

B Hollow Block CMU 10 cm 0.00

C Hollow Block CMU 15 cm 0.00

D Hollow Block CMU 20 cm 0.00

E Solid Block CMU 10 cm 0.00

F Solid Block CMU 15 cm 0.00

G Solid Block CMU 20 cm 0.00

Total Qty ( this period)


0.00 m2
This Statement

Client Summary Page 1


Title: Measurement Sheet For "CMU" # 1
Project:
Location: Summary B06+B05+B04+B03+B02+B01
Ref: Statement 01
Date:
Main Contractor: Owner State 1 State 2 State 3 State 4
trial State 1 State 2 State 3 State 4
trial State 1 State 2 State 3 State 4
Owner State 2 State 2 State 3 State 4
Owner State 2 State 2 State 3 State 4
Owner State 2 State 2 State 3 State 4
Owner State 2 State 2 State 3 State 4
Owner State 2 State 2 State 3 State 4
Owner State 2 State 2 State 3 State 4 State 4 State 4
Owner State 2 State 2 State 3 State 4 State 4 State 4
Owner State 2 State 2 State 3 State 4
Owner State 2 State 2 State 3 State 4
Owner State 2 State 2 State 3 State 4
Owner State 2 State 2 State 3 State 4
Zone Level Location Mark Code Length Height Full QTY % Client % Qty Client
Zone 01 B01 B01-01 1 F 4.10 3.75 Err:509 40% Err:509
Err:508

Details Page 2
Title: Measurement Sheet For "CMU" # 1
Project:
Location: Summary B06+B05+B04+B03+B02+B01
Ref: Statement 01
Date:
Main Contractor: Owner State 1 State 2 State 3 State 4

Description: Bas. 6 Qty


A: 8cm Hollow Block Err:508
B: 10cm Hollow Block Err:508
C: 15cm Hollow Block Err:508
D: 20cm Hollow Block Err:508
E: 10cm Solid Block Err:508
F: 15cm Solid Block Err:508
G: 20cm Solid Block Err:508
TOTAL (m2) 0.00